15projects·$4.1Mfederal of $10.2M eligible
Purchase new well level probe for main well for the township which serves 440 residents and 160 service connections. Located at the Elk Lake Water Treatment plant, 4 First Street.
$1.2KJames · Drinking Water
complete·approved 2017
Repair programmable logic controller (PLC) at the water treatment plant. Located at the Elk Lake water Treatment plant, 4 First Street which serves 440 residents and 160 service connections.
$6.0KJames · Drinking Water
complete·approved 2017
Enhance programmable logic controller (PLC) at the water treatment plant. Located at the Elk Lake water Treatment plant, 4 First Street which serves 245 houses
$11.2KJames · Drinking Water
complete·approved 2017
Improvements to Grey Street Drainage
$66.7KElk Lake · Wastewater
complete·approved 2009
Inflow and Infiltration (I/I) into Sanitary Sewer Mitigation and Cast-Iron Watermain Replacement on James Street (Forfar Street to Churchill Cres)
$90.5KCentre Wellington · Wastewater
complete·approved 2017
Construction of 1500mm Stormwater Outfall at James Street - Neebing River to Riverview Drive
$125.0KThunder Bay · Wastewater
complete·approved 2017
Replacement of the Makobe River Bridge
$129.5KElk Lake · Highways and Roads
complete·approved 2009
Engineering Design for future sewer separation and watermain replacement (Drummond Road, St. Peter Avenue, Fifth Avenue, and St. James Avenue)
$171.2KNiagara Falls · Wastewater
complete·approved 2017
Outdoor Rink Roof
$228.8KJames · Recreation
complete·approved 2021
Construction of 1500mm Storm Sewer on James Street - Riverview Dr to Arthur Street
$325.2KThunder Bay · Wastewater
complete·approved 2018
Elk Lake James Street Stormwater Rehabilitation
$338.2KJames · Wastewater
complete·approved 2020
Sanitary sewer replacement on King St from Arthur St to Dunlop St., James St from Kings St. to Centre St., & Ontario St. W. from Henry St. to King St.
$456.2KDurham · Wastewater
complete·approved 2018
Construction of 1200mm Twin Relief Storm Sewer and Outfall at James Street - Neebing River to Churchill Drive
$466.0KThunder Bay · Wastewater
complete·approved 2017
Watermain replacement on King St from Arthur St to Dunlop St., James St from Kings St. to Centre St., & Ontario St. W. from Henry St. to King St.
$611.4KDurham · Drinking Water
complete·approved 2018
Reconstruction of Watermains under James, Gibson and Mary Streets
$1.1MParry Sound · Drinking Water
complete·approved 2009