Replacement of roofs
Federal contribution
$628,014
Federal share75%
of $841.5K total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedJul 8, 2021
20222023
Built
Approved 4 months before the announcement.
- Program
- COVID-19 Resilience Stream
- Ultimate recipient
- Cégep Beauce-Appalaches
- Construction start
- May 2, 2022(actual)
- Construction end
- Dec 19, 2022(actual)
Against the original forecast
- Construction end2 weeks lateforecast Dec 3, 2022
Also in Saint-Georges
- Construction of a retaining wall (Quai Pinon)$6.6M
- Program for the renewal of drinking water and wastewater pipes$1.3M
- 25th Avenue extension and connection to future 74th Street (access road to Highway 73)$462.6K
- Repair work on Lacroix Blvd, south end (between Streets 127 and 135 and Streets 159 and 193.)$427.7K
- Renewal of water pipes$327.7K
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 59155 in the federal list. How to read these figures.