Purchase and Installation of Variable Frequency Drive Control Units at 50 Agnes Street, Charlton
Federal contribution
$20,000
Federal share50%
of $40.0K total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedMay 24, 2017
2018
Built
Approved 2 weeks before the announcement.
- Program
- Clean Water and Wastewater Fund
- Ultimate recipient
- Municipality of Charlton and Dack
- Construction start
- Aug 1, 2017(actual)
- Construction end
- Aug 15, 2018(actual)
Against the original forecast
- Construction end5 months lateforecast Mar 31, 2018
Also in Charlton and Dack
- Upgrades at the Charlton Water Treatment Plant$80.0K
- Charlton and Dack Water Treatment Plant Upgrade$33.5K
- Replacement and Installation of existing high lift pumps from 7.5 horsepower to 5 horsepower with variable frequency drives at 50 Agnes Street, Charlton$20.5K
- Purchase and Install 2 of the 3 raw water low lift pumps at 50 Agnes Street, Charlton$4.0K
- Installation of a new 4 inch treated water flow meter at 50 Agnes Street, Charlton$3.5K
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 48679 in the federal list. How to read these figures.