409projects·$3.2Bfederal of $7.8B eligible
Replacement of ventilation units (4)
$175.4KMontréal · Ventilation
complete·approved 2021
Replacement of the staircase of Concordia University's Annex Z
$160.1KMontréal · Education, Training and Childcare
complete·approved 2022
Renovation of the main entrance
$160.0KMontréal · Education, Training and Childcare
complete·approved 2021
Rehabilitation of Vendôme Platform McGill University Health Centre
$157.6KMontréal · Public Transit
complete·approved 2017
Replacement of the ventilation and air conditioning system (phase 2)
$149.4KMontréal · Ventilation
complete·approved 2021
Conversion of quadruple rooms in the Maisonneuve pavilion (8th floor, wing B)
$148.0KMontréal · Healthcare Infrastructure
complete·approved 2021
Replacement of a chiller at Cégep André-Laurendeau
$144.9KMontréal · Ventilation
complete·approved 2022
Repair and compliance of exterior facades
$132.2KMontréal · Education, Training and Childcare
complete·approved 2021
RTM buses Preferential measures Reserved lane for Highway 132
$131.0KMontréal · Public Transit
complete·approved 2017
2020/2025 Organizational Strategic Plan
$125.8KMontréal · Public Transit
complete·approved 2017
Replacement of two ventilation units
$124.2KMontréal · Ventilation
complete·approved 2021
Standardization of the Signage
$119.3KMontréal · Public Transit
complete·approved 2017
Upgrading of backflow prevention devices, meter, water cut-off system and domestic water inlet valve
$115.5KMontréal · Education, Training and Childcare
complete·approved 2021
Fix infiltration of the wall on the parking lot side
$112.0KMontréal · Education, Training and Childcare
complete·approved 2021
Upgrade of the ventilation system (Gym)
$111.6KMontréal · Ventilation
complete·approved 2021
Upgrading of the anti-backflow device
$109.2KMontréal · Education, Training and Childcare
complete·approved 2021
Fire Alarm Components Update
$106.9KMontréal · Education, Training and Childcare
complete·approved 2021
The FCMQ Signage
$100.5KMontréal · Recreation
complete·approved 2009
Roof replacement (Basins A and B)
$100.4KMontréal · Education, Training and Childcare
complete·approved 2021
Creation of 2 pressurized neonatal rooms in the Maisonneuve pavilion (7th floor, D wing)
$100.0KMontréal · Ventilation
complete·approved 2021
Châteauguay parking and terminus - studies
$88.7KMontréal · Public Transit
complete·approved 2017
Universal accessibility plan
$74.7KMontréal · Public Transit
complete·approved 2017
Construction of a Station in Mirabel (Preliminary Study)
$73.4KMontréal · Public Transit
complete·approved 2017
Renovation of classrooms of Université du Québec à Montréal
$66.7KMontréal · Education, Training and Childcare
complete·approved 2022
Replacement of the roof (Basins K1, K2, L1, L2)
$66.7KMontréal · Education, Training and Childcare
complete·approved 2021
Rehabilitation of the Lavoisier pavilion into administrative support spaces on the ground floor, 1st and 2nd floors.
$64.0KMontréal · Ventilation
complete·approved 2021
Greater Montréal Blue Route - Phase 2
$59.8KLaval · Active Transportation
complete·approved 2009
Renovation work on the south roof
$57.8KMontréal · Education, Training and Childcare
complete·approved 2021
Modernization and upgrading - Air conditioning of living spaces - Verdun Hospital
$53.2KMontréal · Ventilation
complete·approved 2021
Active mobility study of the Borough of Montreal-Nord
$50.0KMontréal · Capacity Building
approved·approved 2022
Active mobility planning as part of a sustainable mobility plan for the Verdun Borough
$50.0KMontréal · Capacity Building
approved·approved 2022
On Your Feet Challenge - secondary school, pilot projet in Quebec City, QC
$50.0KMontréal · Capacity Building
complete·approved 2022
Walking to school safely in the MercierHochelaga-Maisonneuve borough
$50.0KMontréal · Capacity Building
complete·approved 2022
Mobility study - Bicycle infrastructure on rue de Terrebonne between avenue Belmore and avenue Girouard in the Borough of Côte-des-Neiges-Notre-Dame-de-Grâce
$50.0KMontréal · Capacity Building
complete·approved 2022
Counteracting the sedentary lifestyle of the 50+ age group through active transportation in municipalities in Quebec
$50.0KMontréal · Capacity Building
complete·approved 2022
Testing various methods for measuring the hydraulic performance of mains
$50.0KMontréal · Capacity Building
complete·approved 2008
Development of a condition rating system for sewer manholes with MACP nomenclature
$50.0KMontréal · Capacity Building
complete·approved 2008
Testing an innovative leak detection approach and comparative analysis with traditional methods
$50.0KMontréal · Capacity Building
complete·approved 2008
Prioritization system and preliminary analysis of type of intervention required for sewer mains
$50.0KMontréal · Capacity Building
complete·approved 2008
Replacing the atrium firestop sealant
$49.5KMontréal · Education, Training and Childcare
complete·approved 2021
Replacement of secondary electrical panels and obsolete wiring
$48.3KMontréal · Education, Training and Childcare
complete·approved 2021
Simulation of measures for adapting to climate change (urban drainage)
$47.9KMontréal · Capacity Building
complete·approved 2007
Report on pavement rehabilitation on the Montreal territory
$47.8KMontréal · Capacity Building
complete·approved 2008
Purchase of a PyroLance System for the Fire Prevention Vehicle
$42.5KMontréal · Public Transit
complete·approved 2017
The FCMQ GPS Resurfacers
$40.0KMontréal · Recreation
complete·approved 2009
Saint-Laurent Marine Trail
$40.0KMontréal · Active Transportation
complete·approved 2009
Integrated equipment upgrade
$38.2KMontréal · Education, Training and Childcare
complete·approved 2021
Provincial Trail Census and Slopes Verification
$34.0KMontréal · Recreation
complete·approved 2009
Preliminary Study of the Trail Development Plan for Highway 30 and 40
$32.0KMontréal · Recreation
complete·approved 2014
Preliminary Study of the Trail Development Plan for Highway 10, 10-55 and 50
$31.0KMontréal · Recreation
complete·approved 2014
| Project | Location | Category | Status | Federal | Total | Approved |
|---|---|---|---|---|---|---|
| Replacement of ventilation units (4) Centre de services scolaire de la Pointe-de-l'Île | Montréal | Ventilation | complete | $175.4K | $219.2K | 2021 |
| Replacement of the staircase of Concordia University's Annex Z Université Concordia | Montréal | Education, Training and Childcare | complete | $160.1K | $900.0K | 2022 |
| Renovation of the main entrance Collège O'Sullivan de Montréal | Montréal | Education, Training and Childcare | complete | $160.0K | $200.0K | 2021 |
| Rehabilitation of Vendôme Platform McGill University Health Centre Réseau de transport métropolitain (RTM) | Montréal | Public Transit | complete | $157.6K | $315.1K | 2017 |
| Replacement of the ventilation and air conditioning system (phase 2) Centre de services scolaire de la Pointe-de-l'Île | Montréal | Ventilation | complete | $149.4K | $186.8K | 2021 |
| Conversion of quadruple rooms in the Maisonneuve pavilion (8th floor, wing B) Centre intégré universitaire de santé et de services sociaux de l'Est-de-l'Île-de-Montréal | Montréal | Healthcare Infrastructure | complete | $148.0K | $185.0K | 2021 |
| Replacement of a chiller at Cégep André-Laurendeau Cégep André-Laurendeau | Montréal | Ventilation | complete | $144.9K | $532.8K | 2022 |
| Repair and compliance of exterior facades Collège LaSalle | Montréal | Education, Training and Childcare | complete | $132.2K | $267.7K | 2021 |
| RTM buses Preferential measures Reserved lane for Highway 132 Agence métropolitaine de transport (AMT) | Montréal | Public Transit | complete | $131.0K | $262.1K | 2017 |
| 2020/2025 Organizational Strategic Plan Société de transport de Montréal (STM) | Montréal | Public Transit | complete | $125.8K | $251.5K | 2017 |
| Replacement of two ventilation units Centre de services scolaire de la Pointe-de-l'Île | Montréal | Ventilation | complete | $124.2K | $155.2K | 2021 |
| Standardization of the Signage Réseau de transport métropolitain (RTM) | Montréal | Public Transit | complete | $119.3K | $238.6K | 2017 |
| Upgrading of backflow prevention devices, meter, water cut-off system and domestic water inlet valve Centre de services scolaire de Montréal (CSSDM) | Montréal | Education, Training and Childcare | complete | $115.5K | $144.4K | 2021 |
| Fix infiltration of the wall on the parking lot side Université du Québec - siège social | Montréal | Education, Training and Childcare | complete | $112.0K | $140.0K | 2021 |
| Upgrade of the ventilation system (Gym) Centre de services scolaire de la Pointe-de-l'Île | Montréal | Ventilation | complete | $111.6K | $139.5K | 2021 |
| Upgrading of the anti-backflow device Centre de services scolaire de Montréal (CSSDM) | Montréal | Education, Training and Childcare | complete | $109.2K | $136.5K | 2021 |
| Fire Alarm Components Update Cégep Marie-Victorin | Montréal | Education, Training and Childcare | complete | $106.9K | $320.0K | 2021 |
| The FCMQ Signage Federation des clubs de motoneigistes du Quebec | Montréal | Recreation | complete | $100.5K | $201.0K | 2009 |
| Roof replacement (Basins A and B) Centre de services scolaire de la Pointe-de-l'Île | Montréal | Education, Training and Childcare | complete | $100.4K | $125.5K | 2021 |
| Creation of 2 pressurized neonatal rooms in the Maisonneuve pavilion (7th floor, D wing) Centre intégré universitaire de santé et de services sociaux de l'Est-de-l'Île-de-Montréal | Montréal | Ventilation | complete | $100.0K | $125.0K | 2021 |
| Châteauguay parking and terminus - studies Agence métropolitaine de transport (AMT) | Montréal | Public Transit | complete | $88.7K | $177.4K | 2017 |
| Universal accessibility plan Société de transport de Montréal (STM) | Montréal | Public Transit | complete | $74.7K | $149.3K | 2017 |
| Construction of a Station in Mirabel (Preliminary Study) Réseau de transport métropolitain (RTM) | Montréal | Public Transit | complete | $73.4K | $146.8K | 2017 |
| Renovation of classrooms of Université du Québec à Montréal Université du Québec à Montréal | Montréal | Education, Training and Childcare | complete | $66.7K | $327.1K | 2022 |
| Replacement of the roof (Basins K1, K2, L1, L2) Centre de services scolaire de la Pointe-de-l'Île | Montréal | Education, Training and Childcare | complete | $66.7K | $125.5K | 2021 |
| Rehabilitation of the Lavoisier pavilion into administrative support spaces on the ground floor, 1st and 2nd floors. Centre intégré universitaire de santé et de services sociaux de l'Est-de-l'Île-de-Montréal | Montréal | Ventilation | complete | $64.0K | $80.0K | 2021 |
| Greater Montréal Blue Route - Phase 2 Éco-Nature | Laval | Active Transportation | complete | $59.8K | $120.0K | 2009 |
| Renovation work on the south roof Université du Québec - siège social | Montréal | Education, Training and Childcare | complete | $57.8K | $78.4K | 2021 |
| Modernization and upgrading - Air conditioning of living spaces - Verdun Hospital Centre intégré universitaire de santé et de services sociaux du Centre-Sud-de-l'Île-de-Montréal | Montréal | Ventilation | complete | $53.2K | $2.0M | 2021 |
| Active mobility study of the Borough of Montreal-Nord City of Montréal | Montréal | Capacity Building | approved | $50.0K | $50.0K | 2022 |
| Active mobility planning as part of a sustainable mobility plan for the Verdun Borough City of Montréal | Montréal | Capacity Building | approved | $50.0K | $80.0K | 2022 |
| On Your Feet Challenge - secondary school, pilot projet in Quebec City, QC Société Canadienne du Cancer | Montréal | Capacity Building | complete | $50.0K | $50.0K | 2022 |
| Walking to school safely in the MercierHochelaga-Maisonneuve borough L'Anonyme | Montréal | Capacity Building | complete | $50.0K | $250.0K | 2022 |
| Mobility study - Bicycle infrastructure on rue de Terrebonne between avenue Belmore and avenue Girouard in the Borough of Côte-des-Neiges-Notre-Dame-de-Grâce City of Montréal | Montréal | Capacity Building | complete | $50.0K | $165.4K | 2022 |
| Counteracting the sedentary lifestyle of the 50+ age group through active transportation in municipalities in Quebec Société Canadienne du Cancer | Montréal | Capacity Building | complete | $50.0K | $154.2K | 2022 |
| Testing various methods for measuring the hydraulic performance of mains City of Montréal | Montréal | Capacity Building | complete | $50.0K | $150.0K | 2008 |
| Development of a condition rating system for sewer manholes with MACP nomenclature City of Montréal | Montréal | Capacity Building | complete | $50.0K | $150.0K | 2008 |
| Testing an innovative leak detection approach and comparative analysis with traditional methods City of Montréal | Montréal | Capacity Building | complete | $50.0K | $150.0K | 2008 |
| Prioritization system and preliminary analysis of type of intervention required for sewer mains City of Montréal | Montréal | Capacity Building | complete | $50.0K | $165.9K | 2008 |
| Replacing the atrium firestop sealant École de technologie supérieure ÉTS | Montréal | Education, Training and Childcare | complete | $49.5K | $167.8K | 2021 |
| Replacement of secondary electrical panels and obsolete wiring Université du Québec - siège social | Montréal | Education, Training and Childcare | complete | $48.3K | $60.4K | 2021 |
| Simulation of measures for adapting to climate change (urban drainage) City of Montréal | Montréal | Capacity Building | complete | $47.9K | $150.0K | 2007 |
| Report on pavement rehabilitation on the Montreal territory City of Montréal | Montréal | Capacity Building | complete | $47.8K | $150.0K | 2008 |
| Purchase of a PyroLance System for the Fire Prevention Vehicle Réseau de transport métropolitain (RTM) | Montréal | Public Transit | complete | $42.5K | $85.0K | 2017 |
| The FCMQ GPS Resurfacers Federation des clubs de motoneigistes du Quebec | Montréal | Recreation | complete | $40.0K | $80.0K | 2009 |
| Saint-Laurent Marine Trail Fédération Québécoise du canot et du kayak | Montréal | Active Transportation | complete | $40.0K | $83.3K | 2009 |
| Integrated equipment upgrade École nationale de cirque | Montréal | Education, Training and Childcare | complete | $38.2K | $74.7K | 2021 |
| Provincial Trail Census and Slopes Verification Fédération Québécoise des Clubs Quads: FQCQ | Montréal | Recreation | complete | $34.0K | $78.6K | 2009 |
| Preliminary Study of the Trail Development Plan for Highway 30 and 40 Fédération Québécoise des Clubs Quads: FQCQ | Montréal | Recreation | complete | $32.0K | $108.0K | 2014 |
| Preliminary Study of the Trail Development Plan for Highway 10, 10-55 and 50 Fédération Québécoise des Clubs Quads: FQCQ | Montréal | Recreation | complete | $31.0K | $73.0K | 2014 |