7,621projects·$25.3Bfederal of $68.9B eligible
Durham Region Transit Fleet Replacements - 24 conventional buses
$5.9MDurham · Public Transit
complete·approved 2018
Highway 17 Resurfacing - Algoma-Manitoulin District
$5.7MAlgoma District +2 · Highways and Roads
complete·approved 2013
Construction of the Maritime Discovery Centre of the 1000 Islands (MDC)
$5.7MBrockville · Culture
complete·approved 2009
WIFI Access Points; Window replacement; HVAC Upgrades; Bottle Water Filling Stations; Sink replacements
$5.6MOshawa · Ventilation
complete·approved 2021
Handwashing, Outdoor Learning Features, HVAC Upgrades, New Portables, Water bottle filling stations
$5.6MToronto · Ventilation
complete·approved 2021
Portable Classroom Ventilation Improvements; HVAC Improvements; Window Replacement
$5.6MBurlington · Ventilation
complete·approved 2021
Touchpoint Reduction; HVAC; Portable Unit Ventilator Replacement
$5.6MGuelph · Ventilation
complete·approved 2021
Water Bottle Filling Stations; HVAC/Other Improvements to Air Quality; Bandwidth Upgrades; Upgrade Public Address Systems; Wireless System Improvements
$5.6MMississauga · Ventilation
complete·approved 2021
New Cycling Improvements Along London Streets
$5.6MLondon · Active Transportation
underway·approved 2023
Replacement of existing rolling stock vehicles (16 buses) and purchase of new vehicles (3 buses)
$5.6MWindsor · Public Transit
underway·approved 2020
Redevelopment of the Burnhamthorpe Branch Library
$5.5MMississauga · Culture
complete·approved 2009
MiWay Bus Garages: Modifications for Electric Buses
$5.5MMississauga · Public Transit
approved·approved 2023
Walkley rail intersection track improvements - Transit Connectivity (Rail and Bus)
$5.5MOttawa · Public Transit
complete·approved 2017
Hybrid Learning Classroom Implementation Project - WiFi Access Points
$5.5MToronto · Education, Training and Childcare
complete·approved 2021
Improvements to HVAC, Windows, Bottle Filling Stations, Washrooms, Doors, Child Care Centre, WiFi and Network Infrastructure
$5.4MBurlington · Ventilation
complete·approved 2021
Demolition and New Construction of Durham Region Transit Operations Building
$5.4MDurham · Public Transit
underway·approved 2020
Upgrade of the Water Treatment Plant
$5.4MBrantford · Drinking Water
complete·approved 2008
HVAC (Air Conditioning, Air Handling Unit, Fans) Upgrade
$5.4MToronto · Ventilation
complete·approved 2021
177 Church St. Community Hub
$5.4MBradford West Gwillimbury · Other
complete·approved 2022
Hamilton 403 Resurfacing
$5.4MHamilton · Highways and Roads
complete·approved 2013
Air Handling; Ventilation System and Cooling Centre; Windows
$5.3MKawartha Lakes · Ventilation
complete·approved 2021
Sanitary Servicing to Reduce Phosphorus to Lake Simcoe- Royal Oak, Bay, Cottage Lane
$5.3MBarrie · Wastewater
complete·approved 2018
Upgrading of Water Pollution Control Centre
$5.3MArnprior · Wastewater
complete·approved 2009
Construction of a Multi-Use Recreational Complex
$5.3MPrescott · Recreation
complete·approved 2021
Upgrading of the Amherstburg Pollution Control Plant
$5.3MAmherstburg · Wastewater
complete·approved 2006
West Niagara YMCA
$5.3MGrimsby · Recreation
complete·approved 2009
Upgrading of Parry Sound Wastewater Treatment Plant
$5.3MParry Sound · Wastewater
complete·approved 2005
Frenchmans Creek Sewage Servicing
$5.3MFort Erie · Wastewater
complete·approved 2009
Transit Priority Measures for Express Bus Corridors
$5.3MMississauga · Public Transit
underway·approved 2021
Enhanced Pedestrian-Cycling Connections - East-West Corridor
$5.3MKingston · Active Transportation
underway·approved 2020
Retrofits/Repairs/Upgrade Municipal Infrastructure
$5.3MYork · Ventilation
complete·approved 2021
Upgrade Handwashing Equipment; Window Replacements; Install/replace water bottle filling station
$5.2MToronto · Ventilation
complete·approved 2021
HVAC/Ventilation Project ; Windows Project Group; Daycare Retrofit Group
$5.2MLondon · Ventilation
complete·approved 2021
Replacement of Picton Water Pollution Control Plant
$5.2MPicton · Wastewater
complete·approved 2006
HVAC, Bottle Water Filling Station, Portable, Retrofits, Wifi, Windows
$5.2MBrockville · Ventilation
complete·approved 2021
Replacement of Lakeshore Water Treatment Plant
$5.1MBelle River · Drinking Water
complete·approved 2006
Touch Free Main Entrance Controls;
$5.1MMississauga · Education, Training and Childcare
complete·approved 2021
Classroom Enclosures
$5.1MToronto · Education, Training and Childcare
complete·approved 2021
Implementation of Simcoe Street Rapid Transit Corridor in the City of Oshawa
$5.1MDurham · Public Transit
underway·approved 2020
Highway 17 Rehabilitation - Nipissing District
$5.0MBonfield +1 · Highways and Roads
complete·approved 2013
Mountain Trunk Storm Sewer - Structural rehabilitation and repairs of 400 meters of 4.5 meter by 5.4 meter arch shaped concrete storm sewer to prevent imminent collapse
$5.0MHamilton · Wastewater
complete·approved 2017
Valley East Twin Pad Multipurpose Sports Complex
$5.0MGreater Sudbury · Other
approved·approved 2026
North Dumfries Net Zero Arena
$5.0MNorth Dumfries · Other
approved·approved 2025
Mamaawi Lodge: Expanding Green Spaces for an Inclusive Future
$5.0MNepean · Other
underway·approved 2025
Cobourg Shoreline Protection Repair
$5.0MCobourg · Disaster Mitigation
underway·approved 2024
Electrical Upgrades at the Hanlan and Herridge Pumping Stations
$5.0MPeel · Drinking Water
complete·approved 2017
Downtown Pickering Pedestrian Bridge and Public Transit Hub
$5.0MPickering · Public Transit
complete·approved 2011
Expansion and upgrade of County Road 43 and rehabilitation of bridge across Kemptville Creek
$5.0MNorth Grenville · Highways and Roads
underway·approved 2020
Municipal Buildings Rehabilitation - Cambridge
$5.0MCambridge · Other
complete·approved 2009
Construction of a New 750-mm Water Main on Goreway Drive
$5.0MPeel · Drinking Water
complete·approved 2018
| Project | Location | Category | Status | Federal | Total | Approved |
|---|---|---|---|---|---|---|
| Durham Region Transit Fleet Replacements - 24 conventional buses Regional Municipality of Durham | Durham | Public Transit | complete | $5.9M | $11.8M | 2018 |
| Highway 17 Resurfacing - Algoma-Manitoulin District Province of Ontario | Algoma District +2 more | Highways and Roads | complete | $5.7M | $12.3M | 2013 |
| Construction of the Maritime Discovery Centre of the 1000 Islands (MDC) City of Brockville | Brockville | Culture | complete | $5.7M | $17.1M | 2009 |
| WIFI Access Points; Window replacement; HVAC Upgrades; Bottle Water Filling Stations; Sink replacements Durham Catholic District School Board | Oshawa | Ventilation | complete | $5.6M | $7.1M | 2021 |
| Handwashing, Outdoor Learning Features, HVAC Upgrades, New Portables, Water bottle filling stations Toronto District School Board | Toronto | Ventilation | complete | $5.6M | $7.0M | 2021 |
| Portable Classroom Ventilation Improvements; HVAC Improvements; Window Replacement Halton District School Board | Burlington | Ventilation | complete | $5.6M | $7.0M | 2021 |
| Touchpoint Reduction; HVAC; Portable Unit Ventilator Replacement Upper Grand District School Board | Guelph | Ventilation | complete | $5.6M | $7.0M | 2021 |
| Water Bottle Filling Stations; HVAC/Other Improvements to Air Quality; Bandwidth Upgrades; Upgrade Public Address Systems; Wireless System Improvements Peel District School Board | Mississauga | Ventilation | complete | $5.6M | $7.0M | 2021 |
| New Cycling Improvements Along London Streets Corporation of the City of London | London | Active Transportation | underway | $5.6M | $14.0M | 2023 |
| Replacement of existing rolling stock vehicles (16 buses) and purchase of new vehicles (3 buses) City of Windsor | Windsor | Public Transit | underway | $5.6M | $14.0M | 2020 |
| Redevelopment of the Burnhamthorpe Branch Library City of Mississauga | Mississauga | Culture | complete | $5.5M | $16.6M | 2009 |
| MiWay Bus Garages: Modifications for Electric Buses City of Mississauga | Mississauga | Public Transit | approved | $5.5M | $13.8M | 2023 |
| Walkley rail intersection track improvements - Transit Connectivity (Rail and Bus) City of Ottawa | Ottawa | Public Transit | complete | $5.5M | $11.0M | 2017 |
| Hybrid Learning Classroom Implementation Project - WiFi Access Points Toronto District School Board | Toronto | Education, Training and Childcare | complete | $5.5M | $6.8M | 2021 |
| Improvements to HVAC, Windows, Bottle Filling Stations, Washrooms, Doors, Child Care Centre, WiFi and Network Infrastructure Halton Catholic District School Board | Burlington | Ventilation | complete | $5.4M | $6.8M | 2021 |
| Demolition and New Construction of Durham Region Transit Operations Building Regional Municipality of Durham | Durham | Public Transit | underway | $5.4M | $13.5M | 2020 |
| Upgrade of the Water Treatment Plant City of Brantford | Brantford | Drinking Water | complete | $5.4M | $16.2M | 2008 |
| HVAC (Air Conditioning, Air Handling Unit, Fans) Upgrade The Jewish Home for the Aged - The Jewish Home for the Aged | Toronto | Ventilation | complete | $5.4M | $6.7M | 2021 |
| 177 Church St. Community Hub The Corporation of the Town of Bradford West Gwillimbury | Bradford West Gwillimbury | Other | complete | $5.4M | $10.3M | 2022 |
| Hamilton 403 Resurfacing Province of Ontario | Hamilton | Highways and Roads | complete | $5.4M | $10.8M | 2013 |
| Air Handling; Ventilation System and Cooling Centre; Windows Trillium Lakelands District School Board | Kawartha Lakes | Ventilation | complete | $5.3M | $6.7M | 2021 |
| Sanitary Servicing to Reduce Phosphorus to Lake Simcoe- Royal Oak, Bay, Cottage Lane City of Barrie | Barrie | Wastewater | complete | $5.3M | $10.9M | 2018 |
| Upgrading of Water Pollution Control Centre Town of Arnprior | Arnprior | Wastewater | complete | $5.3M | $16.0M | 2009 |
| Construction of a Multi-Use Recreational Complex Town of Prescott | Prescott | Recreation | complete | $5.3M | $13.3M | 2021 |
| Upgrading of the Amherstburg Pollution Control Plant Town of Amherstburg | Amherstburg | Wastewater | complete | $5.3M | $15.9M | 2006 |
| West Niagara YMCA YMCA of Niagara | Grimsby | Recreation | complete | $5.3M | $18.0M | 2009 |
| Upgrading of Parry Sound Wastewater Treatment Plant Town of Parry Sound | Parry Sound | Wastewater | complete | $5.3M | $15.9M | 2005 |
| Frenchmans Creek Sewage Servicing Regional Municipality of Niagara | Fort Erie | Wastewater | complete | $5.3M | $20.0M | 2009 |
| Transit Priority Measures for Express Bus Corridors City of Mississauga | Mississauga | Public Transit | underway | $5.3M | $13.2M | 2021 |
| Enhanced Pedestrian-Cycling Connections - East-West Corridor City of Kingston | Kingston | Active Transportation | underway | $5.3M | $13.2M | 2020 |
| Retrofits/Repairs/Upgrade Municipal Infrastructure York Region | York | Ventilation | complete | $5.3M | $6.6M | 2021 |
| Upgrade Handwashing Equipment; Window Replacements; Install/replace water bottle filling station Toronto Catholic District School Board | Toronto | Ventilation | complete | $5.2M | $6.6M | 2021 |
| HVAC/Ventilation Project ; Windows Project Group; Daycare Retrofit Group London District Catholic School Board | London | Ventilation | complete | $5.2M | $6.5M | 2021 |
| Replacement of Picton Water Pollution Control Plant County of Prince Edward | Picton | Wastewater | complete | $5.2M | $15.5M | 2006 |
| HVAC, Bottle Water Filling Station, Portable, Retrofits, Wifi, Windows Upper Canada District School Board | Brockville | Ventilation | complete | $5.2M | $6.4M | 2021 |
| Replacement of Lakeshore Water Treatment Plant Town of Lakeshore | Belle River | Drinking Water | complete | $5.1M | $15.3M | 2006 |
| Touch Free Main Entrance Controls; Peel District School Board | Mississauga | Education, Training and Childcare | complete | $5.1M | $6.4M | 2021 |
| Classroom Enclosures Toronto District School Board | Toronto | Education, Training and Childcare | complete | $5.1M | $6.4M | 2021 |
| Implementation of Simcoe Street Rapid Transit Corridor in the City of Oshawa Regional Municipality of Durham | Durham | Public Transit | underway | $5.1M | $12.6M | 2020 |
| Highway 17 Rehabilitation - Nipissing District Province of Ontario | Bonfield +1 more | Highways and Roads | complete | $5.0M | $10.1M | 2013 |
| Mountain Trunk Storm Sewer - Structural rehabilitation and repairs of 400 meters of 4.5 meter by 5.4 meter arch shaped concrete storm sewer to prevent imminent collapse City of Hamilton | Hamilton | Wastewater | complete | $5.0M | $10.5M | 2017 |
| Valley East Twin Pad Multipurpose Sports Complex City of Greater Sudbury | Greater Sudbury | Other | approved | $5.0M | $61.7M | 2026 |
| North Dumfries Net Zero Arena Township of North Dumfries | North Dumfries | Other | approved | $5.0M | $21.0M | 2025 |
| Mamaawi Lodge: Expanding Green Spaces for an Inclusive Future Aboriginal Experiences Arts and Culture | Nepean | Other | underway | $5.0M | $10.1M | 2025 |
| Cobourg Shoreline Protection Repair Town of Cobourg | Cobourg | Disaster Mitigation | underway | $5.0M | $19.5M | 2024 |
| Electrical Upgrades at the Hanlan and Herridge Pumping Stations Regional Municipality of Peel | Peel | Drinking Water | complete | $5.0M | $10.0M | 2017 |
| Downtown Pickering Pedestrian Bridge and Public Transit Hub City of Pickering | Pickering | Public Transit | complete | $5.0M | $10.0M | 2011 |
| Expansion and upgrade of County Road 43 and rehabilitation of bridge across Kemptville Creek United Counties of Leeds and Grenville | North Grenville | Highways and Roads | underway | $5.0M | $10.0M | 2020 |
| Municipal Buildings Rehabilitation - Cambridge City of Cambridge | Cambridge | Other | complete | $5.0M | $15.0M | 2009 |
| Construction of a New 750-mm Water Main on Goreway Drive Regional Municipality of Peel | Peel | Drinking Water | complete | $5.0M | $10.0M | 2018 |