Talbot St. East (Highway #3) Watermain Replacement
Federal contribution
$631,500
Federal share40%
of $1.6M total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedApr 14, 2022
20232024
Built
Approved 6 weeks before the announcement.
- Program
- Green Infrastructure Stream
- Ultimate recipient
- Township of Malahide
- Construction start
- Sep 11, 2023(actual)
- Construction end
- Aug 29, 2024(actual)
Against the original forecast
- Construction end4 months earlyforecast Dec 31, 2024
Also in Malahide
- Firehall/Multi-Use Building$566.7K
- Rehabilitation of Tracey Street Park$80.0K
- Slip-line existing stormwater culverts located along Springerhill Road and Calton Line$37.0K
- Planning and design for the replacement of the existing water main and appurtenances from connection point at Elk Street to end of water main$10.0K
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 62821 in the federal list. How to read these figures.