Rehabilitation of Tracey Street Park
Federal contribution
$80,000
Federal share80%
of $100.0K total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedJun 29, 2021
Built
Approved 3 months before the announcement.
- Program
- COVID-19 Resilience Stream
- Ultimate recipient
- Township of Malahide
- Construction start
- May 25, 2021(actual)
- Construction end
- Oct 25, 2021(actual)
Against the original forecast
- Construction start3 weeks lateforecast May 3, 2021
Also in Malahide
- Talbot St. East (Highway #3) Watermain Replacement$631.5K
- Firehall/Multi-Use Building$566.7K
- Slip-line existing stormwater culverts located along Springerhill Road and Calton Line$37.0K
- Planning and design for the replacement of the existing water main and appurtenances from connection point at Elk Street to end of water main$10.0K