Aviation Industrial Park - Peterborough Airport
Federal contribution
$7.0M
$7,000,000
Federal share33%
of $21.0M total eligible cost; the rest comes from other partners.
Schedule
AnnouncedOct 16, 2009
ApprovedJan 4, 2010
20102011
Built
Approved 3 months after the announcement.
- Program
- Infrastructure Stimulus Fund
- Ultimate recipient
- City of Peterborough
- Construction start
- Jun 1, 2010(actual)
- Construction end
- Sep 30, 2011(actual)
Against the original forecast
- Construction start8 months lateforecast Sep 21, 2009
Also in Peterborough
- Design and Construction of New Transit Garage$23.4M
- Charlotte Street Flood Reduction$11.4M
- Bethune Street Sanitary Sewer and Jackson Creek Diversion$8.0M
- Optimize Air Quality Project Group; Hands Free Bottle Filling Project Group$6.8M
- HVAC upgrades; Installation of touchless Handwashing sinks; Portable Replacements; WiFi Access points and network infrastructure; Water bottle filling stations; Window Replacement$6.6M
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 36746 in the federal list. How to read these figures.