THEMUSEUM Reconstruction and Accessibility Renovations
Federal contribution
$351,269
Federal share40%
of $878.2K total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedApr 9, 2021
20222023
Built
Approved 6 weeks before the announcement.
- Program
- Community, Culture & Recreation Infrastructure Stream
- Ultimate recipient
- The Museum
- Construction start
- Sep 12, 2022(actual)
- Construction end
- Mar 30, 2023(actual)
Also in Kitchener
- Stormwater Network Adaptation$50.0M
- Aquatic Centre RBJ Schlegel Park$9.8M
- Installing mechanical ventilation in buildings where none currently exist; Window repair or replacement for fresh air intake$7.9M
- HVAC Upgrades; Upgrading wireless access points; Window replacement; Washroom upgrades; Installing cooling / air conditioning units; room partition replacement$7.6M
- Kitchener Public Library Southwest Community Library$6.0M
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 57673 in the federal list. How to read these figures.