HVAC Project, Region of Peel; Peel Art Gallery, Museum and Archives (PAMA)
Federal contribution
$322,000
Federal share40%
of $805.0K total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedAug 13, 2021
202120222023
Built
Approved 7 months before the announcement.
- Program
- Community, Culture & Recreation Infrastructure Stream
- Ultimate recipient
- Region of Peel
- Construction start
- Dec 15, 2021(actual)
- Construction end
- Dec 15, 2022(actual)
Against the original forecast
- Construction end2 months lateforecast Oct 14, 2022
Also in Peel
- Implementation of Improvements to the Water Supply System in Mississauga$9.1M
- Replacement of Water Mains in Peel$7.5M
- Electrical Upgrades at the Hanlan and Herridge Pumping Stations$5.0M
- Construction of a New 750-mm Water Main on Goreway Drive$5.0M
- Equipment Replacement at the G.E. Booth Water Pollution Control Plant$4.9M
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 57683 in the federal list. How to read these figures.