Repairs and Upgrade to Public Works Garage
Federal contribution
$80,000
Federal share80%
of $100.0K total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedJun 7, 2021
20222023
Built
Approved 3 months before the announcement.
- Program
- COVID-19 Resilience Stream
- Ultimate recipient
- Township of McGarry
- Construction start
- Jun 27, 2022(actual)
- Construction end
- Mar 31, 2023(actual)
Against the original forecast
- Construction start2 months lateforecast Apr 15, 2022
- Construction end4 weeks lateforecast Mar 1, 2023
Also in McGarry
- Virginiatown Collection and Distribution Upgrades$925.3K
- Repair of 10 water valves in the drinking water distribution system$20.1K
- Lateral inspections to determine the condition of the lateral collection system feed lines from customers.$10.0K
- Design needed for the separation of the drinking water and the sewer line as the water line is crossing the sewer line. (phase 1 of 2)$5.0K
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 58941 in the federal list. How to read these figures.