Feasibility and needs study for a public transit system for The Town of Gravenhurst, Ontario.
$50.0KGravenhurst · Capacity Building
complete·approved 2022
Bruce Countys Clean Energy Public Transit System
$50.0KBruce · Capacity Building
complete·approved 2022
Southwest Community Transit Regional Service Review, Southwestern Ontario
$50.0KMiddlesex · Capacity Building
complete·approved 2022
Transit Master Plan for the Town of Innisfil, Ontario
$50.0KInnisfil · Capacity Building
complete·approved 2022
Lincoln Green Stormwater Management Pond Rehabilitation, Sediment Cleanout, and Oil Grit Separator Installation
$50.0KClarington · Wastewater
complete·approved 2018
Water System Rehabilitation and Modernization
$50.0KOliver Paipoonge · Drinking Water
complete·approved 2018
Construction of : (12) Bus Stop Pads, (10) Bus Stop Bench Installations, (8) Bus Lay-By Installations
$50.0KBracebridge · Public Transit
complete·approved 2017
Rehabilitation of concrete surfaces throughout the maintenance garage
$50.0KWindsor · Public Transit
complete·approved 2017
Installation of 10 new bus shelters
$50.0KNorth Bay · Public Transit
complete·approved 2017
Needs Study of Communal Waste Water Lagoon System Servicing 12,606 People Located at 1953 4th Line, Ohsweken, Ontario
$50.0KSix Nations of the Grand River≈ · Wastewater
complete·approved 2017
New construction of culverts and road rehabilitation to establish a crown on the road for proper drainage
$50.0KConmee · Wastewater
complete·approved 2017
Integrate and upgrade the communication and data management systems at the water and wastewater plants.
$50.0KMerrickville-Wolford · Drinking Water
complete·approved 2017
Rehabilitation of the existing watermain with new polyvinyl chloride materials on King Street West (#40-#94) that serves the Millbrook Community
$50.0KCavan-Monaghan · Drinking Water
complete·approved 2017
Storm Sewer Replacement Component of the Jacob Street East Reconstruction
$50.0KEast Zorra-Tavistock · Wastewater
complete·approved 2017
Campbell Municipal Drain Upgrade along River Road and Jenkins Drive
$50.0KDawson · Wastewater
complete·approved 2017
Reconstruction of Peterborough County Road 45 Stormwater Collection System
$50.0KPeterborough · Wastewater
complete·approved 2017
Removal of built-up sludge at the Madoc Wastewater Lagoon to restore design volume of 1008 m3/day
$50.0KCentre Hastings · Wastewater
complete·approved 2017
County Road 2 Master Drainage Plan
$50.0KNorthumberland · Wastewater
complete·approved 2017
Assessment of Noelville Wastewater/Stormwater Infrastructure Upgrades
$50.0KFrench River · Wastewater
complete·approved 2017
Storm sewer rehabilitation from the end of Phase II, east along John Street and north along Chiblow Lake Road
$50.0KHuron Shores · Wastewater
complete·approved 2017
Rehabiliation of Drinking Water Supply and Treatment System Components including well pump, high lift pumps, fire pump and analytical equipment.
$50.0KSt. Joseph · Drinking Water
complete·approved 2017
East Don River near May Avenue Bank Stabilization and Sanitary Infrastructure Protection Study
$50.0KYork · Wastewater
complete·approved 2017
Sanitary Infrastructure Protection and Stream Rehabilitation of Pomona Creek in Royal Orchard Park North: Design and Rehabilitation
$50.0KYork · Wastewater
complete·approved 2017
Sanitary Infrastructure Protection and Channel Stabilization of Pomona Creek in Royal Orchard Park South: Geomorphic Study
$50.0KYork · Wastewater
complete·approved 2017
Develop and implement backflow prevention / cross connection program
$50.0KNewmarket · Drinking Water
complete·approved 2017
Conduct an Environmental Assessment to Inform Laurier St. Lagoon Upgrading Plans
$50.0KCasselman · Wastewater
complete·approved 2017
Install a chlorine analyzer loop for proven contact time in distribution
$50.0KCobalt · Drinking Water
complete·approved 2017
Lakeshore West Pollution Control Plant Facility Roof Replacement
$50.0KKingsville · Wastewater
complete·approved 2017
Cottam Wastewater Treatment Lagoon Lagoon Main Pumping Station Pump Replacement
$50.0KKingsville · Wastewater
complete·approved 2017
Detailed Design for the Reconstruction of Roy Street Water, Wastewater and Stormwater infrastructure
$50.0KLaurentian Valley · Wastewater
complete·approved 2017
Dufferin Street Drain Rehabilitation Project which services 85 households in the Village of Norwich
$50.0KNorwich · Wastewater
complete·approved 2017
Minden Hills Ultra Violet (UV) WasteWater Treatment System
$50.0KMinden Hills · Wastewater
complete·approved 2017
Tramore Road Culvert Replacement and Ditching
$50.0KNorth Algona Wilberforce · Wastewater
complete·approved 2017
Multiple Stormwater control systems Rehabilitation of structual upgrades/restoration, and replacement of multiple stormwater culverts
$50.0KPapineau-Cameron · Wastewater
complete·approved 2017
Replacement of 600mm Corrugated Steel Pipe (CSP) Storm Sewer Pipe on Van Horne Avenue
$50.0KDryden · Wastewater
complete·approved 2017
Expansion of the existing stormwater sewer system in the Village of Lyn, along County Road 27 from County Road 46 to St. George Street.
$50.0KLeeds and Grenville · Wastewater
complete·approved 2017
Rehabilitation of approximately 330m of Storm Sewer at 2409 County Road 4, Camden East Ontario to the Napanee River
$50.0KLennox and Addington · Wastewater
complete·approved 2017
Plummer Road Drainage and Erosion Improvements; install 750mm x 18m stormwater culvert along 300 metres of Plummer Road
$50.0KPlummer Additional · Wastewater
complete·approved 2017
Major Cleaning and Repainting including Operational Improvements of Mildmay Water Tower to ensure long term functionality
$50.0KSouth Bruce · Drinking Water
complete·approved 2017
New Construction of Dundalk Drinking Water Production Well and Pumphouse D5 250 Hahen Street East
$50.0KSouthgate · Drinking Water
complete·approved 2017
Rehabilitation and Realignment of Stormwater Drains for Paget and Rolling Meadows
$50.0KTillsonburg · Wastewater
complete·approved 2017
Allen Road installation of new 150 mm watermain to complete looping
$50.0KStrathroy-Caradoc · Drinking Water
complete·approved 2017
Blackwater Bridge Replacement with Outflow Stormdrain Culvert
$50.0KMcKellar · Wastewater
complete·approved 2017
Replacement of 350 Water System Meters
$50.0KDawn-Euphemia · Drinking Water
complete·approved 2017
Rehabilitation of Multiple Stormwater Assets within the Township including Ditch Excavation and the Upsizing of Culverts
$50.0KGillies · Wastewater
complete·approved 2017
Replace existing water standpipe with a larger volume standpipe to meet water pressures, fire flows, and foster economic growth
$50.0KChatsworth · Drinking Water
complete·approved 2017
Cured-in-Place Storm Sewer Rehabilitation on County Road 12 (Cockburn St.), Berwick Ontario
$50.0KStormont, Dundas and Glengarry≈ · Wastewater
complete·approved 2017
Installation of an Oil/ Grit Separator to improve stormwater at sewer outfall from Callander Court
$50.0KAjax · Wastewater
complete·approved 2017
Installation of an Oil/ Grit Separator to improve stormwater quality at sewer outfall from Caldicott Court
$50.0KAjax · Wastewater
complete·approved 2017
Hilldale Road and Trendiak Road Culvert Replacement Program
$50.0KThunder Bay · Wastewater