Outdoor Digital Marquee and Theatrical Lighting System
Federal contribution
$44,920
Federal share40%
of $112.3K total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedApr 29, 2022
2023
Built
- Program
- Community, Culture & Recreation Infrastructure Stream
- Ultimate recipient
- J.M. Drama Alumni
- Construction start
- Sep 28, 2022(actual)
- Construction end
- Aug 18, 2023(actual)
Against the original forecast
- Construction end7 months lateforecast Feb 1, 2023
Also in Kitchener
- Stormwater Network Adaptation$50.0M
- Aquatic Centre RBJ Schlegel Park$9.8M
- Installing mechanical ventilation in buildings where none currently exist; Window repair or replacement for fresh air intake$7.9M
- HVAC Upgrades; Upgrading wireless access points; Window replacement; Washroom upgrades; Installing cooling / air conditioning units; room partition replacement$7.6M
- Kitchener Public Library Southwest Community Library$6.0M
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 63336 in the federal list. How to read these figures.