3projects·$1.2Mfederal of $2.1M eligible
Accessibility Work
$106.9KLoretteville · Healthcare Infrastructure
complete·approved 2021
Adaptation work on the radiology room required to replace the existing equipment
$323.7KLoretteville · Ventilation
complete·approved 2021
Redesign of step-level pressure controls in the Loretteville and St-Émile sector
$763.7KQuébec · Drinking Water
complete·approved 2017
| Project | Location | Category | Status | Federal | Total | Approved |
|---|---|---|---|---|---|---|
| Accessibility Work Centre intégré universitaire de santé et de services sociaux de la Capitale-Nationale | Loretteville | Healthcare Infrastructure | complete | $106.9K | $133.6K | 2021 |
| Adaptation work on the radiology room required to replace the existing equipment Centre intégré universitaire de santé et de services sociaux de la Capitale-Nationale | Loretteville | Ventilation | complete | $323.7K | $404.6K | 2021 |
| Redesign of step-level pressure controls in the Loretteville and St-Émile sector City of Québec | Québec | Drinking Water | complete | $763.7K | $1.5M | 2017 |