2,320projects·$1.8Bfederal of $3.8B eligible
Wastewater Lift Pump Replacement
$7.9KPoplar Hill First Nation · Wastewater
complete·approved 2017
Repair and replace five curb valves to improve the water distribution system
$7.7KOpasatika · Drinking Water
complete·approved 2018
Rehabilitation of Water Storage Reservoir at the Water Treatment Plant
$7.6KOneida Nation of the Thames≈ · Drinking Water
complete·approved 2017
Dredging of Municipal Lagoon #2 in Powassan
$7.5KPowassan · Wastewater
complete·approved 2017
Equipment Upgrades at Water Treatment Plant
$7.5KMattagami First Nation≈ · Drinking Water
complete·approved 2017
Drilled well/water system at 111 Main Street. Upgrading of water system from lake source water supply to drilled well for human consumption/use
$7.5KKearney · Drinking Water
complete·approved 2017
Upgrade to drilled well water system at 163 Main Street
$7.5KKearney · Drinking Water
complete·approved 2017
Relocation of shut off valve at Water Treatment Plant on Nipissing Street, Sturgeon Falls
$7.5KWest Nipissing · Drinking Water
complete·approved 2017
Equipment Upgrades at the Water Treatment Plant for Chlorine analyzer, Turbidity meter and singer valve.
$7.5KHilton Beach · Drinking Water
complete·approved 2017
Water treatment plant upgrade - Perform engineering study to design and install a contact time return line from contact chamber to analyzer.
$7.5KDubreuilville · Drinking Water
complete·approved 2017
Repairs to low-lift water pumping station building
$7.3KMattice-Val Côté · Drinking Water
complete·approved 2017
Replacing or adding to the Filter Media inside the filter media tanks that provides filtration of particles present in the inflowing water from the treatment cycle after flocculation.
$7.0KSeine River First Nation · Drinking Water
complete·approved 2017
Structural Replacement of a Stormwater Culvert on Dillabough Road
$7.0KAdmaston/Bromley · Wastewater
complete·approved 2017
Equipment Upgrades at Councillors' Houses and Meeting Grounds water treatment plant
$7.0KAnishinaabeg of Naongashiing≈ · Drinking Water
complete·approved 2017
Water System Sampling Stations
$7.0KRiverside-Albert · Drinking Water
complete·approved 2018
Water and Wastewater Master Plan Study
$6.9KPerth East · Drinking Water
complete·approved 2017
Upgrade existing pressure reducing valve chamber
$6.7KGeorgian Bluffs · Drinking Water
complete·approved 2017
Badjeros Stormwater Management Study
$6.6KGrey · Wastewater
complete·approved 2018
Williamsburg Lagoon Sludge Study
$6.6KSouth Dundas · Wastewater
complete·approved 2018
Re-roofing of fifth Street Pumping Station Building
$6.4KHearst · Wastewater
complete·approved 2018
Replacement of roofing on Church Road Pumping Station Building
$6.4KArmstrong · Wastewater
complete·approved 2018
Chlorination/PRV Building Upgrade
$6.3KSouth River · Drinking Water
complete·approved 2016
Repairs and upgrades at Sewage Pumping Station
$6.3KAttawapiskat First Nation · Wastewater
complete·approved 2017
Stormwater Drainage Study
$6.3KAamjiwnaang First Nation≈ · Wastewater
complete·approved 2017
Replacement of two well pumps at the Crysler Well Heads
$6.3KNorth Stormont · Drinking Water
complete·approved 2017
Replacement of corroded soda ash tank system with a new poly tank and stainless feeder at the Nairn Centre Water Treatment Plant
$6.2KNairn and Hyman · Drinking Water
complete·approved 2017
Bulk Water Upgrades
$6.1KMossey River · Drinking Water
complete·approved 2017
Install a backup generator for the water treatment facility
$6.1KThessalon First Nation · Drinking Water
complete·approved 2017
Installation of New 15 Horsepower Primary Well Pump
$6.1KHilton Beach · Drinking Water
complete·approved 2017
Replacement of Cliff Road Culvert
$6.1KRideau Lakes · Wastewater
complete·approved 2018
Addition of Backflow Preventers at Fifth St. Sewage Pumping Station
$6.1KHearst · Wastewater
complete·approved 2018
Margaret Street Culvert Rehabilitation
$6.0KNeebing · Wastewater
complete·approved 2018
Wastewater Feasibility Study for Community Lot Servicing
$6.0KAamjiwnaang First Nation≈ · Wastewater
complete·approved 2017
Repair programmable logic controller (PLC) at the water treatment plant. Located at the Elk Lake water Treatment plant, 4 First Street which serves 440 residents and 160 service connections.
$6.0KJames · Drinking Water
complete·approved 2017
Waterproof existing valve chamber on raw water main
$5.8KGeorgian Bluffs · Drinking Water
complete·approved 2017
Monitoring Equipment Upgrades at Water Distribution/Generator Building
$5.8KGogama · Drinking Water
complete·approved 2017
Major Pre-Cleaning and Closed-Circuit Television (CCTV) Condition Assessment of Wastewater Sewers in Atironto
$5.7KMontague · Wastewater
complete·approved 2017
Leclerc Lift Station Cancellation and Looping Study
$5.6KGrand Falls · Capacity Building
complete·approved 2016
Replacement of road crossing culvert on County Road 4 at the intersection of Golf Road
$5.3KPrescott and Russell · Wastewater
complete·approved 2017
Rehabilitation of sewage pumps #1 and #2 at Pumping Station #2
$5.3KNorth Stormont · Wastewater
complete·approved 2017
Heenan Place Sanitary Sewer Relining - Narin Westerly
$5.2KKenora · Wastewater
complete·approved 2017
Equipment Upgrades at Water Treatment Plant
$5.2KAnishinaabeg of Naongashiing≈ · Drinking Water
complete·approved 2017
Environmental Risk Assessment for Lagoon
$5.2KSaint-Hilaire · Capacity Building
complete·approved 2016
Preliminary Design of a Standalone Water Treatment System for the Administration Office and Community Centre to Meet Guidelines and Remove Health and Safety Risks
$5.2KWahta Mohawks≈ · Drinking Water
complete·approved 2017
Replacement of 9th Concession Road Culvert
$5.1KRideau Lakes · Wastewater
complete·approved 2018
Rehabilitation of Booster Station at Evan John/ Oneida Roads Intersection
$5.0KOneida Nation of the Thames≈ · Drinking Water
complete·approved 2017
Lagoon inlet pipe/valve replacement
$5.0KSeine River First Nation · Wastewater
complete·approved 2017
Design needed for the separation of the drinking water and the sewer line as the water line is crossing the sewer line. (phase 1 of 2)
$5.0KMcGarry · Wastewater
complete·approved 2017
Wastewater Lagoon Cells Clean Up
$5.0KGogama · Wastewater
complete·approved 2017
Water Treatment 1 - Chlorine System Rehabilitation
$5.0KChippewas of the Thames First Nation≈ · Drinking Water
complete·approved 2017
| Project | Location | Category | Status | Federal | Total | Approved |
|---|---|---|---|---|---|---|
| Wastewater Lift Pump Replacement Poplar Hill First Nation | Poplar Hill First Nation | Wastewater | complete | $7.9K | $20.1K | 2017 |
| Repair and replace five curb valves to improve the water distribution system Township of Opasatika | Opasatika | Drinking Water | complete | $7.7K | $16.0K | 2018 |
| Rehabilitation of Water Storage Reservoir at the Water Treatment Plant Oneida Nation of the Thames | Oneida Nation of the Thames≈ | Drinking Water | complete | $7.6K | $35.0K | 2017 |
| Dredging of Municipal Lagoon #2 in Powassan Municipality of Powassan | Powassan | Wastewater | complete | $7.5K | $15.0K | 2017 |
| Equipment Upgrades at Water Treatment Plant Mattagami First Nation | Mattagami First Nation≈ | Drinking Water | complete | $7.5K | $15.0K | 2017 |
| Drilled well/water system at 111 Main Street. Upgrading of water system from lake source water supply to drilled well for human consumption/use Corporation of the Town of Kearney | Kearney | Drinking Water | complete | $7.5K | $15.0K | 2017 |
| Upgrade to drilled well water system at 163 Main Street Corporation of the Town of Kearney | Kearney | Drinking Water | complete | $7.5K | $15.0K | 2017 |
| Relocation of shut off valve at Water Treatment Plant on Nipissing Street, Sturgeon Falls Municipality of West Nipissing | West Nipissing | Drinking Water | complete | $7.5K | $15.0K | 2017 |
| Equipment Upgrades at the Water Treatment Plant for Chlorine analyzer, Turbidity meter and singer valve. Village of Hilton Beach | Hilton Beach | Drinking Water | complete | $7.5K | $15.0K | 2017 |
| Water treatment plant upgrade - Perform engineering study to design and install a contact time return line from contact chamber to analyzer. Township of Dubreuilville | Dubreuilville | Drinking Water | complete | $7.5K | $15.0K | 2017 |
| Repairs to low-lift water pumping station building Municipality of Mattice-Val Côté | Mattice-Val Côté | Drinking Water | complete | $7.3K | $17.0K | 2017 |
| Replacing or adding to the Filter Media inside the filter media tanks that provides filtration of particles present in the inflowing water from the treatment cycle after flocculation. Seine River First Nation | Seine River First Nation | Drinking Water | complete | $7.0K | $14.0K | 2017 |
| Structural Replacement of a Stormwater Culvert on Dillabough Road Township of Admaston/Bromley | Admaston/Bromley | Wastewater | complete | $7.0K | $14.0K | 2017 |
| Equipment Upgrades at Councillors' Houses and Meeting Grounds water treatment plant Anishinaabeg of Naongashiing | Anishinaabeg of Naongashiing≈ | Drinking Water | complete | $7.0K | $32.0K | 2017 |
| Water System Sampling Stations Village of Riverside-Albert | Riverside-Albert | Drinking Water | complete | $7.0K | $22.2K | 2018 |
| Water and Wastewater Master Plan Study Township of East Perth | Perth East | Drinking Water | complete | $6.9K | $60.0K | 2017 |
| Upgrade existing pressure reducing valve chamber Township of Georgian Bluffs | Georgian Bluffs | Drinking Water | complete | $6.7K | $15.0K | 2017 |
| Badjeros Stormwater Management Study County of Grey | Grey | Wastewater | complete | $6.6K | $15.0K | 2018 |
| Williamsburg Lagoon Sludge Study Corporation of the Municipality of South Dundas | South Dundas | Wastewater | complete | $6.6K | $25.0K | 2018 |
| Re-roofing of fifth Street Pumping Station Building Corporation of the Town of Hearst | Hearst | Wastewater | complete | $6.4K | $13.3K | 2018 |
| Replacement of roofing on Church Road Pumping Station Building Township of Armstrong | Armstrong | Wastewater | complete | $6.4K | $12.8K | 2018 |
| Chlorination/PRV Building Upgrade Town of South River | South River | Drinking Water | complete | $6.3K | $42.4K | 2016 |
| Repairs and upgrades at Sewage Pumping Station Attawapiskat First Nation | Attawapiskat First Nation | Wastewater | complete | $6.3K | $12.5K | 2017 |
| Stormwater Drainage Study Aamjiwnaang First Nation | Aamjiwnaang First Nation≈ | Wastewater | complete | $6.3K | $40.0K | 2017 |
| Replacement of two well pumps at the Crysler Well Heads Township of North Stormont | North Stormont | Drinking Water | complete | $6.3K | $12.5K | 2017 |
| Replacement of corroded soda ash tank system with a new poly tank and stainless feeder at the Nairn Centre Water Treatment Plant Township of Nairn and Hyman | Nairn and Hyman | Drinking Water | complete | $6.2K | $12.4K | 2017 |
| Bulk Water Upgrades Rural Municipality of Mossey River | Mossey River | Drinking Water | complete | $6.1K | $15.0K | 2017 |
| Install a backup generator for the water treatment facility Thessalon First Nation | Thessalon First Nation | Drinking Water | complete | $6.1K | $12.3K | 2017 |
| Installation of New 15 Horsepower Primary Well Pump Village of Hilton Beach | Hilton Beach | Drinking Water | complete | $6.1K | $12.2K | 2017 |
| Replacement of Cliff Road Culvert Township of Rideau Lakes | Rideau Lakes | Wastewater | complete | $6.1K | $12.2K | 2018 |
| Addition of Backflow Preventers at Fifth St. Sewage Pumping Station Corporation of the Town of Hearst | Hearst | Wastewater | complete | $6.1K | $12.5K | 2018 |
| Margaret Street Culvert Rehabilitation Municipality of Neebing | Neebing | Wastewater | complete | $6.0K | $12.0K | 2018 |
| Wastewater Feasibility Study for Community Lot Servicing Aamjiwnaang First Nation | Aamjiwnaang First Nation≈ | Wastewater | complete | $6.0K | $40.0K | 2017 |
| Repair programmable logic controller (PLC) at the water treatment plant. Located at the Elk Lake water Treatment plant, 4 First Street which serves 440 residents and 160 service connections. Township of James | James | Drinking Water | complete | $6.0K | $12.2K | 2017 |
| Waterproof existing valve chamber on raw water main Township of Georgian Bluffs | Georgian Bluffs | Drinking Water | complete | $5.8K | $20.0K | 2017 |
| Monitoring Equipment Upgrades at Water Distribution/Generator Building Local Services Board of Gogama | Gogama | Drinking Water | complete | $5.8K | $11.5K | 2017 |
| Major Pre-Cleaning and Closed-Circuit Television (CCTV) Condition Assessment of Wastewater Sewers in Atironto Township of Montague | Montague | Wastewater | complete | $5.7K | $14.0K | 2017 |
| Leclerc Lift Station Cancellation and Looping Study Grand Falls Regional Municipality | Grand Falls | Capacity Building | complete | $5.6K | $36.5K | 2016 |
| Replacement of road crossing culvert on County Road 4 at the intersection of Golf Road United Counties of Prescott and Russell | Prescott and Russell | Wastewater | complete | $5.3K | $10.7K | 2017 |
| Rehabilitation of sewage pumps #1 and #2 at Pumping Station #2 Township of North Stormont | North Stormont | Wastewater | complete | $5.3K | $10.5K | 2017 |
| Heenan Place Sanitary Sewer Relining - Narin Westerly City of Kenora | Kenora | Wastewater | complete | $5.2K | $10.5K | 2017 |
| Equipment Upgrades at Water Treatment Plant Anishinaabeg of Naongashiing | Anishinaabeg of Naongashiing≈ | Drinking Water | complete | $5.2K | $79.0K | 2017 |
| Environmental Risk Assessment for Lagoon Village of Saint-Hilaire | Saint-Hilaire | Capacity Building | complete | $5.2K | $11.4K | 2016 |
| Preliminary Design of a Standalone Water Treatment System for the Administration Office and Community Centre to Meet Guidelines and Remove Health and Safety Risks Wahta Mohawks | Wahta Mohawks≈ | Drinking Water | complete | $5.2K | $10.3K | 2017 |
| Replacement of 9th Concession Road Culvert Township of Rideau Lakes | Rideau Lakes | Wastewater | complete | $5.1K | $10.1K | 2018 |
| Rehabilitation of Booster Station at Evan John/ Oneida Roads Intersection Oneida Nation of the Thames | Oneida Nation of the Thames≈ | Drinking Water | complete | $5.0K | $10.1K | 2017 |
| Lagoon inlet pipe/valve replacement Seine River First Nation | Seine River First Nation | Wastewater | complete | $5.0K | $10.0K | 2017 |
| Design needed for the separation of the drinking water and the sewer line as the water line is crossing the sewer line. (phase 1 of 2) Township of McGarry | McGarry | Wastewater | complete | $5.0K | $10.0K | 2017 |
| Wastewater Lagoon Cells Clean Up Local Services Board of Gogama | Gogama | Wastewater | complete | $5.0K | $10.0K | 2017 |
| Water Treatment 1 - Chlorine System Rehabilitation Chippewas of the Thames First Nation | Chippewas of the Thames First Nation≈ | Drinking Water | complete | $5.0K | $10.0K | 2017 |