Program for the renewal of drinking water and wastewater pipes
Federal contribution
$23,148
Federal share31%
of $74.7K total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedAug 8, 2011
20102011
Built
Approved 7 months before the announcement.
- Program
- Infrastructure Stimulus Fund
- Ultimate recipient
- City of Dolbeau-Mistassini
- Construction start
- Jun 9, 2009(actual)
- Construction end
- Mar 31, 2011(actual)
Against the original forecast
- Construction start2 months lateforecast Apr 6, 2009
Also in Dolbeau-Mistassini
- Construction of a new bridge over the Mistassini river at Dolbeau-Mistassini$13.8M
- Construction of a Railway Bridge on the Mistassini River in Dolbeau-Mistassini$12.1M
- Construction of an Aqua-Gym Complex in Dolbeau-Mistassini$4.4M
- Dolbeau and Mistassini Arenas - Structural Repair and Heating Equipment Modernisation$2.3M
- Development of Vauvert sur le Lac Recreational Tourism Site$1.7M
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 41690 in the federal list. How to read these figures.