70projects·$131.0Mfederal of $312.6M eligible
Lionhead Pumping Station, Decommissioning and Gravity Sewer Connection
$381.5KBrampton · Wastewater
complete·approved 2011
Interior Reservoir Coatings - Meadowvale Cells 1 and 2
$360.0KMississauga · Drinking Water
complete·approved 2010
Resurfacing - Cawthra Road from Lakeshore Road to North Service Road
$302.1KMississauga · Highways and Roads
complete·approved 2011
Resurfacing - Mayfield Road from McLaughlin Road to Mississauga Road
$284.8KCaledon · Highways and Roads
complete·approved 2009
Rehabilitation of the Stormwater Pond at Mayfield Road and Kennedy Road
$272.8KPeel · Wastewater
complete·approved 2018
Replacement of the Heart Lake Conservation Area Water Supply System
$250.0KPeel · Drinking Water
complete·approved 2017
Replacement of Ultraviolet (UV) Disinfection Equipment at Alton Wells 3 and 4
$249.5KPeel · Drinking Water
complete·approved 2017
Dixie Road Repairs
$246.7KBrampton · Highways and Roads
complete·approved 2010
Malton Paramedic Satellite Station
$224.2KMississauga · Healthcare Infrastructure
complete·approved 2009
Reservoir Rehabilitation Project - East Brampton cells 1 and 2
$212.1KBrampton · Drinking Water
complete·approved 2009
Installation of an Emergency Shutoff Valve in the Chlorine Building at the Lakeview Water Treatment Plant
$206.4KPeel · Drinking Water
complete·approved 2017
Rehabilitation of the Stormwater Pond at Mayfield Road and Heart Lake Road
$195.0KPeel · Wastewater
complete·approved 2018
Intermodal Sewage Pumping Station Enhancements
$183.3KBrampton · Wastewater
complete·approved 2009
System Evaluation and Implementation of Green Infrastructure for Stormwater Management
$125.0KPeel · Wastewater
complete·approved 2017
Resurfacing - King Street from Creditview Road to Mississauga Road
$118.7KCaledon · Highways and Roads
complete·approved 2009
Modifying Infrastructure for HVAC Improvements
$116.8KMississauga · Ventilation
complete·approved 2021
Gore Road Rehabilitation
$77.4KCaledon · Highways and Roads
complete·approved 2010
Studies to Improve Water Quality Control for Small Watercourses Draining Directly to Lake Ontario
$62.5KPeel · Wastewater
complete·approved 2017
Transportation Master Plan - Region of Peel
$50.0KPeel · Capacity Building
complete·approved 2022
Study for New Water and Wastewater Servicing for the Belfountain Conservation Area
$43.9KPeel · Drinking Water
complete·approved 2017
| Project | Location | Category | Status | Federal | Total | Approved |
|---|---|---|---|---|---|---|
| Lionhead Pumping Station, Decommissioning and Gravity Sewer Connection Regional Municipality of Peel | Brampton | Wastewater | complete | $381.5K | $1.3M | 2011 |
| Interior Reservoir Coatings - Meadowvale Cells 1 and 2 Regional Municipality of Peel | Mississauga | Drinking Water | complete | $360.0K | $1.1M | 2010 |
| Resurfacing - Cawthra Road from Lakeshore Road to North Service Road Regional Municipality of Peel | Mississauga | Highways and Roads | complete | $302.1K | $997.0K | 2011 |
| Resurfacing - Mayfield Road from McLaughlin Road to Mississauga Road Regional Municipality of Peel | Caledon | Highways and Roads | complete | $284.8K | $868.3K | 2009 |
| Rehabilitation of the Stormwater Pond at Mayfield Road and Kennedy Road Regional Municipality of Peel | Peel | Wastewater | complete | $272.8K | $600.0K | 2018 |
| Replacement of the Heart Lake Conservation Area Water Supply System Regional Municipality of Peel | Peel | Drinking Water | complete | $250.0K | $500.0K | 2017 |
| Replacement of Ultraviolet (UV) Disinfection Equipment at Alton Wells 3 and 4 Regional Municipality of Peel | Peel | Drinking Water | complete | $249.5K | $500.0K | 2017 |
| Dixie Road Repairs Regional Municipality of Peel | Brampton | Highways and Roads | complete | $246.7K | $740.0K | 2010 |
| Malton Paramedic Satellite Station Regional Municipality of Peel | Mississauga | Healthcare Infrastructure | complete | $224.2K | $800.0K | 2009 |
| Reservoir Rehabilitation Project - East Brampton cells 1 and 2 Regional Municipality of Peel | Brampton | Drinking Water | complete | $212.1K | $644.7K | 2009 |
| Installation of an Emergency Shutoff Valve in the Chlorine Building at the Lakeview Water Treatment Plant Regional Municipality of Peel | Peel | Drinking Water | complete | $206.4K | $500.0K | 2017 |
| Rehabilitation of the Stormwater Pond at Mayfield Road and Heart Lake Road Regional Municipality of Peel | Peel | Wastewater | complete | $195.0K | $400.0K | 2018 |
| Intermodal Sewage Pumping Station Enhancements Regional Municipality of Peel | Brampton | Wastewater | complete | $183.3K | $550.0K | 2009 |
| System Evaluation and Implementation of Green Infrastructure for Stormwater Management Regional Municipality of Peel | Peel | Wastewater | complete | $125.0K | $250.0K | 2017 |
| Resurfacing - King Street from Creditview Road to Mississauga Road Regional Municipality of Peel | Caledon | Highways and Roads | complete | $118.7K | $379.3K | 2009 |
| Modifying Infrastructure for HVAC Improvements The Regional Municipality of Peel - Sheridan Villa | Mississauga | Ventilation | complete | $116.8K | $146.0K | 2021 |
| Gore Road Rehabilitation Regional Municipality of Peel | Caledon | Highways and Roads | complete | $77.4K | $250.0K | 2010 |
| Studies to Improve Water Quality Control for Small Watercourses Draining Directly to Lake Ontario Regional Municipality of Peel | Peel | Wastewater | complete | $62.5K | $125.0K | 2017 |
| Transportation Master Plan - Region of Peel Regional Municipality of Peel | Peel | Capacity Building | complete | $50.0K | $50.0K | 2022 |
| Study for New Water and Wastewater Servicing for the Belfountain Conservation Area Regional Municipality of Peel | Peel | Drinking Water | complete | $43.9K | $125.0K | 2017 |