Rehabilitation of the domestic water network and replacement of the boiler and domestic hot water tanks
Federal contribution
$160,000
Federal share80%
of $200.0K total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedJul 7, 2021
20222023
Built
Approved 4 months before the announcement.
- Program
- COVID-19 Resilience Stream
- Ultimate recipient
- Centre intégré de santé et de services sociaux de Chaudière-Appalaches
- Construction start
- May 3, 2021(actual)
- Construction end
- Mar 20, 2023(actual)
Against the original forecast
- Construction end3 months lateforecast Dec 16, 2022
Also in Saint-Georges
- Construction of a retaining wall (Quai Pinon)$6.6M
- Program for the renewal of drinking water and wastewater pipes$1.3M
- Replacement of roofs$628.0K
- 25th Avenue extension and connection to future 74th Street (access road to Highway 73)$462.6K
- Repair work on Lacroix Blvd, south end (between Streets 127 and 135 and Streets 159 and 193.)$427.7K
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 59255 in the federal list. How to read these figures.