Replacement of the 600-3 phase secondary distribution panels (1 hand and 4 circuits) at the Sainte-Catherine building of the Sainte-Catherine building of the Centre de soins prolongés Grace Dart
Federal contribution
$263,637
Federal share80%
of $329.5K total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedJul 7, 2021
202220232024
Built
Approved 5 months before the announcement.
- Program
- COVID-19 Resilience Stream
- Ultimate recipient
- Centre intégré universitaire de santé et de services sociaux de l'Ouest-de-l'Île-de-Montréal
- Construction start
- Sep 27, 2023(actual)
- Construction end
- Mar 15, 2024(actual)
Against the original forecast
- Construction end4 months earlyforecast Jun 30, 2024
Also in Montréal-Ouest
- Reconstruction of the sports and recreation center$6.3M
- Replacement of MCCs (Main Electrical Distribution) at Lakeshore General Hospital (LGH) - Phase 5$2.1M
- Repair and upgrades to the University Family Medicine Group (GMF-U) department as well as to the H Norma and Robert Hayes buildings of the St. Mary's Hospital Center (SMHC)$1.2M
- Increase in the capacity of the electrical panel at the long term care facility - Centre d'hébergement (CH) de Lachine$960.0K
- Renewal of water pipes$869.1K
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 58853 in the federal list. How to read these figures.