3,370projects·$3.7Bfederal of $9.7B eligible
Lead Water Service Pipe Replacement
$6.3KToronto · Drinking Water
complete·approved 2009
Replacement of corroded soda ash tank system with a new poly tank and stainless feeder at the Nairn Centre Water Treatment Plant
$6.2KNairn and Hyman · Drinking Water
complete·approved 2017
Bulk Water Upgrades
$6.1KMossey River · Drinking Water
complete·approved 2017
Install a backup generator for the water treatment facility
$6.1KThessalon First Nation · Drinking Water
complete·approved 2017
Installation of New 15 Horsepower Primary Well Pump
$6.1KHilton Beach · Drinking Water
complete·approved 2017
Repair programmable logic controller (PLC) at the water treatment plant. Located at the Elk Lake water Treatment plant, 4 First Street which serves 440 residents and 160 service connections.
$6.0KJames · Drinking Water
complete·approved 2017
Water Storage Tank Upgrade
$5.9KWoody Point · Drinking Water
complete·approved 2006
Waterproof existing valve chamber on raw water main
$5.8KGeorgian Bluffs · Drinking Water
complete·approved 2017
Monitoring Equipment Upgrades at Water Distribution/Generator Building
$5.8KGogama · Drinking Water
complete·approved 2017
Lead Water Service Pipe Replacement
$5.7KToronto · Drinking Water
complete·approved 2009
Lead Water Service Pipe Replacement
$5.7KToronto · Drinking Water
complete·approved 2009
Upgrade Water System
$5.4KEmbree · Drinking Water
complete·approved 2009
Equipment Upgrades at Water Treatment Plant
$5.2KAnishinaabeg of Naongashiing≈ · Drinking Water
complete·approved 2017
Lead Water Service Pipe Replacement
$5.2KToronto · Drinking Water
complete·approved 2009
Preliminary Design of a Standalone Water Treatment System for the Administration Office and Community Centre to Meet Guidelines and Remove Health and Safety Risks
$5.2KWahta Mohawks≈ · Drinking Water
complete·approved 2017
Lead Water Service Pipe Replacement
$5.1KToronto · Drinking Water
complete·approved 2009
Rehabilitation of Booster Station at Evan John/ Oneida Roads Intersection
$5.0KOneida Nation of the Thames≈ · Drinking Water
complete·approved 2017
Replacement of Polybutylene Service Connections - Doulton Gate
$5.0KWhitby · Drinking Water
complete·approved 2010
Water System Upgrade
$5.0KYoung · Drinking Water
complete·approved 2018
Water Treatment 1 - Chlorine System Rehabilitation
$5.0KChippewas of the Thames First Nation≈ · Drinking Water
complete·approved 2017
Interconnectivity valve replacement between clear wells
$5.0KOpasatika · Drinking Water
complete·approved 2017
Hamlet of Edgeley Water Meters
$4.8KQu'Appelle · Drinking Water
complete·approved 2010
Hamlet of Aneroid Water Line Replacement
$4.7KPonteix · Drinking Water
complete·approved 2010
Radio Communication System for Raw Water Pumping Station
$4.6KHornepayne · Drinking Water
complete·approved 2017
Recalibration of the Curve Lake Pump House
$4.5KCurve Lake First Nation · Drinking Water
complete·approved 2017
Southwest Middlesex Graham Road Pumping Station/Reservoir Upgrade
$4.4KSouthwest Middlesex · Drinking Water
complete·approved 2017
Water Treatment Plant Upgrade
$4.3KStockholm · Drinking Water
complete·approved 2007
Replacement of 35 year old Pump at Well Building
$4.3KGogama · Drinking Water
complete·approved 2017
Lead Water Service Pipe Replacement
$4.2KToronto · Drinking Water
complete·approved 2009
Purchase and installation of remote chlorine analyzer(s) in the distribution system
$4.2KShawanaga First Nation · Drinking Water
complete·approved 2017
Purchase and Install 2 of the 3 raw water low lift pumps at 50 Agnes Street, Charlton
$4.0KCharlton and Dack · Drinking Water
complete·approved 2017
Low lift pump repair
$3.8KMitaanjigamiing First Nation≈ · Drinking Water
complete·approved 2017
Addition of standby filter cartridge housing for Alpine Water treatment plant
$3.8KTrent Lakes · Drinking Water
complete·approved 2017
Lead Water Service Pipe Replacement
$3.8KToronto · Drinking Water
complete·approved 2009
Fire hydrant replacement
$3.7KMattagami First Nation≈ · Drinking Water
complete·approved 2017
Lead Water Service Pipe Replacement
$3.6KToronto · Drinking Water
complete·approved 2009
Lead Water Service Pipe Replacement
$3.6KToronto · Drinking Water
complete·approved 2009
Lead Water Service Pipe Replacement
$3.6KToronto · Drinking Water
complete·approved 2009
Advanced Meter Reading - Phase 2
$3.5KInuvik · Drinking Water
complete·approved 2009
Installation of a new 4 inch treated water flow meter at 50 Agnes Street, Charlton
$3.5KCharlton and Dack · Drinking Water
complete·approved 2017
Reverse Osmosis System
$3.4KRush Lake · Drinking Water
complete·approved 2006
Replacement of Polybutylene Service Connections - Windsor Valley Gate
$3.3KClarington · Drinking Water
complete·approved 2010
Pumphouse building construction
$3.1KGlenavon · Drinking Water
complete·approved 2008
Lead Water Service Pipe Replacement
$3.1KToronto · Drinking Water
complete·approved 2009
Rehabilitation of hydrants to allow flushing, and to improve drinking water system pressure and reliability
$3.1KOjibways of Onigaming First Nation≈ · Drinking Water
underway·approved 2017
Improve water quality at the dead end on McIntyre Street by installing flushing capacity
$3.0KNairn and Hyman · Drinking Water
complete·approved 2017
Upgrade of Pelee Island West Shore Water Treatment Plant and East Shore Water Distribution Plant Generators
$2.8KPelee · Drinking Water
complete·approved 2018
Improve operations with an asset management program
$2.6KWhitefish River First Nation≈ · Drinking Water
complete·approved 2017
Installation of Two (2) sample hydrants and One (1) Flushing hydrant at Buckhorn Lake Estates
$2.6KTrent Lakes · Drinking Water
complete·approved 2017
Water Treatment 2- Chlorine Injection repair
$2.5KChippewas of the Thames First Nation≈ · Drinking Water
complete·approved 2017
| Project | Location | Category | Status | Federal | Total | Approved |
|---|---|---|---|---|---|---|
| Lead Water Service Pipe Replacement City of Toronto | Toronto | Drinking Water | complete | $6.3K | $30.0K | 2009 |
| Replacement of corroded soda ash tank system with a new poly tank and stainless feeder at the Nairn Centre Water Treatment Plant Township of Nairn and Hyman | Nairn and Hyman | Drinking Water | complete | $6.2K | $12.4K | 2017 |
| Bulk Water Upgrades Rural Municipality of Mossey River | Mossey River | Drinking Water | complete | $6.1K | $15.0K | 2017 |
| Install a backup generator for the water treatment facility Thessalon First Nation | Thessalon First Nation | Drinking Water | complete | $6.1K | $12.3K | 2017 |
| Installation of New 15 Horsepower Primary Well Pump Village of Hilton Beach | Hilton Beach | Drinking Water | complete | $6.1K | $12.2K | 2017 |
| Repair programmable logic controller (PLC) at the water treatment plant. Located at the Elk Lake water Treatment plant, 4 First Street which serves 440 residents and 160 service connections. Township of James | James | Drinking Water | complete | $6.0K | $12.2K | 2017 |
| Water Storage Tank Upgrade Town of Woody Point | Woody Point | Drinking Water | complete | $5.9K | $93.1K | 2006 |
| Waterproof existing valve chamber on raw water main Township of Georgian Bluffs | Georgian Bluffs | Drinking Water | complete | $5.8K | $20.0K | 2017 |
| Monitoring Equipment Upgrades at Water Distribution/Generator Building Local Services Board of Gogama | Gogama | Drinking Water | complete | $5.8K | $11.5K | 2017 |
| Lead Water Service Pipe Replacement City of Toronto | Toronto | Drinking Water | complete | $5.7K | $27.5K | 2009 |
| Lead Water Service Pipe Replacement City of Toronto | Toronto | Drinking Water | complete | $5.7K | $27.5K | 2009 |
| Upgrade Water System Town of Embree | Embree | Drinking Water | complete | $5.4K | $130.4K | 2009 |
| Equipment Upgrades at Water Treatment Plant Anishinaabeg of Naongashiing | Anishinaabeg of Naongashiing≈ | Drinking Water | complete | $5.2K | $79.0K | 2017 |
| Lead Water Service Pipe Replacement City of Toronto | Toronto | Drinking Water | complete | $5.2K | $25.0K | 2009 |
| Preliminary Design of a Standalone Water Treatment System for the Administration Office and Community Centre to Meet Guidelines and Remove Health and Safety Risks Wahta Mohawks | Wahta Mohawks≈ | Drinking Water | complete | $5.2K | $10.3K | 2017 |
| Lead Water Service Pipe Replacement City of Toronto | Toronto | Drinking Water | complete | $5.1K | $24.5K | 2009 |
| Rehabilitation of Booster Station at Evan John/ Oneida Roads Intersection Oneida Nation of the Thames | Oneida Nation of the Thames≈ | Drinking Water | complete | $5.0K | $10.1K | 2017 |
| Replacement of Polybutylene Service Connections - Doulton Gate Regional Municipality of Durham | Whitby | Drinking Water | complete | $5.0K | $40.0K | 2010 |
| Water System Upgrade Village of Young | Young | Drinking Water | complete | $5.0K | $15.0K | 2018 |
| Water Treatment 1 - Chlorine System Rehabilitation Chippewas of the Thames First Nation | Chippewas of the Thames First Nation≈ | Drinking Water | complete | $5.0K | $10.0K | 2017 |
| Interconnectivity valve replacement between clear wells Township of Opasatika | Opasatika | Drinking Water | complete | $5.0K | $10.0K | 2017 |
| Hamlet of Edgeley Water Meters Rural Municipality of South Qu'Appelle | Qu'Appelle | Drinking Water | complete | $4.8K | $14.3K | 2010 |
| Hamlet of Aneroid Water Line Replacement Rural Municipality of Auvergne | Ponteix | Drinking Water | complete | $4.7K | $14.0K | 2010 |
| Radio Communication System for Raw Water Pumping Station Township of Hornepayne | Hornepayne | Drinking Water | complete | $4.6K | $10.0K | 2017 |
| Recalibration of the Curve Lake Pump House Curve Lake First Nation | Curve Lake First Nation | Drinking Water | complete | $4.5K | $18.0K | 2017 |
| Southwest Middlesex Graham Road Pumping Station/Reservoir Upgrade Municipality of Southwest Middlesex | Southwest Middlesex | Drinking Water | complete | $4.4K | $10.4K | 2017 |
| Water Treatment Plant Upgrade Village of Stockholm | Stockholm | Drinking Water | complete | $4.3K | $17.1K | 2007 |
| Replacement of 35 year old Pump at Well Building Local Services Board of Gogama | Gogama | Drinking Water | complete | $4.3K | $8.5K | 2017 |
| Lead Water Service Pipe Replacement City of Toronto | Toronto | Drinking Water | complete | $4.2K | $20.0K | 2009 |
| Purchase and installation of remote chlorine analyzer(s) in the distribution system Shawanaga First Nation | Shawanaga First Nation | Drinking Water | complete | $4.2K | $12.0K | 2017 |
| Purchase and Install 2 of the 3 raw water low lift pumps at 50 Agnes Street, Charlton Municipality of Charlton and Dack | Charlton and Dack | Drinking Water | complete | $4.0K | $8.0K | 2017 |
| Low lift pump repair Mitaanjigamiing First Nation | Mitaanjigamiing First Nation≈ | Drinking Water | complete | $3.8K | $7.5K | 2017 |
| Addition of standby filter cartridge housing for Alpine Water treatment plant Municipality of Trent Lakes | Trent Lakes | Drinking Water | complete | $3.8K | $7.5K | 2017 |
| Lead Water Service Pipe Replacement City of Toronto | Toronto | Drinking Water | complete | $3.8K | $18.0K | 2009 |
| Fire hydrant replacement Mattagami First Nation | Mattagami First Nation≈ | Drinking Water | complete | $3.7K | $8.0K | 2017 |
| Lead Water Service Pipe Replacement City of Toronto | Toronto | Drinking Water | complete | $3.6K | $17.5K | 2009 |
| Lead Water Service Pipe Replacement City of Toronto | Toronto | Drinking Water | complete | $3.6K | $17.5K | 2009 |
| Lead Water Service Pipe Replacement City of Toronto | Toronto | Drinking Water | complete | $3.6K | $17.5K | 2009 |
| Advanced Meter Reading - Phase 2 Town of Inuvik | Inuvik | Drinking Water | complete | $3.5K | $31.5K | 2009 |
| Installation of a new 4 inch treated water flow meter at 50 Agnes Street, Charlton Municipality of Charlton and Dack | Charlton and Dack | Drinking Water | complete | $3.5K | $7.0K | 2017 |
| Reverse Osmosis System Village of Rush Lake | Rush Lake | Drinking Water | complete | $3.4K | $13.4K | 2006 |
| Replacement of Polybutylene Service Connections - Windsor Valley Gate Regional Municipality of Durham | Clarington | Drinking Water | complete | $3.3K | $10.0K | 2010 |
| Pumphouse building construction Village of Glenavon | Glenavon | Drinking Water | complete | $3.1K | $12.6K | 2008 |
| Lead Water Service Pipe Replacement City of Toronto | Toronto | Drinking Water | complete | $3.1K | $15.0K | 2009 |
| Rehabilitation of hydrants to allow flushing, and to improve drinking water system pressure and reliability Ojibways of Onigaming First Nation | Ojibways of Onigaming First Nation≈ | Drinking Water | underway | $3.1K | $6.2K | 2017 |
| Improve water quality at the dead end on McIntyre Street by installing flushing capacity Township of Nairn and Hyman | Nairn and Hyman | Drinking Water | complete | $3.0K | $10.6K | 2017 |
| Upgrade of Pelee Island West Shore Water Treatment Plant and East Shore Water Distribution Plant Generators Township of Pelee | Pelee | Drinking Water | complete | $2.8K | $23.3K | 2018 |
| Improve operations with an asset management program Whitefish River First Nation | Whitefish River First Nation≈ | Drinking Water | complete | $2.6K | $5.4K | 2017 |
| Installation of Two (2) sample hydrants and One (1) Flushing hydrant at Buckhorn Lake Estates Municipality of Trent Lakes | Trent Lakes | Drinking Water | complete | $2.6K | $5.8K | 2017 |
| Water Treatment 2- Chlorine Injection repair Chippewas of the Thames First Nation | Chippewas of the Thames First Nation≈ | Drinking Water | complete | $2.5K | $5.0K | 2017 |