2,320projects·$1.8Bfederal of $3.8B eligible
Major Repairs to the Town of Shelburne Elevated Water Storage Tower
$116.1KShelburne · Drinking Water
complete·approved 2018
Water Tower Internal Waterline Replacement
$115.9KHawke's Bay · Drinking Water
complete·approved 2016
Trunk Watermain Cathodic Protection Upgrades - Design and Construction
$115.6KLondon · Drinking Water
complete·approved 2017
Drinking Water Reservoir Rehabilitation
$115.0KAllan · Drinking Water
complete·approved 2017
Glam Road Water Sewer
$114.9KClarke's Beach · Drinking Water
complete·approved 2016
Gondola Point WWPS Overflow Control and System Optimization Study and Improvement
$114.7KQuispamsis · Wastewater
complete·approved 2016
Upgraded Water Treatment Plant Control System
$114.3KLashburn · Drinking Water
complete·approved 2017
Pumphouse Upgrade
$114.0KAnnaheim · Drinking Water
complete·approved 2016
Stormwater Quality Control Improvement Installation Oil/Grit Separators Multiple Locations
$113.9KBurlington · Wastewater
complete·approved 2017
Development and Implementation of a GIS Strategy for Water and Wastewater Linear Assets
$113.8KNewmarket · Wastewater
complete·approved 2017
Sanitary Sewer and Storm Water Model Development and Mapping (West)
$113.4KSaint John · Capacity Building
complete·approved 2016
Update water models - update of the water distribution system hydraulic analysis model
$113.1KVaughan · Drinking Water
complete·approved 2018
Rehabilitation of the Lakefield College School Sewage Pumping Station
$112.8KSelwyn · Wastewater
complete·approved 2017
Asset Condition Assessment and Develop Maintenance Strategy for Water / Wastewater Valves
$112.5KNewmarket · Drinking Water
complete·approved 2017
Piped Water and Sewer Assessment
$112.5KFort McPherson · Drinking Water
complete·approved 2016
Chapel and Pond Sanitary Sewer Replacement
$112.4KSouris · Wastewater
complete·approved 2016
Upgrading of 350 meters of the Tessier Street ditch located between 1250 Tessier St to 900 Tupper St and replacement of 59 meters of undersized culverts with 89 meters of elliptical concrete culverts.
$112.2KHawkesbury · Wastewater
complete·approved 2017
Low impact development study, pilot projects and water quality monitoring for the Fletcher's Creek Sustainable Retrofit Neighbourhood
$111.0KBrampton · Wastewater
complete·approved 2017
Warfield Pressure Reducing Valve Stations Rehabilitation
$111.0KWarfield · Drinking Water
complete·approved 2016
Structural Relining of 450mm Concrete Sewer System on Lorne Street (Queen St to Canadian Pacific (CP) Railway)
$110.8KSmiths Falls · Wastewater
complete·approved 2017
Dock River Lift Station Replacement
$110.4KAlberton · Wastewater
complete·approved 2016
Groundwater Supply Evaluation and Monitoring Well Construction
$110.3KLumby · Drinking Water
complete·approved 2017
Aerospace Sewer Replacement - 2017
$110.3KSlemon Park · Wastewater
complete·approved 2016
A condition assessment of the City's Main Sewage Pumping Station's forcemain
$110.3KBrockville · Wastewater
complete·approved 2017
Remove accumulated sludge from Hearst Wastewater Treatment Lagoons (cell #1)
$109.8KHearst · Wastewater
complete·approved 2018
Design of the Cooksville Creek Stormwater Erosion Control - QEW to Elaine Trail
$109.8KMississauga · Wastewater
complete·approved 2017
Distribution Pumping Upgrades
$109.8KForty Mile No. 8 (County) · Drinking Water
complete·approved 2017
Sediment Removal from Pond 52 to Restore Design Permanent Pool Volume of 560 m3
$109.0KWaterloo · Wastewater
complete·approved 2017
Beaver Valley Water System Davis/Eastview Improvements
$108.2KFruitvale · Drinking Water
complete·approved 2017
Houghton Road Storm Sewer Relining
$107.6KKenora · Wastewater
complete·approved 2018
Barnes Street watermain replacement from Franklin Boulevard to McPhail Crescent
$107.4KSt. Catharines · Drinking Water
complete·approved 2017
Wardsville Wastewater Treatment Plant and System Improvements on Queen Street and Talbot Street
$106.9KSouthwest Middlesex · Wastewater
complete·approved 2017
Replace Forcemain at Bond's Path; rehabilitate two sewer lift stations and replace water service laterals
$106.9KPlacentia · Wastewater
complete·approved 2016
Kennedy Redwood Estates Water Treatment Plant (WTP) Rehabilitation
$106.8KSouth Glengarry · Drinking Water
complete·approved 2017
Chippewas of Kettle and Stony Point Water Treatment Plant and Distribution Capital Plan
$106.5KChippewas of Kettle and Stony Point First Nation≈ · Drinking Water
complete·approved 2017
New Well and Water Supply Pipeline
$106.3KGoodeve · Drinking Water
complete·approved 2017
Electoral Area D - Area D Integrated Water System Upgrade
$106.3KFraser Valley · Drinking Water
complete·approved 2016
Storm Sewer installation along Gustavus Street from Kaake Street to Bruce Street to eliminate failing infiltration galleries and watermain upgrade to meet growth demand
$106.1KSaugeen Shores · Wastewater
complete·approved 2018
Replacement of 150m of Eleanor Street Watermain - From Phipps Street to Laird Street
$106.1KGore Bay · Drinking Water
complete·approved 2017
Wingham and Blyth Wastewater Systems Master Plan
$105.6KNorth Huron · Wastewater
complete·approved 2018
Moyie Watermain Replacement
$105.0KMoyie · Drinking Water
complete·approved 2017
Storm Water Shed Analysis
$104.3KFredericton · Capacity Building
complete·approved 2016
Restoration of existing storm sewer collection system, manhole, catch basins and storm sewer pipe.
$104.2KNipigon · Wastewater
complete·approved 2017
Storm Sewer Network Study-Old Milton Area
$104.1KMilton · Wastewater
complete·approved 2017
Upgrades to the Standpipe Water Storage Tower
$104.0KBonnechere Valley · Drinking Water
complete·approved 2017
Replace Clarifier Domes
$103.9KMarathon · Wastewater
complete·approved 2017
New Development Water and Sewer
$103.8KBlacks Harbour · Drinking Water
complete·approved 2016
Rehabilitation of Milverton Wastewater Collection System
$103.5KPerth East · Wastewater
complete·approved 2017
Sewage Lift Stations Retrofit
$103.4KIndian Bay · Wastewater
complete·approved 2016
Alberta Street Sanitary Pumping Station in Grand Bend - Electrical and Mechanical Upgrades Including Replacement of the Emergency Stand-by Power System
$102.8KLambton Shores · Wastewater
complete·approved 2018
| Project | Location | Category | Status | Federal | Total | Approved |
|---|---|---|---|---|---|---|
| Major Repairs to the Town of Shelburne Elevated Water Storage Tower Town of Shelburne | Shelburne | Drinking Water | complete | $116.1K | $236.9K | 2018 |
| Water Tower Internal Waterline Replacement Town of Hawkes Bay | Hawke's Bay | Drinking Water | complete | $115.9K | $249.6K | 2016 |
| Trunk Watermain Cathodic Protection Upgrades - Design and Construction Corporation of the City of London | London | Drinking Water | complete | $115.6K | $295.0K | 2017 |
| Drinking Water Reservoir Rehabilitation Town of Allan | Allan | Drinking Water | complete | $115.0K | $230.0K | 2017 |
| Glam Road Water Sewer Town of Clarkes Beach | Clarke's Beach | Drinking Water | complete | $114.9K | $231.2K | 2016 |
| Gondola Point WWPS Overflow Control and System Optimization Study and Improvement Town of Quispamsis | Quispamsis | Wastewater | complete | $114.7K | $229.4K | 2016 |
| Upgraded Water Treatment Plant Control System Town of Lashburn | Lashburn | Drinking Water | complete | $114.3K | $228.6K | 2017 |
| Pumphouse Upgrade Village of Annaheim | Annaheim | Drinking Water | complete | $114.0K | $228.0K | 2016 |
| Stormwater Quality Control Improvement Installation Oil/Grit Separators Multiple Locations City of Burlington | Burlington | Wastewater | complete | $113.9K | $340.0K | 2017 |
| Development and Implementation of a GIS Strategy for Water and Wastewater Linear Assets Town of Newmarket | Newmarket | Wastewater | complete | $113.8K | $250.0K | 2017 |
| Sanitary Sewer and Storm Water Model Development and Mapping (West) City of Saint John | Saint John | Capacity Building | complete | $113.4K | $226.7K | 2016 |
| Update water models - update of the water distribution system hydraulic analysis model City of Vaughan | Vaughan | Drinking Water | complete | $113.1K | $226.2K | 2018 |
| Rehabilitation of the Lakefield College School Sewage Pumping Station Township of Selwyn | Selwyn | Wastewater | complete | $112.8K | $265.0K | 2017 |
| Asset Condition Assessment and Develop Maintenance Strategy for Water / Wastewater Valves Town of Newmarket | Newmarket | Drinking Water | complete | $112.5K | $225.0K | 2017 |
| Piped Water and Sewer Assessment Hamlet of Fort McPherson | Fort McPherson | Drinking Water | complete | $112.5K | $150.0K | 2016 |
| Chapel and Pond Sanitary Sewer Replacement Town of Souris | Souris | Wastewater | complete | $112.4K | $224.8K | 2016 |
| Upgrading of 350 meters of the Tessier Street ditch located between 1250 Tessier St to 900 Tupper St and replacement of 59 meters of undersized culverts with 89 meters of elliptical concrete culverts. Town of Hawkesbury | Hawkesbury | Wastewater | complete | $112.2K | $250.0K | 2017 |
| Low impact development study, pilot projects and water quality monitoring for the Fletcher's Creek Sustainable Retrofit Neighbourhood Corporation of the City of Brampton | Brampton | Wastewater | complete | $111.0K | $350.0K | 2017 |
| Warfield Pressure Reducing Valve Stations Rehabilitation Village of Warfield | Warfield | Drinking Water | complete | $111.0K | $222.0K | 2016 |
| Structural Relining of 450mm Concrete Sewer System on Lorne Street (Queen St to Canadian Pacific (CP) Railway) Town of Smiths Falls | Smiths Falls | Wastewater | complete | $110.8K | $221.6K | 2017 |
| Dock River Lift Station Replacement Town of Alberton | Alberton | Wastewater | complete | $110.4K | $220.7K | 2016 |
| Groundwater Supply Evaluation and Monitoring Well Construction Village of Lumby | Lumby | Drinking Water | complete | $110.3K | $220.7K | 2017 |
| Aerospace Sewer Replacement - 2017 Slemon Park | Slemon Park | Wastewater | complete | $110.3K | $220.7K | 2016 |
| A condition assessment of the City's Main Sewage Pumping Station's forcemain City of Brockville | Brockville | Wastewater | complete | $110.3K | $350.0K | 2017 |
| Remove accumulated sludge from Hearst Wastewater Treatment Lagoons (cell #1) Corporation of the Town of Hearst | Hearst | Wastewater | complete | $109.8K | $219.7K | 2018 |
| Design of the Cooksville Creek Stormwater Erosion Control - QEW to Elaine Trail City of Mississauga | Mississauga | Wastewater | complete | $109.8K | $219.6K | 2017 |
| Distribution Pumping Upgrades County of Forty Mile No. 8 | Forty Mile No. 8 (County) | Drinking Water | complete | $109.8K | $377.0K | 2017 |
| Sediment Removal from Pond 52 to Restore Design Permanent Pool Volume of 560 m3 City of Waterloo | Waterloo | Wastewater | complete | $109.0K | $218.1K | 2017 |
| Beaver Valley Water System Davis/Eastview Improvements Regional District of Kootenay Boundary | Fruitvale | Drinking Water | complete | $108.2K | $216.3K | 2017 |
| Houghton Road Storm Sewer Relining City of Kenora | Kenora | Wastewater | complete | $107.6K | $215.3K | 2018 |
| Barnes Street watermain replacement from Franklin Boulevard to McPhail Crescent Corporation of the City of St. Catharines | St. Catharines | Drinking Water | complete | $107.4K | $214.8K | 2017 |
| Wardsville Wastewater Treatment Plant and System Improvements on Queen Street and Talbot Street Municipality of Southwest Middlesex | Southwest Middlesex | Wastewater | complete | $106.9K | $213.9K | 2017 |
| Replace Forcemain at Bond's Path; rehabilitate two sewer lift stations and replace water service laterals Town of Placentia | Placentia | Wastewater | complete | $106.9K | $213.9K | 2016 |
| Kennedy Redwood Estates Water Treatment Plant (WTP) Rehabilitation Township of South Glengarry | South Glengarry | Drinking Water | complete | $106.8K | $251.5K | 2017 |
| Chippewas of Kettle and Stony Point Water Treatment Plant and Distribution Capital Plan Chippewas of Kettle and Stony Point | Chippewas of Kettle and Stony Point First Nation≈ | Drinking Water | complete | $106.5K | $213.0K | 2017 |
| New Well and Water Supply Pipeline Village of Goodeve | Goodeve | Drinking Water | complete | $106.3K | $212.6K | 2017 |
| Electoral Area D - Area D Integrated Water System Upgrade Regional District of Fraser Valley | Fraser Valley | Drinking Water | complete | $106.3K | $212.5K | 2016 |
| Storm Sewer installation along Gustavus Street from Kaake Street to Bruce Street to eliminate failing infiltration galleries and watermain upgrade to meet growth demand Town of Saugeen Shores | Saugeen Shores | Wastewater | complete | $106.1K | $212.3K | 2018 |
| Replacement of 150m of Eleanor Street Watermain - From Phipps Street to Laird Street Town of Gore Bay | Gore Bay | Drinking Water | complete | $106.1K | $270.6K | 2017 |
| Wingham and Blyth Wastewater Systems Master Plan Township of North Huron | North Huron | Wastewater | complete | $105.6K | $211.1K | 2018 |
| Moyie Watermain Replacement Regional District of East Kootenay | Moyie | Drinking Water | complete | $105.0K | $209.9K | 2017 |
| Storm Water Shed Analysis City of Fredericton | Fredericton | Capacity Building | complete | $104.3K | $208.6K | 2016 |
| Restoration of existing storm sewer collection system, manhole, catch basins and storm sewer pipe. Corporation of the Township of Nipigon | Nipigon | Wastewater | complete | $104.2K | $209.3K | 2017 |
| Storm Sewer Network Study-Old Milton Area Town of Milton | Milton | Wastewater | complete | $104.1K | $208.2K | 2017 |
| Upgrades to the Standpipe Water Storage Tower Township of Bonnechere Valley | Bonnechere Valley | Drinking Water | complete | $104.0K | $440.0K | 2017 |
| Replace Clarifier Domes Town of Marathon | Marathon | Wastewater | complete | $103.9K | $403.0K | 2017 |
| New Development Water and Sewer Village of Blacks Harbour | Blacks Harbour | Drinking Water | complete | $103.8K | $207.6K | 2016 |
| Rehabilitation of Milverton Wastewater Collection System Township of East Perth | Perth East | Wastewater | complete | $103.5K | $207.0K | 2017 |
| Sewage Lift Stations Retrofit Town of Indian Bay | Indian Bay | Wastewater | complete | $103.4K | $206.7K | 2016 |
| Alberta Street Sanitary Pumping Station in Grand Bend - Electrical and Mechanical Upgrades Including Replacement of the Emergency Stand-by Power System Municipality of Lambton Shores | Lambton Shores | Wastewater | complete | $102.8K | $217.4K | 2018 |