Roof repair, parapet, and masonry repair of the lower part of the towers including replacement of existing openings-CLSC Les jardins du Monastère
Federal contribution
$728,000
Federal share80%
of $910.0K total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedJul 7, 2021
2022
Built
Approved 5 months before the announcement.
- Program
- COVID-19 Resilience Stream
- Ultimate recipient
- Centre intégré universitaire de santé et de services sociaux du SaguenayLac-Saint-Jean
- Construction start
- Jun 7, 2021(actual)
- Construction end
- Jun 30, 2022(actual)
Also in Dolbeau-Mistassini
- Construction of a new bridge over the Mistassini river at Dolbeau-Mistassini$13.8M
- Construction of a Railway Bridge on the Mistassini River in Dolbeau-Mistassini$12.1M
- Construction of an Aqua-Gym Complex in Dolbeau-Mistassini$4.4M
- Dolbeau and Mistassini Arenas - Structural Repair and Heating Equipment Modernisation$2.3M
- Development of Vauvert sur le Lac Recreational Tourism Site$1.7M
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 58991 in the federal list. How to read these figures.