54projects·$636.9Mfederal of $1.9B eligible
Upgrades to Disinfection at Jean R. Marcotte Wastewater Treatment Facility in Montreal
$63.8MMontréal · Wastewater
underway·approved 2009
Montreal Atwater and Charles-J.-Des Baillets Water
$58.5MMontréal · Drinking Water
complete·approved 2006
Protecting and Improving the Resilience of the Pierrefonds-Roxboro Area to Flooding
$50.0MMontréal · Disaster Mitigation
underway·approved 2019
Project Addressing Combined Sewer Overflows in Montreal
$49.3MMontréal · Wastewater
underway·approved 2009
Quartier des Spectacles - Montreal
$40.0MMontréal · Culture
complete·approved 2008
Infrastructure work on major water and wastewater facilities in Metropolitan Montreal
$39.2MMontréal · Drinking Water
complete·approved 2011
Water pipe replacement
$37.4MMontréal · Drinking Water
complete·approved 2017
Rehabilitation of shorelines threatened by accelerated erosion in the main waterfront parks
$34.4MMontréal · Disaster Mitigation
approved·approved 2020
Biomethanation and composting project in Montreal
$33.1MMontréal · Solid Waste Management
underway·approved 2017
Infrastructure work on major water and wastewater facilities in Metropolitan Montreal
$32.4MMontréal · Drinking Water
complete·approved 2011
Outremont Switching Yard
$30.0MMontréal · Brownfield Remediation And Redevelopment
underway·approved 2009
Construction of retention structures for the control of overflows and overloads of combined sewer systems of combined sewer systems during heavy rainfall (Turcot)
$28.0MMontréal · Disaster Mitigation
approved·approved 2019
Construction of a retention structure to reduce overflows during heavy rainfall (Ouvrage St-Thomas)
$21.3MMontréal · Disaster Mitigation
approved·approved 2019
Construction of an oxygen production plant at the wastewater treatment plant
$13.7MMontréal · Wastewater
approved·approved 2013
Renovation and Reconstruction of the Gadbois Recreation Center
$12.0MMontréal · Recreation
approved·approved 2021
Construction of a multipurpose sports complex in St-Laurent
$11.7MMontréal · Sport
complete·approved 2009
Program for the renewal of drinking water and wastewater pipes
$7.3MMontréal · Wastewater
complete·approved 2010
Construction of indoor soccer center near St-Michel environmental complex
$6.3MMontréal · Sport
complete·approved 2009
Reconstruction of the sports and recreation center
$6.3MMontréal-Ouest · Recreation
approved·approved 2021
Program for the renewal of drinking water and wastewater pipes
$5.2MMontréal · Wastewater
complete·approved 2010
Updating the Dollard-Saint-Laurent arena
$4.2MMontréal · Recreation
approved·approved 2021
Water System Upgrades
$4.0MMontréal · Wastewater
complete·approved 2020
Water System Upgrades
$4.0MMontréal · Wastewater
complete·approved 2020
Water System Upgrades
$4.0MMontréal · Wastewater
complete·approved 2020
Water System Upgrades
$4.0MMontréal · Wastewater
complete·approved 2020
Water System Upgrades
$4.0MMontréal · Wastewater
complete·approved 2020
Water System Upgrades
$4.0MMontréal · Wastewater
complete·approved 2020
Upgrade of the Saint-Jean-Vianney sports complex
$3.4MMontréal · Recreation
approved·approved 2021
Redevelopment of Matte and Lapierre Streets of the Montreal-Nord Borough
$3.3MMontréal · Active Transportation
approved·approved 2022
Renovation and expansion of the Trenholme sports center
$3.1MMontréal · Recreation
approved·approved 2021
Program for the renewal of drinking water and wastewater pipes
$2.9MMontréal · Wastewater
complete·approved 2009
Water System Upgrades
$2.3MMontréal · Wastewater
complete·approved 2020
Program for the renewal of drinking water and wastewater pipes
$2.0MMontréal · Wastewater
complete·approved 2010
Partial Renovation and Upgrading of the Patro Prevost Centre
$1.6MMontréal · Recreation
approved·approved 2021
Shared street on boulevard Gouin Est in the borough of Ahuntsic-Cartierville
$1.6MMontréal · Active Transportation
complete·approved 2022
Safe Active Transportation Around Ahuntsic-Cartierville Schools and Seniors Residences
$1.4MMontréal · Active Transportation
complete·approved 2022
Renovation of Soccer Fields at Hébert Park
$1.4MMontréal · Recreation
approved·approved 2021
Program for the renewal of drinking water and wastewater pipes
$1.1MMontréal · Wastewater
complete·approved 2010
Program for the renewal of drinking water and wastewater pipes
$1.0MMontréal · Wastewater
complete·approved 2011
Renewal of water pipes
$869.1KMontréal-Ouest · Drinking Water
complete·approved 2017
Geometric redesign of Boucher Street in the borough of Plateau-Mont-Royal
$817.1KMontréal · Active Transportation
complete·approved 2022
Wastewater collection system rehabilitation in Montreal East
$663.5KMontréal-Est · Wastewater
complete·approved 2016
Program for the renewal of drinking water and wastewater pipes
$424.5KMontréal-Ouest · Wastewater
complete·approved 2010
Replacement of wastewater pipes and sewage separation
$285.2KMontréal-Ouest · Wastewater
complete·approved 2017
Program for the renewal of drinking water and wastewater pipes
$187.8KMontréal-Est · Wastewater
complete·approved 2010
Active mobility study of the Borough of Montreal-Nord
$50.0KMontréal · Capacity Building
approved·approved 2022
Active mobility planning as part of a sustainable mobility plan for the Verdun Borough
$50.0KMontréal · Capacity Building
approved·approved 2022
Mobility study - Bicycle infrastructure on rue de Terrebonne between avenue Belmore and avenue Girouard in the Borough of Côte-des-Neiges-Notre-Dame-de-Grâce
$50.0KMontréal · Capacity Building
complete·approved 2022
Testing various methods for measuring the hydraulic performance of mains
$50.0KMontréal · Capacity Building
complete·approved 2008
Development of a condition rating system for sewer manholes with MACP nomenclature
$50.0KMontréal · Capacity Building
complete·approved 2008
| Project | Location | Category | Status | Federal | Total | Approved |
|---|---|---|---|---|---|---|
| Upgrades to Disinfection at Jean R. Marcotte Wastewater Treatment Facility in Montreal City of Montréal | Montréal | Wastewater | underway | $63.8M | $150.0M | 2009 |
| Montreal Atwater and Charles-J.-Des Baillets Water City of Montréal | Montréal | Drinking Water | complete | $58.5M | $234.0M | 2006 |
| Protecting and Improving the Resilience of the Pierrefonds-Roxboro Area to Flooding City of Montréal | Montréal | Disaster Mitigation | underway | $50.0M | $133.5M | 2019 |
| Project Addressing Combined Sewer Overflows in Montreal City of Montréal | Montréal | Wastewater | underway | $49.3M | $148.0M | 2009 |
| Quartier des Spectacles - Montreal City of Montréal | Montréal | Culture | complete | $40.0M | $156.1M | 2008 |
| Infrastructure work on major water and wastewater facilities in Metropolitan Montreal City of Montréal | Montréal | Drinking Water | complete | $39.2M | $117.7M | 2011 |
| Water pipe replacement City of Montréal | Montréal | Drinking Water | complete | $37.4M | $74.9M | 2017 |
| Rehabilitation of shorelines threatened by accelerated erosion in the main waterfront parks City of Montréal | Montréal | Disaster Mitigation | approved | $34.4M | $85.9M | 2020 |
| Biomethanation and composting project in Montreal City of Montréal | Montréal | Solid Waste Management | underway | $33.1M | $130.7M | 2017 |
| Infrastructure work on major water and wastewater facilities in Metropolitan Montreal City of Montréal | Montréal | Drinking Water | complete | $32.4M | $98.3M | 2011 |
| Outremont Switching Yard City of Montréal | Montréal | Brownfield Remediation And Redevelopment | underway | $30.0M | $120.0M | 2009 |
| Construction of retention structures for the control of overflows and overloads of combined sewer systems of combined sewer systems during heavy rainfall (Turcot) City of Montréal | Montréal | Disaster Mitigation | approved | $28.0M | $70.0M | 2019 |
| Construction of a retention structure to reduce overflows during heavy rainfall (Ouvrage St-Thomas) City of Montréal | Montréal | Disaster Mitigation | approved | $21.3M | $53.2M | 2019 |
| Construction of an oxygen production plant at the wastewater treatment plant City of Montréal | Montréal | Wastewater | approved | $13.7M | $32.1M | 2013 |
| Renovation and Reconstruction of the Gadbois Recreation Center City of Montréal | Montréal | Recreation | approved | $12.0M | $30.0M | 2021 |
| Construction of a multipurpose sports complex in St-Laurent City of Montréal | Montréal | Sport | complete | $11.7M | $35.0M | 2009 |
| Program for the renewal of drinking water and wastewater pipes City of Montréal | Montréal | Wastewater | complete | $7.3M | $23.5M | 2010 |
| Construction of indoor soccer center near St-Michel environmental complex City of Montréal | Montréal | Sport | complete | $6.3M | $19.0M | 2009 |
| Reconstruction of the sports and recreation center City of Montréal West | Montréal-Ouest | Recreation | approved | $6.3M | $19.3M | 2021 |
| Program for the renewal of drinking water and wastewater pipes City of Montréal | Montréal | Wastewater | complete | $5.2M | $16.8M | 2010 |
| Updating the Dollard-Saint-Laurent arena City of Montréal | Montréal | Recreation | approved | $4.2M | $12.7M | 2021 |
| Water System Upgrades City of Montréal | Montréal | Wastewater | complete | $4.0M | $10.0M | 2020 |
| Water System Upgrades City of Montréal | Montréal | Wastewater | complete | $4.0M | $10.0M | 2020 |
| Water System Upgrades City of Montréal | Montréal | Wastewater | complete | $4.0M | $10.0M | 2020 |
| Water System Upgrades City of Montréal | Montréal | Wastewater | complete | $4.0M | $10.0M | 2020 |
| Water System Upgrades City of Montréal | Montréal | Wastewater | complete | $4.0M | $9.9M | 2020 |
| Water System Upgrades City of Montréal | Montréal | Wastewater | complete | $4.0M | $9.9M | 2020 |
| Upgrade of the Saint-Jean-Vianney sports complex City of Montréal | Montréal | Recreation | approved | $3.4M | $10.3M | 2021 |
| Redevelopment of Matte and Lapierre Streets of the Montreal-Nord Borough City of Montréal | Montréal | Active Transportation | approved | $3.3M | $4.1M | 2022 |
| Renovation and expansion of the Trenholme sports center City of Montréal | Montréal | Recreation | approved | $3.1M | $9.4M | 2021 |
| Program for the renewal of drinking water and wastewater pipes City of Montréal | Montréal | Wastewater | complete | $2.9M | $9.4M | 2009 |
| Water System Upgrades City of Montréal | Montréal | Wastewater | complete | $2.3M | $5.9M | 2020 |
| Program for the renewal of drinking water and wastewater pipes City of Montréal | Montréal | Wastewater | complete | $2.0M | $6.5M | 2010 |
| Partial Renovation and Upgrading of the Patro Prevost Centre City of Montréal | Montréal | Recreation | approved | $1.6M | $4.9M | 2021 |
| Shared street on boulevard Gouin Est in the borough of Ahuntsic-Cartierville City of Montréal | Montréal | Active Transportation | complete | $1.6M | $2.6M | 2022 |
| Safe Active Transportation Around Ahuntsic-Cartierville Schools and Seniors Residences City of Montréal | Montréal | Active Transportation | complete | $1.4M | $2.4M | 2022 |
| Renovation of Soccer Fields at Hébert Park City of Montréal | Montréal | Recreation | approved | $1.4M | $4.2M | 2021 |
| Program for the renewal of drinking water and wastewater pipes City of Montréal | Montréal | Wastewater | complete | $1.1M | $3.6M | 2010 |
| Program for the renewal of drinking water and wastewater pipes City of Montréal | Montréal | Wastewater | complete | $1.0M | $3.4M | 2011 |
| Renewal of water pipes City of Montréal West | Montréal-Ouest | Drinking Water | complete | $869.1K | $2.5M | 2017 |
| Geometric redesign of Boucher Street in the borough of Plateau-Mont-Royal City of Montréal | Montréal | Active Transportation | complete | $817.1K | $1.4M | 2022 |
| Wastewater collection system rehabilitation in Montreal East City of Montréal East | Montréal-Est | Wastewater | complete | $663.5K | $2.0M | 2016 |
| Program for the renewal of drinking water and wastewater pipes City of Montréal-Ouest | Montréal-Ouest | Wastewater | complete | $424.5K | $1.4M | 2010 |
| Replacement of wastewater pipes and sewage separation City of Montréal West | Montréal-Ouest | Wastewater | complete | $285.2K | $855.6K | 2017 |
| Program for the renewal of drinking water and wastewater pipes City of Montréal-Est | Montréal-Est | Wastewater | complete | $187.8K | $606.0K | 2010 |
| Active mobility study of the Borough of Montreal-Nord City of Montréal | Montréal | Capacity Building | approved | $50.0K | $50.0K | 2022 |
| Active mobility planning as part of a sustainable mobility plan for the Verdun Borough City of Montréal | Montréal | Capacity Building | approved | $50.0K | $80.0K | 2022 |
| Mobility study - Bicycle infrastructure on rue de Terrebonne between avenue Belmore and avenue Girouard in the Borough of Côte-des-Neiges-Notre-Dame-de-Grâce City of Montréal | Montréal | Capacity Building | complete | $50.0K | $165.4K | 2022 |
| Testing various methods for measuring the hydraulic performance of mains City of Montréal | Montréal | Capacity Building | complete | $50.0K | $150.0K | 2008 |
| Development of a condition rating system for sewer manholes with MACP nomenclature City of Montréal | Montréal | Capacity Building | complete | $50.0K | $150.0K | 2008 |