2,320projects·$1.8Bfederal of $3.8B eligible
Courtice Water Pollution Control Plant - Resource Recovery Study - Phase 2 (energy and resource recovery)
$102.6KDurham · Wastewater
complete·approved 2017
Potable Water Dispensing Unit
$102.2KGander · Drinking Water
complete·approved 2016
Design: Dingman Creek Subwatershed Stormwater Infrastructure
$102.0KLondon · Wastewater
complete·approved 2017
Construction of tamarac booster station
$101.9KPort Hawkesbury · Drinking Water
complete·approved 2016
Optimization of Stormwater Assets
$101.2KAnmore · Wastewater
complete·approved 2017
Rehabilitation of Sugar Bush Road Stormwater Pond to Restore Design Volumes
$100.9KVaughan · Wastewater
complete·approved 2018
Outfall Upgrades
$100.9KRoddickton-Bide Arm · Wastewater
complete·approved 2016
Replacement of Heating, Ventilation and Air Conditioning (HVAC) and Boiler System - Water Treatment Plant
$100.8KPrescott · Drinking Water
complete·approved 2017
Rivervale and Oasis Sewer Service Pump Replacements
$100.3KKootenay Boundary · Wastewater
complete·approved 2017
Auxilary Power for the Town's Wastewater Treatment
$100.1KStewiacke · Wastewater
complete·approved 2016
Design and Construction of Graham Creek Stormwater Measures
$100.1KOttawa · Wastewater
complete·approved 2017
LED Lighting Upgrades at Approximately 42 Wastewater Pumping Stations Across the City
$100.0KOttawa · Wastewater
complete·approved 2018
West Side Pond Rehabilitation and Sediment Cleanout
$100.0KClarington · Wastewater
complete·approved 2018
Separation of sewers on Lorne/Gladstone/Melrose/Henry/William Avenues
$100.0KLeamington · Wastewater
complete·approved 2018
Oil City/Oil Springs Reservoir Upgrades
$100.0KOil Springs · Drinking Water
complete·approved 2017
Replace 15 Main Valves Within the Water Distribution System
$100.0KHornepayne · Drinking Water
complete·approved 2017
Assessment, Construction and Implementation of a Drinking Water System Dead-End Looping Strategy in the Central Pressure Zone
$100.0KNewmarket · Drinking Water
complete·approved 2017
Replace existing water treatment control system at all three facilities to extend asset life through online asset management
$100.0KMono · Drinking Water
complete·approved 2017
Thornbury Wastewater Treatment Plant Roof and Heating, Ventilation and Air Conditioning (HVAC) Replacement
$100.0KThe Blue Mountains · Wastewater
complete·approved 2017
Replacement of Maple Street Storm Sewer - Replacing 110m of storm sewer between Maple St. & McKay Crt.
$100.0KCollingwood · Wastewater
complete·approved 2017
Village of Sombra Main Pumping Station Rehabilitation
$100.0KSt. Clair · Wastewater
complete·approved 2017
Village of Port Lambton Main Pumping Station Rehabilitation
$100.0KSt. Clair · Wastewater
complete·approved 2017
Sanitary Sewer Trenchless Repairs (Township Wide Backlog)
$100.0KSt. Clair · Wastewater
complete·approved 2017
Brighton Street new storm sewer from Garnet Street to Facer Street
$100.0KSt. Catharines · Wastewater
complete·approved 2017
Structural relining of 300mm watermain at the Flora Street river crossing.
$100.0KCarleton Place · Drinking Water
complete·approved 2017
Water Treatment Plant and Reservoir Upgrade
$100.0KMossbank · Drinking Water
complete·approved 2017
Water Supply System Pipeline Upgrade
$100.0KEnglefeld · Drinking Water
complete·approved 2017
Wastewater Treatment System Rehabilitation
$100.0KSemans · Wastewater
complete·approved 2017
Cowichan Water Supply Structured Decision Model (SDM) Development
$100.0KDuncan · Drinking Water
complete·approved 2017
Sanitary Sewer - LeBreton Street
$100.0KNeguac · Wastewater
complete·approved 2016
Electoral Area B - Dogwood Valley Water System Upgrade
$99.8KFraser Valley · Drinking Water
complete·approved 2016
Nickel Basin Road - McKenzie Creek Culvert Replacement #2505
$99.4KGreater Sudbury · Wastewater
complete·approved 2018
Upgrading the municipal wastewater treatment system
$99.3KClare · Wastewater
complete·approved 2016
Reclamation and Naturalization of Existing Urban Watercourses - Rehabilitation Plan Preparation
$98.6KLondon · Wastewater
complete·approved 2017
Citywide Sanitary Sewer System Inflow and Infiltration Monitoring Program (Flow meters and micro meters)
$98.3KVaughan · Wastewater
complete·approved 2018
Feasibility and detailed design for an elevated drinking water storage tank.
$98.0KSchreiber · Drinking Water
complete·approved 2017
Water Treatment Plant Influent pipe upgrade
$97.5KJean Marie River · Drinking Water
complete·approved 2016
Seguin Street - Culvert Replacement
$97.4KGreater Sudbury · Wastewater
complete·approved 2018
Lighting Fixture Upgrades at Approximately 20 Drinking Water Pumping Stations Across the City
$97.4KOttawa · Drinking Water
complete·approved 2017
Water Treatment Plant Detailed Design
$97.4KGranisle · Drinking Water
complete·approved 2017
Sanitary line replacement
$97.2KAnnapolis Royal · Wastewater
complete·approved 2016
Ultraviolet (UV) Disinfection at Durham Wastewater Treatment Plant
$97.1KWest Grey · Wastewater
complete·approved 2017
Replace and upsize all watermains on Waubeek Street
$97.0KParry Sound · Drinking Water
complete·approved 2017
Replace failed storm sewer on Waubeek Street
$97.0KParry Sound · Wastewater
complete·approved 2017
Complete replacement of failed sanitary sewer on Waubeek St.
$97.0KParry Sound · Wastewater
complete·approved 2017
Complete replacement of leaking and aged sanitary forcemeain on Waubeek St
$97.0KParry Sound · Wastewater
complete·approved 2017
Replace and upsize all watermains on Prospect Street
$97.0KParry Sound · Drinking Water
complete·approved 2017
Replace leaking and aged storm sewer on Prospect Street
$97.0KParry Sound · Wastewater
complete·approved 2017
Complete replacement of leaking and failing sanitary sewer on Prospect Street
$97.0KParry Sound · Wastewater
complete·approved 2017
Complete replacement of leaking and aged sanitary forcemeain on Prospect St
$97.0KParry Sound · Wastewater
complete·approved 2017
| Project | Location | Category | Status | Federal | Total | Approved |
|---|---|---|---|---|---|---|
| Courtice Water Pollution Control Plant - Resource Recovery Study - Phase 2 (energy and resource recovery) Regional Municipality of Durham | Durham | Wastewater | complete | $102.6K | $300.0K | 2017 |
| Potable Water Dispensing Unit Local Service District of Gander Bay South | Gander | Drinking Water | complete | $102.2K | $346.9K | 2016 |
| Design: Dingman Creek Subwatershed Stormwater Infrastructure Corporation of the City of London | London | Wastewater | complete | $102.0K | $204.0K | 2017 |
| Construction of tamarac booster station Town of Port Hawkesbury | Port Hawkesbury | Drinking Water | complete | $101.9K | $203.9K | 2016 |
| Optimization of Stormwater Assets Village of Anmore | Anmore | Wastewater | complete | $101.2K | $202.4K | 2017 |
| Rehabilitation of Sugar Bush Road Stormwater Pond to Restore Design Volumes City of Vaughan | Vaughan | Wastewater | complete | $100.9K | $216.4K | 2018 |
| Outfall Upgrades Town of Roddickton-Bide Arm | Roddickton-Bide Arm | Wastewater | complete | $100.9K | $276.6K | 2016 |
| Replacement of Heating, Ventilation and Air Conditioning (HVAC) and Boiler System - Water Treatment Plant Town of Prescott | Prescott | Drinking Water | complete | $100.8K | $202.0K | 2017 |
| Rivervale and Oasis Sewer Service Pump Replacements Regional District of Kootenay Boundary | Kootenay Boundary | Wastewater | complete | $100.3K | $200.6K | 2017 |
| Auxilary Power for the Town's Wastewater Treatment Town of Stewiacke | Stewiacke | Wastewater | complete | $100.1K | $257.4K | 2016 |
| Design and Construction of Graham Creek Stormwater Measures City of Ottawa | Ottawa | Wastewater | complete | $100.1K | $225.0K | 2017 |
| LED Lighting Upgrades at Approximately 42 Wastewater Pumping Stations Across the City City of Ottawa | Ottawa | Wastewater | complete | $100.0K | $200.0K | 2018 |
| West Side Pond Rehabilitation and Sediment Cleanout Corporation of the Municipality of Clarington | Clarington | Wastewater | complete | $100.0K | $200.0K | 2018 |
| Separation of sewers on Lorne/Gladstone/Melrose/Henry/William Avenues Municipality of Leamington | Leamington | Wastewater | complete | $100.0K | $200.0K | 2018 |
| Oil City/Oil Springs Reservoir Upgrades Township of Enniskillen | Oil Springs | Drinking Water | complete | $100.0K | $200.0K | 2017 |
| Replace 15 Main Valves Within the Water Distribution System Township of Hornepayne | Hornepayne | Drinking Water | complete | $100.0K | $200.0K | 2017 |
| Assessment, Construction and Implementation of a Drinking Water System Dead-End Looping Strategy in the Central Pressure Zone Town of Newmarket | Newmarket | Drinking Water | complete | $100.0K | $200.0K | 2017 |
| Replace existing water treatment control system at all three facilities to extend asset life through online asset management Corporation of the Town of Mono | Mono | Drinking Water | complete | $100.0K | $200.0K | 2017 |
| Thornbury Wastewater Treatment Plant Roof and Heating, Ventilation and Air Conditioning (HVAC) Replacement Town of The Blue Mountains | The Blue Mountains | Wastewater | complete | $100.0K | $200.0K | 2017 |
| Replacement of Maple Street Storm Sewer - Replacing 110m of storm sewer between Maple St. & McKay Crt. Town of Collingwood | Collingwood | Wastewater | complete | $100.0K | $200.0K | 2017 |
| Village of Sombra Main Pumping Station Rehabilitation Township of St. Clair | St. Clair | Wastewater | complete | $100.0K | $200.0K | 2017 |
| Village of Port Lambton Main Pumping Station Rehabilitation Township of St. Clair | St. Clair | Wastewater | complete | $100.0K | $200.0K | 2017 |
| Sanitary Sewer Trenchless Repairs (Township Wide Backlog) Township of St. Clair | St. Clair | Wastewater | complete | $100.0K | $200.0K | 2017 |
| Brighton Street new storm sewer from Garnet Street to Facer Street Corporation of the City of St. Catharines | St. Catharines | Wastewater | complete | $100.0K | $200.0K | 2017 |
| Structural relining of 300mm watermain at the Flora Street river crossing. The Corporation of the Town of Carleton Place. | Carleton Place | Drinking Water | complete | $100.0K | $200.0K | 2017 |
| Water Treatment Plant and Reservoir Upgrade Town of Mossbank | Mossbank | Drinking Water | complete | $100.0K | $200.0K | 2017 |
| Water Supply System Pipeline Upgrade Village of Englefeld | Englefeld | Drinking Water | complete | $100.0K | $200.0K | 2017 |
| Wastewater Treatment System Rehabilitation Village of Semans | Semans | Wastewater | complete | $100.0K | $200.0K | 2017 |
| Cowichan Water Supply Structured Decision Model (SDM) Development Regional District of Cowichan Valley | Duncan | Drinking Water | complete | $100.0K | $200.0K | 2017 |
| Sanitary Sewer - LeBreton Street Village of Neguac | Neguac | Wastewater | complete | $100.0K | $200.0K | 2016 |
| Electoral Area B - Dogwood Valley Water System Upgrade Regional District of Fraser Valley | Fraser Valley | Drinking Water | complete | $99.8K | $199.5K | 2016 |
| Nickel Basin Road - McKenzie Creek Culvert Replacement #2505 City of Greater Sudbury | Greater Sudbury | Wastewater | complete | $99.4K | $198.9K | 2018 |
| Upgrading the municipal wastewater treatment system Municipality of the District of Clare | Clare | Wastewater | complete | $99.3K | $198.6K | 2016 |
| Reclamation and Naturalization of Existing Urban Watercourses - Rehabilitation Plan Preparation Corporation of the City of London | London | Wastewater | complete | $98.6K | $204.0K | 2017 |
| Citywide Sanitary Sewer System Inflow and Infiltration Monitoring Program (Flow meters and micro meters) City of Vaughan | Vaughan | Wastewater | complete | $98.3K | $196.7K | 2018 |
| Feasibility and detailed design for an elevated drinking water storage tank. Township of Schreiber | Schreiber | Drinking Water | complete | $98.0K | $285.0K | 2017 |
| Water Treatment Plant Influent pipe upgrade Jean Marie River First Nation | Jean Marie River | Drinking Water | complete | $97.5K | $130.0K | 2016 |
| Seguin Street - Culvert Replacement City of Greater Sudbury | Greater Sudbury | Wastewater | complete | $97.4K | $198.6K | 2018 |
| Lighting Fixture Upgrades at Approximately 20 Drinking Water Pumping Stations Across the City City of Ottawa | Ottawa | Drinking Water | complete | $97.4K | $270.0K | 2017 |
| Water Treatment Plant Detailed Design Village of Granisle | Granisle | Drinking Water | complete | $97.4K | $194.7K | 2017 |
| Sanitary line replacement Town of Annapolis Royal | Annapolis Royal | Wastewater | complete | $97.2K | $194.4K | 2016 |
| Ultraviolet (UV) Disinfection at Durham Wastewater Treatment Plant Municipality of West Grey | West Grey | Wastewater | complete | $97.1K | $265.6K | 2017 |
| Replace and upsize all watermains on Waubeek Street Town of Parry Sound | Parry Sound | Drinking Water | complete | $97.0K | $1.2M | 2017 |
| Replace failed storm sewer on Waubeek Street Town of Parry Sound | Parry Sound | Wastewater | complete | $97.0K | $1.1M | 2017 |
| Complete replacement of failed sanitary sewer on Waubeek St. Town of Parry Sound | Parry Sound | Wastewater | complete | $97.0K | $1.6M | 2017 |
| Complete replacement of leaking and aged sanitary forcemeain on Waubeek St Town of Parry Sound | Parry Sound | Wastewater | complete | $97.0K | $583.3K | 2017 |
| Replace and upsize all watermains on Prospect Street Town of Parry Sound | Parry Sound | Drinking Water | complete | $97.0K | $557.4K | 2017 |
| Replace leaking and aged storm sewer on Prospect Street Town of Parry Sound | Parry Sound | Wastewater | complete | $97.0K | $722.8K | 2017 |
| Complete replacement of leaking and failing sanitary sewer on Prospect Street Town of Parry Sound | Parry Sound | Wastewater | complete | $97.0K | $746.1K | 2017 |
| Complete replacement of leaking and aged sanitary forcemeain on Prospect St Town of Parry Sound | Parry Sound | Wastewater | complete | $97.0K | $322.4K | 2017 |