Addition of New Generators at Long-Term Care Site
Federal contribution
$2.6M
$2,600,000
Federal share80%
of $3.3M total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedJun 29, 2021
202220232024
Built
Approved 3 months before the announcement.
- Program
- COVID-19 Resilience Stream
- Ultimate recipient
- Regional Municipality of Waterloo
- Construction start
- Jul 12, 2021(actual)
- Construction end
- Dec 6, 2023(actual)
Against the original forecast
- Construction end4 weeks earlyforecast Dec 31, 2023
Also in Kitchener
- Stormwater Network Adaptation$50.0M
- Aquatic Centre RBJ Schlegel Park$9.8M
- Installing mechanical ventilation in buildings where none currently exist; Window repair or replacement for fresh air intake$7.9M
- HVAC Upgrades; Upgrading wireless access points; Window replacement; Washroom upgrades; Installing cooling / air conditioning units; room partition replacement$7.6M
- Kitchener Public Library Southwest Community Library$6.0M
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 60043 in the federal list. How to read these figures.