Retrofit of Washrooms & A/V equipment in PMD Arena
Federal contribution
$80,000
Federal share80%
of $100.0K total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedJun 29, 2021
Built
Approved 3 months before the announcement.
- Program
- COVID-19 Resilience Stream
- Ultimate recipient
- Township of Mapleton
- Construction start
- Aug 23, 2021(actual)
- Construction end
- Dec 16, 2021(actual)
Against the original forecast
- Construction end4 weeks lateforecast Nov 17, 2021
Also in Mapleton
- Drayton Sewage Pumping Station Upgrades$2.1M
- Moorefield Water System Renewal$2.0M
- Replacement of the Glen Allan Bridge$1.1M
- Replacement of Denstedt Bridge$309.0K
- Install six new watermain valves and rehabilitate two watermain valves within the Drayton water distribution system to address system deficiencies and improve operational flexibility$38.5K
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 59557 in the federal list. How to read these figures.