Refurbishment and upgrading of laboratory drainage system and plumbing equipment
Federal contribution
$79,080
Federal share80%
of $98.8K total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedJul 7, 2021
202220232024
Built
Approved 4 months before the announcement.
- Program
- COVID-19 Resilience Stream
- Ultimate recipient
- Centre intégré de santé et de services sociaux de Chaudière-Appalaches
- Construction start
- Apr 26, 2021(actual)
- Construction end
- Dec 15, 2023(actual)
Against the original forecast
- Construction end2 weeks earlyforecast Dec 31, 2023
Also in Saint-Georges
- Construction of a retaining wall (Quai Pinon)$6.6M
- Program for the renewal of drinking water and wastewater pipes$1.3M
- Replacement of roofs$628.0K
- 25th Avenue extension and connection to future 74th Street (access road to Highway 73)$462.6K
- Repair work on Lacroix Blvd, south end (between Streets 127 and 135 and Streets 159 and 193.)$427.7K
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 59040 in the federal list. How to read these figures.