Robert Hartley Sports Complex COVID Improvements
Federal contribution
$140,000
Federal share80%
of $175.0K total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedJun 15, 2021
2022
Built
Approved 3 months before the announcement.
- Program
- COVID-19 Resilience Stream
- Ultimate recipient
- Town of Hawkesbury
- Construction start
- Feb 22, 2022(actual)
- Construction end
- Mar 15, 2022(actual)
Also in Hawkesbury
- Upgrade of the Hawkesbury Wastewater Treatment Plant$11.9M
- Hawkesbury Water Treatment Plant Clarifier Upgrades$1.1M
- Replacement of 550 meters of water main with new 200mm conduit and replacement of all lateral services$550.0K
- Installation of a 250mm diameter water main on Bon Pasteur Street between McGill Street and Geneviève Street$287.5K
- Upgrading of 350 meters of the Tessier Street ditch located between 1250 Tessier St to 900 Tupper St and replacement of 59 meters of undersized culverts with 89 meters of elliptical concrete culverts.$112.2K
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 59703 in the federal list. How to read these figures.