108projects·$2.5Bfederal of $6.1B eligible
GO Transit Expansion
$1.9BBarrie +12 · Public Transit
underway·approved 2017
GO Transit Improvement Program
$249.6MAjax +19 · Public Transit
complete·approved 2009
South West Integrated Fibre Technology (SWIFT) Network
$61.9MBrant County +17 · Broadband And Connectivity
complete·approved 2016
Duffin Creek Water Pollution Control Plant
$46.7MPickering · Wastewater
complete·approved 2009
Construction of Median Bus Rapid Transit Lanes on Highway 2, City of Pickering
$45.8MDurham · Public Transit
underway·approved 2021
LRT Stage 2 - Early works and preliminary engineering
$45.0MOttawa · Public Transit
complete·approved 2017
Yonge North Subway Extension - Planning and Preliminary Engineering
$36.3MYork · Public Transit
complete·approved 2016
Pickering Heritage & Community Centre
$12.5MPickering · Other
underway·approved 2022
Robert O. Picard Environmental Center Thickening and Dewatering Building Heating, Ventilation and Air Conditioning Upgrade
$9.9MOttawa · Wastewater
complete·approved 2018
Security Access (Video Entry System); Wifi Access points and network infrastructure; Portable replacement; Handwashing stations; FDK (exterior access, outdoor playground)
$7.2MMississauga · Ventilation
complete·approved 2021
Air Handling Replacement Project Group 1
$6.3MMississauga · Ventilation
complete·approved 2021
Downtown Pickering Pedestrian Bridge and Public Transit Hub
$5.0MPickering · Public Transit
complete·approved 2011
Boys and Girls Club Facility 1770 Heatherington Rd
$4.0MOttawa · Recreation
complete·approved 2021
Air Handling Replacement; Water Bottle Filling Stations; Exhaust Fan and Boiler Replacement; Security Upgrades
$4.0MMississauga · Ventilation
complete·approved 2021
Building a Net-Zero Indigenous Community Gathering Space in Northern Ontario
$2.7MTemiskaming Shores · Other
underway·approved 2022
Dufferin County Administration and Provincial Offences Court Addition
$2.7MOrangeville · Administration, Emergency and Public Works
complete·approved 2010
Polybutylene Water Service Replacement Program (City of Pickering and Town of Ajax)
$2.5MDurham · Drinking Water
complete·approved 2018
Pickering Uxbridge Broadband Fibre Optic Trunk
$2.3MUxbridge · Broadband And Connectivity
complete·approved 2021
Watermain Replacement and Water System Upgrades in the Town of Erin
$2.0MErin · Drinking Water
approved·approved 2022
Frozen Water Services Lowering Program- Phase 3, 4, 5 Acton, Oakville and Burlington
$1.8MHalton · Drinking Water
complete·approved 2018
Renovation and New Construction of Conservation Area Trail Infrastructure - Trails, Boardwalks and Pedestrian Bridges
$1.8MCaledon +3 · Recreation
underway·approved 2021
Rosebank Road Sanitary Sewerage Pumping Station
$1.8MPickering · Wastewater
complete·approved 2009
Brampton Social Services Centre
$1.6MBrampton · Other
complete·approved 2010
Replace the existing 300mm ductile watermain with Polyvinyl Chloride on Centre Street from Dufferin Street to Bathurst Street
$1.5MVaughan · Drinking Water
complete·approved 2018
Cathodic Protection of Watermains (City of Pickering, Town of Ajax, Town of Whitby and City of Oshawa)
$1.4MDurham · Drinking Water
complete·approved 2017
Erin Community Centre Rehabilitation and Renovation
$1.1MErin · Recreation
complete·approved 2020
Construction of Foundation Drainage Collector (FDC) Pumping Station and Utility Trench dewatering system - in the vicinity of Black Walnut Trail and Cactus Gate (Lisgar)
$1.0MMississauga · Wastewater
complete·approved 2018
Dufferin Street Resurfacing
$700.0KVaughan · Highways and Roads
complete·approved 2009
Frozen Water Services Lowering Program- Phase 2 Georgetown
$679.5KHalton · Drinking Water
complete·approved 2018
Reduce Lake Erie phosphorus loading rehabilitating 8 wetlands as part of the regional stormwater conveyance and management system
$650.0KBlandford-Blenheim +3 · Wastewater
complete·approved 2017
Stoney Point Wastewater Treatment Plant on St. Clair Road Detailed Design Engineering
$590.7KLakeshore · Wastewater
complete·approved 2017
Replacement of the 8th Line Bridge
$550.0KErin · Highways and Roads
underway·approved 2020
Redman House Program Centre Green Retrofit
$516.6KPickering · Culture
complete·approved 2022
Reconstruction of Black's Bridge
$500.0KOrangeville · Highways and Roads
complete·approved 2005
Reconstruction of the Abbot Crescent Stormwater Management Pond in the City of Pickering to improve water quantity, quality and erosion control to Ganatsekiagon Creek
$450.0KPickering · Wastewater
complete·approved 2017
Emergency Animal Shelter - Veterinary Facility
$450.0KSt. Catharines · Other
complete·approved 2009
Detail Design and Critical Utility Relocations for Highway 2 PULSE (Route 900) Curbside BRT Expansion between Glenanna Road and Brock Road in the City of Pickering
$442.6KDurham · Public Transit
complete·approved 2017
Smart Water Metering - City Wide Automated Meter Reading (AMR) and Advanced Meter Infrastructure (AMI) Implementation and Costing Strategy
$429.0KVaughan · Drinking Water
complete·approved 2018
Preliminary Design, Engineering and Construction of Storm Sewer on the Wilmot Employment Lands site, located on the North Side of the Highway 7/8 corridor between Kitchener and Stratford
$425.5KWilmot · Wastewater
underway·approved 2017
Deer Pit Storm Water Facility
$403.3KErin · Wastewater
complete·approved 2009
Regional Road 23 (Katherine Street) from Cox Creek to Line 86
$350.5KWoolwich · Highways and Roads
complete·approved 2009
Reconstruction of Toy Avenue
$350.0KPickering · Highways and Roads
complete·approved 2009
Reconstruction of 15 Sideroad and Two Bridges
$340.4KHillsburgh · Highways and Roads
complete·approved 2005
Reconstruction of Sandy Beach Road Bridge
$333.3KPickering · Highways and Roads
complete·approved 2006
Reconstruction of Sideroad 5 - Erin
$316.7KErin · Highways and Roads
complete·approved 2009
Road Rehabilitation - Regional Road 5
$298.9KPickering · Highways and Roads
complete·approved 2009
Restoration and Upgrades to the Pickering Museum Village
$293.0KPickering · Culture
complete·approved 2009
Hillsburgh Street Rehabilitation
$286.7KHillsburgh · Highways and Roads
complete·approved 2009
Centre Dufferin Recreation Complex Pitched Roof Replacement
$284.6KShelburne · Recreation
complete·approved 2021
Dufferin Street Sanitary Sewer - Replacement of vitrified clay pipe
$275.0KFort Erie · Wastewater
complete·approved 2017