54projects·$636.9Mfederal of $1.9B eligible
Testing an innovative leak detection approach and comparative analysis with traditional methods
$50.0KMontréal · Capacity Building
complete·approved 2008
Prioritization system and preliminary analysis of type of intervention required for sewer mains
$50.0KMontréal · Capacity Building
complete·approved 2008
Simulation of measures for adapting to climate change (urban drainage)
$47.9KMontréal · Capacity Building
complete·approved 2007
Report on pavement rehabilitation on the Montreal territory
$47.8KMontréal · Capacity Building
complete·approved 2008
| Project | Location | Category | Status | Federal | Total | Approved |
|---|---|---|---|---|---|---|
| Testing an innovative leak detection approach and comparative analysis with traditional methods City of Montréal | Montréal | Capacity Building | complete | $50.0K | $150.0K | 2008 |
| Prioritization system and preliminary analysis of type of intervention required for sewer mains City of Montréal | Montréal | Capacity Building | complete | $50.0K | $165.9K | 2008 |
| Simulation of measures for adapting to climate change (urban drainage) City of Montréal | Montréal | Capacity Building | complete | $47.9K | $150.0K | 2007 |
| Report on pavement rehabilitation on the Montreal territory City of Montréal | Montréal | Capacity Building | complete | $47.8K | $150.0K | 2008 |