2,320projects·$1.8Bfederal of $3.8B eligible
Equipment Upgrades at Sewage Pumping Station
$88Anishinaabeg of Naongashiing≈ · Wastewater
complete·approved 2017
Water Plant Chemical Resistant Exhaust Fan equipment upgrade
$213Fauquier-Strickland · Drinking Water
complete·approved 2017
Repairs and upgrades to Pumphouse.
$250Taykwa Tagamou First Nation≈ · Wastewater
complete·approved 2017
Repair green sand filter at the water treatment plant and replenish the filter media
$583Brunswick House First Nation≈ · Drinking Water
complete·approved 2017
Upgrades at Water Treatment Plant
$843Temagami First Nation · Wastewater
complete·approved 2017
Replacement of sewage pump at pumping station #3
$924North Stormont · Wastewater
complete·approved 2017
Rehabilitation of the Village Wastewater Treatment Plant
$1.0KOneida Nation of the Thames≈ · Wastewater
complete·approved 2017
Purchase new well level probe for main well for the township which serves 440 residents and 160 service connections. Located at the Elk Lake Water Treatment plant, 4 First Street.
$1.2KJames · Drinking Water
complete·approved 2017
Upgrades at sewage lift station
$1.2KTemagami First Nation · Wastewater
complete·approved 2017
Replacement of Chlorination Pump at Alpine water treatment plant
$1.3KTrent Lakes · Drinking Water
complete·approved 2017
Replacement of Chlorination Pump at Buckhorn Lake Estates
$1.3KTrent Lakes · Drinking Water
complete·approved 2017
Proactive Valve Exercising Program for Atironto Water System
$1.4KMontague · Drinking Water
complete·approved 2017
Conduct an Inspection of the Water Tower to Inform Required Rehabilitation/Maintenance
$1.4KChippewas of the Thames First Nation≈ · Drinking Water
complete·approved 2017
Replacement of well pump # 1 Alpine water treatment plant
$1.5KTrent Lakes · Drinking Water
complete·approved 2017
Sewage Lift Station - Safety Landing Rehabilitation
$1.5KChippewas of the Thames First Nation≈ · Wastewater
complete·approved 2017
Chlorine Analyzer Rehabilitation
$1.8KMitaanjigamiing First Nation≈ · Drinking Water
complete·approved 2017
Replacement of Well Pump #1 Buckhorn Lake Estates
$1.8KTrent Lakes · Drinking Water
complete·approved 2017
Replacement of two sewage pumps at Pumping Station #4 for the village of Finch
$1.8KNorth Stormont · Wastewater
complete·approved 2017
Restoration of stormdrain outfall
$1.9KChippewas of Rama First Nation≈ · Wastewater
complete·approved 2017
Replacement of Blow off Valves throughout Distribution System at 50 Agnes Street, Charlton.
$2.0KCharlton and Dack · Drinking Water
complete·approved 2017
Upgrade/replacement of chlorine analyzer for water pumping station at 76 Fairview Lane
$2.1KPowassan · Drinking Water
complete·approved 2017
Stopping compressor oil from entering the air system that runs through the plant to control the solenoids and valves during operation of the water treatment facility
$2.2KSeine River First Nation · Drinking Water
complete·approved 2017
Mapping of Distribution System and Improvements to Water Distribution System
$2.2KMattagami First Nation≈ · Drinking Water
complete·approved 2017
Crystal Springs Water Treatment Plant Energy Efficiency Upgrades for Heating and Insulation
$2.3KOtonabee-South Monaghan · Drinking Water
complete·approved 2017
Keene Water Treatment Plant (WTP) Energy Efficiency Upgrades to Heating, Insulation and Lighting Systems
$2.3KOtonabee-South Monaghan · Drinking Water
complete·approved 2017
Elgeti Water Treatment Plant Energy Efficiency Upgrades for Heating, Insulation and Lighting Systems
$2.3KOtonabee-South Monaghan · Drinking Water
complete·approved 2017
Replacement of Wastewater Treatment Plant Bio-solids Pump, located inside the Wastewater Treatment Plant on Lakeshore Drive
$2.3KMadawaska Valley · Wastewater
complete·approved 2017
Ditch, Swale and Berm Rehabilitation for Lot servicing
$2.4KAamjiwnaang First Nation≈ · Wastewater
complete·approved 2017
Rehabilitation of Water Treatment Plant Including Communication, Electrical, Programmable Logic Controller and SCADA System
$2.5KWabauskang First Nation≈ · Drinking Water
complete·approved 2017
Water Treatment 2- Chlorine Injection repair
$2.5KChippewas of the Thames First Nation≈ · Drinking Water
complete·approved 2017
Wastewater Study about Gravity collection system
$2.5KChippewas of the Thames First Nation≈ · Wastewater
complete·approved 2017
Rehabilitation of the wastewater pipe at 74 Queens Ave
$2.5KPowassan · Wastewater
complete·approved 2017
Wastewater pipe rehabilitation at 327 Edward Street
$2.5KPowassan · Wastewater
complete·approved 2017
Culvert replacement
$2.5KSheguiandah First Nation · Wastewater
complete·approved 2017
Installation of Two (2) sample hydrants and One (1) Flushing hydrant at Buckhorn Lake Estates
$2.6KTrent Lakes · Drinking Water
complete·approved 2017
Improve operations with an asset management program
$2.6KWhitefish River First Nation≈ · Drinking Water
complete·approved 2017
Upgrade of Pelee Island West Shore Water Treatment Plant and East Shore Water Distribution Plant Generators
$2.8KPelee · Drinking Water
complete·approved 2018
Improve water quality at the dead end on McIntyre Street by installing flushing capacity
$3.0KNairn and Hyman · Drinking Water
complete·approved 2017
Replace both sanitary pump seats at the Sewage pumping station
$3.0KMattice-Val Côté · Wastewater
complete·approved 2018
Design and Construct a New Stormwater Outlet (Surge Capacity)
$3.0KMarkstay-Warren · Wastewater
complete·approved 2017
Replacement of Culvert/Catch Basin/Ditching and asphalt on Road R6
$3.1KRideau Lakes · Wastewater
complete·approved 2018
Rehabilitation of hydrants to allow flushing, and to improve drinking water system pressure and reliability
$3.1KOjibways of Onigaming First Nation≈ · Drinking Water
underway·approved 2017
Flow Meter Replacement for Sewage Lift Station #2
$3.2KPowassan · Wastewater
complete·approved 2017
Cochenour Wastewater Lift Station, Highway 125, Pump Rebuilds
$3.3KRed Lake · Wastewater
complete·approved 2017
Installation of a new 4 inch treated water flow meter at 50 Agnes Street, Charlton
$3.5KCharlton and Dack · Drinking Water
complete·approved 2017
Replacement of Hutchings Road Culvert
$3.5KRideau Lakes · Wastewater
complete·approved 2017
Wastewater Pump Station and Lagoon Upgrade
$3.5KBjorkdale · Wastewater
complete·approved 2017
Repairs and upgrades at Sewage Lift Station
$3.6KAttawapiskat First Nation · Wastewater
complete·approved 2017
Fire hydrant replacement
$3.7KMattagami First Nation≈ · Drinking Water
complete·approved 2017
Low lift pump repair
$3.8KMitaanjigamiing First Nation≈ · Drinking Water
complete·approved 2017
| Project | Location | Category | Status | Federal | Total | Approved |
|---|---|---|---|---|---|---|
| Equipment Upgrades at Sewage Pumping Station Anishinaabeg of Naongashiing | Anishinaabeg of Naongashiing≈ | Wastewater | complete | $88 | $3.0K | 2017 |
| Water Plant Chemical Resistant Exhaust Fan equipment upgrade Township of Fauquier-Strickland | Fauquier-Strickland | Drinking Water | complete | $213 | $2.7K | 2017 |
| Repairs and upgrades to Pumphouse. Taykwa Tagamou Nation | Taykwa Tagamou First Nation≈ | Wastewater | complete | $250 | $2.0K | 2017 |
| Repair green sand filter at the water treatment plant and replenish the filter media Brunswick House First Nation | Brunswick House First Nation≈ | Drinking Water | complete | $583 | $32.5K | 2017 |
| Upgrades at Water Treatment Plant Temagami First Nation | Temagami First Nation | Wastewater | complete | $843 | $3.0K | 2017 |
| Replacement of sewage pump at pumping station #3 Township of North Stormont | North Stormont | Wastewater | complete | $924 | $3.0K | 2017 |
| Rehabilitation of the Village Wastewater Treatment Plant Oneida Nation of the Thames | Oneida Nation of the Thames≈ | Wastewater | complete | $1.0K | $55.0K | 2017 |
| Purchase new well level probe for main well for the township which serves 440 residents and 160 service connections. Located at the Elk Lake Water Treatment plant, 4 First Street. Township of James | James | Drinking Water | complete | $1.2K | $4.1K | 2017 |
| Upgrades at sewage lift station Temagami First Nation | Temagami First Nation | Wastewater | complete | $1.2K | $13.5K | 2017 |
| Replacement of Chlorination Pump at Alpine water treatment plant Municipality of Trent Lakes | Trent Lakes | Drinking Water | complete | $1.3K | $2.5K | 2017 |
| Replacement of Chlorination Pump at Buckhorn Lake Estates Municipality of Trent Lakes | Trent Lakes | Drinking Water | complete | $1.3K | $2.5K | 2017 |
| Proactive Valve Exercising Program for Atironto Water System Township of Montague | Montague | Drinking Water | complete | $1.4K | $4.0K | 2017 |
| Conduct an Inspection of the Water Tower to Inform Required Rehabilitation/Maintenance Chippewas of the Thames First Nation | Chippewas of the Thames First Nation≈ | Drinking Water | complete | $1.4K | $5.0K | 2017 |
| Replacement of well pump # 1 Alpine water treatment plant Municipality of Trent Lakes | Trent Lakes | Drinking Water | complete | $1.5K | $3.0K | 2017 |
| Sewage Lift Station - Safety Landing Rehabilitation Chippewas of the Thames First Nation | Chippewas of the Thames First Nation≈ | Wastewater | complete | $1.5K | $3.0K | 2017 |
| Chlorine Analyzer Rehabilitation Mitaanjigamiing First Nation | Mitaanjigamiing First Nation≈ | Drinking Water | complete | $1.8K | $3.5K | 2017 |
| Replacement of Well Pump #1 Buckhorn Lake Estates Municipality of Trent Lakes | Trent Lakes | Drinking Water | complete | $1.8K | $3.6K | 2017 |
| Replacement of two sewage pumps at Pumping Station #4 for the village of Finch Township of North Stormont | North Stormont | Wastewater | complete | $1.8K | $6.0K | 2017 |
| Restoration of stormdrain outfall Chippewas of Rama First Nation | Chippewas of Rama First Nation≈ | Wastewater | complete | $1.9K | $8.0K | 2017 |
| Replacement of Blow off Valves throughout Distribution System at 50 Agnes Street, Charlton. Municipality of Charlton and Dack | Charlton and Dack | Drinking Water | complete | $2.0K | $4.0K | 2017 |
| Upgrade/replacement of chlorine analyzer for water pumping station at 76 Fairview Lane Municipality of Powassan | Powassan | Drinking Water | complete | $2.1K | $6.0K | 2017 |
| Stopping compressor oil from entering the air system that runs through the plant to control the solenoids and valves during operation of the water treatment facility Seine River First Nation | Seine River First Nation | Drinking Water | complete | $2.2K | $4.3K | 2017 |
| Mapping of Distribution System and Improvements to Water Distribution System Mattagami First Nation | Mattagami First Nation≈ | Drinking Water | complete | $2.2K | $10.0K | 2017 |
| Crystal Springs Water Treatment Plant Energy Efficiency Upgrades for Heating and Insulation Township of Otonabee-South Monaghan | Otonabee-South Monaghan | Drinking Water | complete | $2.3K | $10.6K | 2017 |
| Keene Water Treatment Plant (WTP) Energy Efficiency Upgrades to Heating, Insulation and Lighting Systems Township of Otonabee-South Monaghan | Otonabee-South Monaghan | Drinking Water | complete | $2.3K | $14.0K | 2017 |
| Elgeti Water Treatment Plant Energy Efficiency Upgrades for Heating, Insulation and Lighting Systems Township of Otonabee-South Monaghan | Otonabee-South Monaghan | Drinking Water | complete | $2.3K | $10.9K | 2017 |
| Replacement of Wastewater Treatment Plant Bio-solids Pump, located inside the Wastewater Treatment Plant on Lakeshore Drive Township of Madawaska Valley | Madawaska Valley | Wastewater | complete | $2.3K | $44.0K | 2017 |
| Ditch, Swale and Berm Rehabilitation for Lot servicing Aamjiwnaang First Nation | Aamjiwnaang First Nation≈ | Wastewater | complete | $2.4K | $20.8K | 2017 |
| Rehabilitation of Water Treatment Plant Including Communication, Electrical, Programmable Logic Controller and SCADA System Wabauskang First Nation | Wabauskang First Nation≈ | Drinking Water | complete | $2.5K | $111.8K | 2017 |
| Water Treatment 2- Chlorine Injection repair Chippewas of the Thames First Nation | Chippewas of the Thames First Nation≈ | Drinking Water | complete | $2.5K | $5.0K | 2017 |
| Wastewater Study about Gravity collection system Chippewas of the Thames First Nation | Chippewas of the Thames First Nation≈ | Wastewater | complete | $2.5K | $5.0K | 2017 |
| Rehabilitation of the wastewater pipe at 74 Queens Ave Municipality of Powassan | Powassan | Wastewater | complete | $2.5K | $5.0K | 2017 |
| Wastewater pipe rehabilitation at 327 Edward Street Municipality of Powassan | Powassan | Wastewater | complete | $2.5K | $5.0K | 2017 |
| Culvert replacement Sheguiandah | Sheguiandah First Nation | Wastewater | complete | $2.5K | $5.0K | 2017 |
| Installation of Two (2) sample hydrants and One (1) Flushing hydrant at Buckhorn Lake Estates Municipality of Trent Lakes | Trent Lakes | Drinking Water | complete | $2.6K | $5.8K | 2017 |
| Improve operations with an asset management program Whitefish River First Nation | Whitefish River First Nation≈ | Drinking Water | complete | $2.6K | $5.4K | 2017 |
| Upgrade of Pelee Island West Shore Water Treatment Plant and East Shore Water Distribution Plant Generators Township of Pelee | Pelee | Drinking Water | complete | $2.8K | $23.3K | 2018 |
| Improve water quality at the dead end on McIntyre Street by installing flushing capacity Township of Nairn and Hyman | Nairn and Hyman | Drinking Water | complete | $3.0K | $10.6K | 2017 |
| Replace both sanitary pump seats at the Sewage pumping station Municipality of Mattice-Val Côté | Mattice-Val Côté | Wastewater | complete | $3.0K | $6.0K | 2018 |
| Design and Construct a New Stormwater Outlet (Surge Capacity) Municipality of Markstay-Warren | Markstay-Warren | Wastewater | complete | $3.0K | $75.0K | 2017 |
| Replacement of Culvert/Catch Basin/Ditching and asphalt on Road R6 Township of Rideau Lakes | Rideau Lakes | Wastewater | complete | $3.1K | $22.0K | 2018 |
| Rehabilitation of hydrants to allow flushing, and to improve drinking water system pressure and reliability Ojibways of Onigaming First Nation | Ojibways of Onigaming First Nation≈ | Drinking Water | underway | $3.1K | $6.2K | 2017 |
| Flow Meter Replacement for Sewage Lift Station #2 Municipality of Powassan | Powassan | Wastewater | complete | $3.2K | $10.0K | 2017 |
| Cochenour Wastewater Lift Station, Highway 125, Pump Rebuilds Municipality of Red Lake | Red Lake | Wastewater | complete | $3.3K | $6.6K | 2017 |
| Installation of a new 4 inch treated water flow meter at 50 Agnes Street, Charlton Municipality of Charlton and Dack | Charlton and Dack | Drinking Water | complete | $3.5K | $7.0K | 2017 |
| Replacement of Hutchings Road Culvert Township of Rideau Lakes | Rideau Lakes | Wastewater | complete | $3.5K | $39.0K | 2017 |
| Wastewater Pump Station and Lagoon Upgrade Village of Bjorkdale | Bjorkdale | Wastewater | complete | $3.5K | $7.1K | 2017 |
| Repairs and upgrades at Sewage Lift Station Attawapiskat First Nation | Attawapiskat First Nation | Wastewater | complete | $3.6K | $7.3K | 2017 |
| Fire hydrant replacement Mattagami First Nation | Mattagami First Nation≈ | Drinking Water | complete | $3.7K | $8.0K | 2017 |
| Low lift pump repair Mitaanjigamiing First Nation | Mitaanjigamiing First Nation≈ | Drinking Water | complete | $3.8K | $7.5K | 2017 |