Replacement of the Watermain along North, Mill, Front and Henry Street
Federal contribution
$528,000
Federal share40%
of $1.3M total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedApr 14, 2022
20232024
Built
Approved 6 weeks before the announcement.
- Program
- Green Infrastructure Stream
- Ultimate recipient
- Township of Stirling-Rawdon
- Construction start
- Aug 22, 2022(actual)
- Construction end
- Jul 31, 2024(actual)
Against the original forecast
- Construction end4 weeks lateforecast Jun 30, 2024
Also in Stirling-Rawdon
- Ridge Road Rehabilitation$1.2M
- Embracing the Future while Remembering our Past: Stirling-Rawdon Theatre and Library Retrofit$240.3K
- Rehabilitation of Outdoor space$80.0K
- Drinking Water Feasibility Study to access the options of providing an alternate source of drinking water at our present facility at 93 Elizabeth Street.$37.5K
- Preliminary Design for Upgrade the Stormwater, Water and Wastewater Infrastructure on Baker Street$12.5K
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 62952 in the federal list. How to read these figures.