Drinking Water Feasibility Study to access the options of providing an alternate source of drinking water at our present facility at 93 Elizabeth Street.
Federal contribution
$37,500
Federal share44%
of $85.0K total eligible cost; the rest comes from other partners.
Schedule
Announced and approvedMay 23, 2017
2018
Built
- Program
- Clean Water and Wastewater Fund
- Ultimate recipient
- Township of Stirling-Rawdon
- Construction start
- Sep 1, 2017(actual)
- Construction end
- Mar 31, 2018(actual)
Against the original forecast
- Construction start9 months lateforecast Dec 1, 2016
- Construction end3 months lateforecast Dec 31, 2017
Also in Stirling-Rawdon
- Ridge Road Rehabilitation$1.2M
- Replacement of the Watermain along North, Mill, Front and Henry Street$528.0K
- Embracing the Future while Remembering our Past: Stirling-Rawdon Theatre and Library Retrofit$240.3K
- Rehabilitation of Outdoor space$80.0K
- Preliminary Design for Upgrade the Stormwater, Water and Wastewater Infrastructure on Baker Street$12.5K
Amounts are federal dollars committed, not spent to date. Status is inferred from the dates above, not reported by the source. Project 48975 in the federal list. How to read these figures.