Upgrades at the Charlton Water Treatment Plant
Federal contribution
$80,000
Federal share80%
of $100.0K total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedJun 7, 2021
20222023
Built
Approved 4 months before the announcement.
- Program
- COVID-19 Resilience Stream
- Ultimate recipient
- Municipality of Charlton and Dack
- Construction start
- Jan 19, 2022(actual)
- Construction end
- Dec 31, 2022(actual)
Against the original forecast
- Construction start4 months earlyforecast Jun 1, 2022
Also in Charlton and Dack
- Charlton and Dack Water Treatment Plant Upgrade$33.5K
- Replacement and Installation of existing high lift pumps from 7.5 horsepower to 5 horsepower with variable frequency drives at 50 Agnes Street, Charlton$20.5K
- Purchase and Installation of Variable Frequency Drive Control Units at 50 Agnes Street, Charlton$20.0K
- Purchase and Install 2 of the 3 raw water low lift pumps at 50 Agnes Street, Charlton$4.0K
- Installation of a new 4 inch treated water flow meter at 50 Agnes Street, Charlton$3.5K
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 58953 in the federal list. How to read these figures.