St. Lawrence Lodge- Replace Aging HVAC Equipment and Controls
Federal contribution
$873,192
Federal share80%
of $1.1M total eligible cost; the rest comes from other partners.
Schedule
AnnouncedApr 16, 2021
ApprovedJun 13, 2023
202220232024
Built
Approved 2.2 years after the announcement.
- Program
- COVID-19 Resilience Stream
- Ultimate recipient
- St. Lawrence Lodge - St. Lawrence Lodge Long Term Care Home
- Construction start
- Jun 1, 2023(actual)
- Construction end
- Apr 30, 2024(actual)
Also in Brockville
- Brockville Water Pollution Control Centre Upgrade$22.3M
- Construction of the Maritime Discovery Centre of the 1000 Islands (MDC)$5.7M
- HVAC, Bottle Water Filling Station, Portable, Retrofits, Wifi, Windows$5.2M
- Automatic Door Opener; Video Camera Childcare Project Group; Washroom Project Group; Site Project Group; HVAC Ventilation Upgrades$2.1M
- To replace aging HVAC Equipment and Controls.$2.0M
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 67942 in the federal list. How to read these figures.