84projects·$2.1Bfederal of $5.2B eligible
GO Transit Expansion
$1.9BBarrie +12 · Public Transit
underway·approved 2017
Replacement of Old Watermains in the City of Mississauga
$12.3MMississauga · Drinking Water
complete·approved 2009
Implementation of Improvements to the Water Supply System in Mississauga
$9.1MPeel · Drinking Water
complete·approved 2017
Replacement of Old Watermains in the City of Brampton
$7.9MBrampton · Drinking Water
complete·approved 2009
HVAC/Other improvements to Air Quality
$7.9MMississauga · Ventilation
complete·approved 2021
HVAC/Other Improvements to Air Quality
$7.5MMississauga · Ventilation
complete·approved 2021
Replacement of Water Mains in Peel
$7.5MPeel · Drinking Water
complete·approved 2017
Security Access (Video Entry System); Wifi Access points and network infrastructure; Portable replacement; Handwashing stations; FDK (exterior access, outdoor playground)
$7.2MMississauga · Ventilation
complete·approved 2021
East Sanitary Trunk Sewer and EDC Rehabilitation
$6.4MMississauga · Disaster Mitigation
complete·approved 2021
Air Handling Replacement Project Group 1
$6.3MMississauga · Ventilation
complete·approved 2021
Water Bottle Filling Stations; HVAC/Other Improvements to Air Quality; Bandwidth Upgrades; Upgrade Public Address Systems; Wireless System Improvements
$5.6MMississauga · Ventilation
complete·approved 2021
Touch Free Main Entrance Controls;
$5.1MMississauga · Education, Training and Childcare
complete·approved 2021
Electrical Upgrades at the Hanlan and Herridge Pumping Stations
$5.0MPeel · Drinking Water
complete·approved 2017
Construction of a New 750-mm Water Main on Goreway Drive
$5.0MPeel · Drinking Water
complete·approved 2018
Door Hold-Open Magnets for Clear Hall Passage
$4.9MMississauga · Education, Training and Childcare
complete·approved 2021
Equipment Replacement at the G.E. Booth Water Pollution Control Plant
$4.9MPeel · Wastewater
complete·approved 2018
Condition Assessment of the Region's Storm Sewer Infrastructure
$4.0MPeel · Wastewater
complete·approved 2018
Air Handling Replacement; Water Bottle Filling Stations; Exhaust Fan and Boiler Replacement; Security Upgrades
$4.0MMississauga · Ventilation
complete·approved 2021
Long Term Care Facility Retrofits, Repairs and Upgrades
$3.6MBrampton · Ventilation
complete·approved 2021
Design for a New Sanitary Trunk Sewer on Cawthra Road
$3.5MPeel · Wastewater
complete·approved 2018
Replacement of the Existing 400-mm Water Main on Hurontario Street with a 750-mm Water Main
$3.5MPeel · Drinking Water
complete·approved 2018
Peel Heritage Complex Expansion and Revitalization
$3.3MBrampton · Culture
complete·approved 2009
Equipment Replacement at the Water Transmission Facilities
$3.3MPeel · Drinking Water
complete·approved 2018
Capital Improvements to the Pumping Station at the Lorne Park Water Treatment Plant
$3.2MPeel · Drinking Water
complete·approved 2017
Implementation of Hydraulic Improvements at the East Brampton Reservoir
$3.0MPeel · Drinking Water
complete·approved 2017
Police Fleet Garage and Inventory Stores
$3.0MBrampton · Administration, Emergency and Public Works
complete·approved 2009
Rehabilitation or Replacement of Various Sewage Pumping Stations in the Region of Peel
$3.0MPeel · Wastewater
complete·approved 2017
TransHelp Life-Cycle Bus Replacement
$2.9MPeel · Public Transit
underway·approved 2020
Port Credit Trunk Sewer and Forcemain
$2.6MMississauga · Wastewater
complete·approved 2009
Construction of a New 400-mm Water Main on Dundas Street West
$2.4MPeel · Drinking Water
complete·approved 2017
Meadowvale North Pumping Station Expansion
$2.4MMississauga · Drinking Water
complete·approved 2009
Upgrades to the Generator Programmable Logic Controllers (PLC) at Various Lake-Based Water Transmission Facilities
$2.0MPeel · Drinking Water
complete·approved 2017
TransHelp Life-Cycle Bus Replacement Project #2
$1.7MPeel · Public Transit
approved·approved 2023
Brampton Social Services Centre
$1.6MBrampton · Other
complete·approved 2010
Clarkway Drive Trunk Sewer
$1.6MBrampton · Wastewater
complete·approved 2009
McVean Drive Trunk Sewer
$1.5MBrampton · Wastewater
complete·approved 2009
Installation of Additional Flow and Pressure Monitoring for the Lake-Based Water Supply System
$1.5MPeel · Drinking Water
complete·approved 2017
Resurfacing - Dixie Road from Highway 401 to Derry Road
$1.4MMississauga · Highways and Roads
complete·approved 2011
Equipment Replacement at the Lakeview water treatment plant
$1.4MPeel · Drinking Water
complete·approved 2018
Interconnection of Caledon East and Palgrave Water System
$1.4MCaledon · Drinking Water
complete·approved 2009
Water servicing for the communities of Campbells Cross and Victoria in Town of Caledon
$1.4MCaledon · Drinking Water
complete·approved 2009
Resurfacing - on the Forks of the Credit Road from Hurontario Street to West
$1.2MCaledon · Highways and Roads
complete·approved 2009
Resurfacing Highway 9 - West of Peel Road
$1.1MCaledon · Highways and Roads
complete·approved 2010
Silverthorn pumping station improvements and upgrades
$1.1MMississauga · Drinking Water
complete·approved 2009
Resurfacing - Airport Road from Steeles Avenue to Queen Street
$1.0MBrampton · Highways and Roads
complete·approved 2009
Green Infrastructure Retrofit of Peel Regions 7120 Hurontario Street Property
$1.0MMississauga · Other
approved·approved 2024
Rehabilitation of the Storm water Pond at Bovaird Drive West & Gillingham Drive
$990.9KBrampton · Wastewater
complete·approved 2018
Design for the Replacement of the Ash Management Facility at the G.E. Booth Water Pollution Control Plant
$990.3KPeel · Wastewater
complete·approved 2017
Equipment Replacement at the Clarkson Water Pollution Control Plant
$978.3KPeel · Wastewater
complete·approved 2017
Retrofit Common Area Spaces
$960.0KPeel · Affordable And Temporary Housing
complete·approved 2021
| Project | Location | Category | Status | Federal | Total | Approved |
|---|---|---|---|---|---|---|
| GO Transit Expansion Metrolinx | Barrie +12 more | Public Transit | underway | $1.9B | $4.8B | 2017 |
| Replacement of Old Watermains in the City of Mississauga Regional Municipality of Peel | Mississauga | Drinking Water | complete | $12.3M | $36.8M | 2009 |
| Implementation of Improvements to the Water Supply System in Mississauga Regional Municipality of Peel | Peel | Drinking Water | complete | $9.1M | $18.3M | 2017 |
| Replacement of Old Watermains in the City of Brampton Regional Municipality of Peel | Brampton | Drinking Water | complete | $7.9M | $25.1M | 2009 |
| HVAC/Other improvements to Air Quality Peel District School Board | Mississauga | Ventilation | complete | $7.9M | $9.9M | 2021 |
| HVAC/Other Improvements to Air Quality Peel District School Board | Mississauga | Ventilation | complete | $7.5M | $9.4M | 2021 |
| Replacement of Water Mains in Peel Regional Municipality of Peel | Peel | Drinking Water | complete | $7.5M | $15.0M | 2017 |
| Security Access (Video Entry System); Wifi Access points and network infrastructure; Portable replacement; Handwashing stations; FDK (exterior access, outdoor playground) Dufferin-Peel Catholic District School Board | Mississauga | Ventilation | complete | $7.2M | $9.0M | 2021 |
| East Sanitary Trunk Sewer and EDC Rehabilitation Regional Municipality of Peel | Mississauga | Disaster Mitigation | complete | $6.4M | $8.0M | 2021 |
| Air Handling Replacement Project Group 1 Dufferin-Peel Catholic District School Board | Mississauga | Ventilation | complete | $6.3M | $7.9M | 2021 |
| Water Bottle Filling Stations; HVAC/Other Improvements to Air Quality; Bandwidth Upgrades; Upgrade Public Address Systems; Wireless System Improvements Peel District School Board | Mississauga | Ventilation | complete | $5.6M | $7.0M | 2021 |
| Touch Free Main Entrance Controls; Peel District School Board | Mississauga | Education, Training and Childcare | complete | $5.1M | $6.4M | 2021 |
| Electrical Upgrades at the Hanlan and Herridge Pumping Stations Regional Municipality of Peel | Peel | Drinking Water | complete | $5.0M | $10.0M | 2017 |
| Construction of a New 750-mm Water Main on Goreway Drive Regional Municipality of Peel | Peel | Drinking Water | complete | $5.0M | $10.0M | 2018 |
| Door Hold-Open Magnets for Clear Hall Passage Peel District School Board | Mississauga | Education, Training and Childcare | complete | $4.9M | $6.2M | 2021 |
| Equipment Replacement at the G.E. Booth Water Pollution Control Plant Regional Municipality of Peel | Peel | Wastewater | complete | $4.9M | $9.8M | 2018 |
| Condition Assessment of the Region's Storm Sewer Infrastructure Regional Municipality of Peel | Peel | Wastewater | complete | $4.0M | $8.0M | 2018 |
| Air Handling Replacement; Water Bottle Filling Stations; Exhaust Fan and Boiler Replacement; Security Upgrades Dufferin-Peel Catholic District School Board | Mississauga | Ventilation | complete | $4.0M | $4.9M | 2021 |
| Long Term Care Facility Retrofits, Repairs and Upgrades Region of Peel | Brampton | Ventilation | complete | $3.6M | $4.5M | 2021 |
| Design for a New Sanitary Trunk Sewer on Cawthra Road Regional Municipality of Peel | Peel | Wastewater | complete | $3.5M | $7.0M | 2018 |
| Replacement of the Existing 400-mm Water Main on Hurontario Street with a 750-mm Water Main Regional Municipality of Peel | Peel | Drinking Water | complete | $3.5M | $7.0M | 2018 |
| Peel Heritage Complex Expansion and Revitalization Regional Municipality of Peel | Brampton | Culture | complete | $3.3M | $10.0M | 2009 |
| Equipment Replacement at the Water Transmission Facilities Regional Municipality of Peel | Peel | Drinking Water | complete | $3.3M | $6.6M | 2018 |
| Capital Improvements to the Pumping Station at the Lorne Park Water Treatment Plant Regional Municipality of Peel | Peel | Drinking Water | complete | $3.2M | $6.4M | 2017 |
| Implementation of Hydraulic Improvements at the East Brampton Reservoir Regional Municipality of Peel | Peel | Drinking Water | complete | $3.0M | $6.0M | 2017 |
| Police Fleet Garage and Inventory Stores Regional Municipality of Peel | Brampton | Administration, Emergency and Public Works | complete | $3.0M | $9.0M | 2009 |
| Rehabilitation or Replacement of Various Sewage Pumping Stations in the Region of Peel Regional Municipality of Peel | Peel | Wastewater | complete | $3.0M | $6.0M | 2017 |
| TransHelp Life-Cycle Bus Replacement Regional Municipality of Peel | Peel | Public Transit | underway | $2.9M | $7.2M | 2020 |
| Port Credit Trunk Sewer and Forcemain Regional Municipality of Peel | Mississauga | Wastewater | complete | $2.6M | $8.0M | 2009 |
| Construction of a New 400-mm Water Main on Dundas Street West Regional Municipality of Peel | Peel | Drinking Water | complete | $2.4M | $5.0M | 2017 |
| Meadowvale North Pumping Station Expansion Regional Municipality of Peel | Mississauga | Drinking Water | complete | $2.4M | $7.5M | 2009 |
| Upgrades to the Generator Programmable Logic Controllers (PLC) at Various Lake-Based Water Transmission Facilities Regional Municipality of Peel | Peel | Drinking Water | complete | $2.0M | $4.0M | 2017 |
| TransHelp Life-Cycle Bus Replacement Project #2 Regional Municipality of Peel | Peel | Public Transit | approved | $1.7M | $4.2M | 2023 |
| Brampton Social Services Centre Catholic Family Services of Peel-Dufferin | Brampton | Other | complete | $1.6M | $4.4M | 2010 |
| Clarkway Drive Trunk Sewer Regional Municipality of Peel | Brampton | Wastewater | complete | $1.6M | $4.7M | 2009 |
| McVean Drive Trunk Sewer Regional Municipality of Peel | Brampton | Wastewater | complete | $1.5M | $4.5M | 2009 |
| Installation of Additional Flow and Pressure Monitoring for the Lake-Based Water Supply System Regional Municipality of Peel | Peel | Drinking Water | complete | $1.5M | $3.0M | 2017 |
| Resurfacing - Dixie Road from Highway 401 to Derry Road Regional Municipality of Peel | Mississauga | Highways and Roads | complete | $1.4M | $6.2M | 2011 |
| Equipment Replacement at the Lakeview water treatment plant Regional Municipality of Peel | Peel | Drinking Water | complete | $1.4M | $2.9M | 2018 |
| Interconnection of Caledon East and Palgrave Water System Regional Municipality of Peel | Caledon | Drinking Water | complete | $1.4M | $4.2M | 2009 |
| Water servicing for the communities of Campbells Cross and Victoria in Town of Caledon Regional Municipality of Peel | Caledon | Drinking Water | complete | $1.4M | $5.2M | 2009 |
| Resurfacing - on the Forks of the Credit Road from Hurontario Street to West Regional Municipality of Peel | Caledon | Highways and Roads | complete | $1.2M | $3.9M | 2009 |
| Resurfacing Highway 9 - West of Peel Road Government of Ontario | Caledon | Highways and Roads | complete | $1.1M | $4.0M | 2010 |
| Silverthorn pumping station improvements and upgrades Regional Municipality of Peel | Mississauga | Drinking Water | complete | $1.1M | $3.3M | 2009 |
| Resurfacing - Airport Road from Steeles Avenue to Queen Street Regional Municipality of Peel | Brampton | Highways and Roads | complete | $1.0M | $3.2M | 2009 |
| Green Infrastructure Retrofit of Peel Regions 7120 Hurontario Street Property Regional Municipality of Peel | Mississauga | Other | approved | $1.0M | $2.0M | 2024 |
| Rehabilitation of the Storm water Pond at Bovaird Drive West & Gillingham Drive Regional Municipality of Peel | Brampton | Wastewater | complete | $990.9K | $2.0M | 2018 |
| Design for the Replacement of the Ash Management Facility at the G.E. Booth Water Pollution Control Plant Regional Municipality of Peel | Peel | Wastewater | complete | $990.3K | $2.0M | 2017 |
| Equipment Replacement at the Clarkson Water Pollution Control Plant Regional Municipality of Peel | Peel | Wastewater | complete | $978.3K | $2.0M | 2017 |
| Retrofit Common Area Spaces Regional Municipality of Peel | Peel | Affordable And Temporary Housing | complete | $960.0K | $1.2M | 2021 |