Firehall/Multi-Use Building
Federal contribution
$566,666
Federal share33%
of $1.7M total eligible cost; the rest comes from other partners.
Schedule
AnnouncedJun 5, 2009
ApprovedAug 17, 2009
2010
Built
Approved 2 months after the announcement.
- Program
- Infrastructure Stimulus Fund
- Ultimate recipient
- Township of Malahide
- Construction start
- Nov 16, 2009(actual)
- Construction end
- Sep 30, 2010(actual)
Also in Malahide
- Talbot St. East (Highway #3) Watermain Replacement$631.5K
- Rehabilitation of Tracey Street Park$80.0K
- Slip-line existing stormwater culverts located along Springerhill Road and Calton Line$37.0K
- Planning and design for the replacement of the existing water main and appurtenances from connection point at Elk Street to end of water main$10.0K
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 30361 in the federal list. How to read these figures.