Preliminary Design for Upgrade the Stormwater, Water and Wastewater Infrastructure on Baker Street
Federal contribution
$12,500
Federal share50%
of $25.0K total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedMay 23, 2017
20182019
Built
- Program
- Clean Water and Wastewater Fund
- Ultimate recipient
- Township of Stirling-Rawdon
- Construction start
- Nov 15, 2017(actual)
- Construction end
- Dec 31, 2018(actual)
Against the original forecast
- Construction start9 months lateforecast Feb 1, 2017
- Construction end9 months lateforecast Mar 31, 2018
Also in Stirling-Rawdon
- Ridge Road Rehabilitation$1.2M
- Replacement of the Watermain along North, Mill, Front and Henry Street$528.0K
- Embracing the Future while Remembering our Past: Stirling-Rawdon Theatre and Library Retrofit$240.3K
- Rehabilitation of Outdoor space$80.0K
- Drinking Water Feasibility Study to access the options of providing an alternate source of drinking water at our present facility at 93 Elizabeth Street.$37.5K
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 48976 in the federal list. How to read these figures.