Rehabilitation of Outdoor space
Federal contribution
$80,000
Federal share80%
of $100.0K total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedJun 15, 2021
2022
Built
Approved 3 weeks before the announcement.
- Program
- COVID-19 Resilience Stream
- Ultimate recipient
- Township of Stirling-Rawdon
- Construction start
- Aug 16, 2021(actual)
- Construction end
- Sep 30, 2022(actual)
Against the original forecast
- Construction start2 months lateforecast Jun 1, 2021
- Construction end4 weeks earlyforecast Oct 31, 2022
Also in Stirling-Rawdon
- Ridge Road Rehabilitation$1.2M
- Replacement of the Watermain along North, Mill, Front and Henry Street$528.0K
- Embracing the Future while Remembering our Past: Stirling-Rawdon Theatre and Library Retrofit$240.3K
- Drinking Water Feasibility Study to access the options of providing an alternate source of drinking water at our present facility at 93 Elizabeth Street.$37.5K
- Preliminary Design for Upgrade the Stormwater, Water and Wastewater Infrastructure on Baker Street$12.5K
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 59741 in the federal list. How to read these figures.