Water Treatment Plant Upgrades
Federal contribution
$80,000
Federal share80%
of $100.0K total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedJun 7, 2021
2022
Built
Approved 4 months before the announcement.
- Program
- COVID-19 Resilience Stream
- Ultimate recipient
- Town of Bruce Mines
- Construction start
- Nov 8, 2021(actual)
- Construction end
- Apr 30, 2022(actual)
Also in Bruce Mines
- Reconstruction of a Section of Highway 638 in Bruce Mines$503.3K
- Rehabilitation of Downtown Highway Corridor$400.0K
- Rehabilitation of Old Soo Road$193.6K
- Installation of a new Aeration System for the treatment of high levels of THMs (Trihalomethanes) at the pumping station$17.5K
- Conduct a Study and Videography (camera) of the Town's Wastewater Collection System$12.7K
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 58812 in the federal list. How to read these figures.