Espanola General Hospital (operating as Espanola Nursing Home-LTC)- LTC Home - HVAC/Isolation / IPC Infrastructure - Phase II
Federal contribution
$479,776
Federal share80%
of $599.7K total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedDec 3, 2024
202420252026
Built
Approved 18 months before the announcement.
- Program
- COVID-19 Resilience Stream
- Ultimate recipient
- Espanola General Hospital - Espanola General Hospital (operating as Espanola Nursing Home-LTC)
- Construction start
- Jun 13, 2023(actual)
- Construction end
- Dec 31, 2025(actual)
Also in Espanola
- Long-Term Care (LTC) Home - HVAC/Isolation/Infection Prevention and Control (IPC) Infrastructure$4.0M
- Mead Boulevard Watermain Replacement$2.0M
- Phase 1F water/wastewater infrastructure renewal$1.2M
- Replacement of Avery Drive Forcemain$766.5K
- Infrastructure Renewal Project Phase 2 for the rehabilitation of approximately 6.7 km of water, wastewater and stormwater infrastructure$289.4K
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 67944 in the federal list. How to read these figures.