2,320projects·$1.8Bfederal of $3.8B eligible
Re-roofing of fifth Street Pumping Station Building
$6.4KHearst · Wastewater
complete·approved 2018
Williamsburg Lagoon Sludge Study
$6.6KSouth Dundas · Wastewater
complete·approved 2018
Badjeros Stormwater Management Study
$6.6KGrey · Wastewater
complete·approved 2018
Upgrade existing pressure reducing valve chamber
$6.7KGeorgian Bluffs · Drinking Water
complete·approved 2017
Water and Wastewater Master Plan Study
$6.9KPerth East · Drinking Water
complete·approved 2017
Water System Sampling Stations
$7.0KRiverside-Albert · Drinking Water
complete·approved 2018
Equipment Upgrades at Councillors' Houses and Meeting Grounds water treatment plant
$7.0KAnishinaabeg of Naongashiing≈ · Drinking Water
complete·approved 2017
Replacing or adding to the Filter Media inside the filter media tanks that provides filtration of particles present in the inflowing water from the treatment cycle after flocculation.
$7.0KSeine River First Nation · Drinking Water
complete·approved 2017
Structural Replacement of a Stormwater Culvert on Dillabough Road
$7.0KAdmaston/Bromley · Wastewater
complete·approved 2017
Repairs to low-lift water pumping station building
$7.3KMattice-Val Côté · Drinking Water
complete·approved 2017
Water treatment plant upgrade - Perform engineering study to design and install a contact time return line from contact chamber to analyzer.
$7.5KDubreuilville · Drinking Water
complete·approved 2017
Dredging of Municipal Lagoon #2 in Powassan
$7.5KPowassan · Wastewater
complete·approved 2017
Equipment Upgrades at Water Treatment Plant
$7.5KMattagami First Nation≈ · Drinking Water
complete·approved 2017
Drilled well/water system at 111 Main Street. Upgrading of water system from lake source water supply to drilled well for human consumption/use
$7.5KKearney · Drinking Water
complete·approved 2017
Upgrade to drilled well water system at 163 Main Street
$7.5KKearney · Drinking Water
complete·approved 2017
Relocation of shut off valve at Water Treatment Plant on Nipissing Street, Sturgeon Falls
$7.5KWest Nipissing · Drinking Water
complete·approved 2017
Equipment Upgrades at the Water Treatment Plant for Chlorine analyzer, Turbidity meter and singer valve.
$7.5KHilton Beach · Drinking Water
complete·approved 2017
Rehabilitation of Water Storage Reservoir at the Water Treatment Plant
$7.6KOneida Nation of the Thames≈ · Drinking Water
complete·approved 2017
Repair and replace five curb valves to improve the water distribution system
$7.7KOpasatika · Drinking Water
complete·approved 2018
Wastewater Lift Pump Replacement
$7.9KPoplar Hill First Nation · Wastewater
complete·approved 2017
Infiltration Study of Stormwater Entering the Wastewater system
$7.9KWauzhushk Onigum First Nation≈ · Wastewater
complete·approved 2017
Pump house Treatment Plant Flow meter
$8.0KCobalt · Drinking Water
complete·approved 2018
Pumphouse Road Water Treatment Plant upgrades to Chart Recorder and Supervisory Control and Data Acquisition (SCADA) system
$8.0KCobalt · Drinking Water
complete·approved 2017
Replacing infrastructure including flow meter and unit heaters at Pumping Station # 1
$8.0KNorth Stormont · Wastewater
complete·approved 2017
Replace existing 8.5 HP raw water low lift pump
$8.1KFauquier-Strickland · Drinking Water
complete·approved 2017
New Water Plant Distribution Pump System
$8.1KLandis · Drinking Water
complete·approved 2017
Replacement of road crossing culvert on County Road 12, south of civic address 4775
$8.1KPrescott and Russell · Wastewater
complete·approved 2017
Replacement of road crossing culvert on County Road 8 north of Baseline Road in Clarence Creek
$8.2KPrescott and Russell · Wastewater
complete·approved 2017
Replacement of road crossing culvert on County Road 8 south of Lalonde Road in Bourget
$8.2KPrescott and Russell · Wastewater
complete·approved 2017
Replace Groundwater Source Well 9 in order to Relieve the Stress on Well 11 and Well 10/12
$8.2KDelaware Nation - Moravian of the Thames≈ · Drinking Water
complete·approved 2017
Union School Road Culvert Rehabilitation
$8.6KNeebing · Wastewater
complete·approved 2018
Filter Effluent Turbidity Meter
$8.8KMitaanjigamiing First Nation≈ · Drinking Water
complete·approved 2017
Seegmiller Avenue Sanitary Sewer Relining
$8.8KKenora · Wastewater
complete·approved 2017
Repair main sewage pump house building
$8.9KOpasatika · Wastewater
complete·approved 2018
New Pump for Sewage Lift Station #1 at 288 Clark Street to Replace Old Worn Pump
$9.0KPowassan · Wastewater
complete·approved 2017
Wastewater Pump Station Upgrade
$9.0KMacnutt · Wastewater
complete·approved 2017
Rehabilitation of Well # 3 located on 6th Street including New Casing and pump
$9.2KArmstrong · Drinking Water
complete·approved 2018
Ninth Avenue South #345 to #322 Sanitary Sewer Relining
$9.3KKenora · Wastewater
complete·approved 2017
Upgrade of Flow Meter Installation and Construction of a Protective Insulated Building
$9.3KThornloe · Wastewater
complete·approved 2017
Upgrade very large culvert Devil's Door Rd.
$9.5KFront of Yonge · Wastewater
complete·approved 2017
Larson Road Culvert Rehabilitation
$9.5KNeebing · Wastewater
complete·approved 2018
Stormwater management: Erosion Away-Elimination of soil erosion and bank stabilization around the Cain Bridge
$9.5KLa Vallee · Wastewater
complete·approved 2018
Upgrades to components of the Supervisory Control and Data Acquisition (SCADA) at the Wastewater Plant
$9.6KHilton Beach · Wastewater
complete·approved 2017
Water System Upgrade/Rehabilitation consisting of: Upgrading of SCADA, Installation of Main Valves & Distribution Hydrants
$9.6KChippewas of Nawash Unceded First Nation≈ · Drinking Water
complete·approved 2018
Water distribution repairs - Replace seals and valves for 2 hydrants
$9.7KDubreuilville · Drinking Water
complete·approved 2017
Central, Main, Burtt, Buchanan, and Mill Street - Storm Drain and Manhole Restructuring
$9.9KCentreville · Wastewater
complete·approved 2016
Planning and design for the replacement of the existing water main and appurtenances from connection point at Elk Street to end of water main
$10.0KMalahide · Drinking Water
complete·approved 2017
Update to Mapping of Water Distribution System (Hornepayne)
$10.0KHornepayne · Drinking Water
complete·approved 2017
Update to Mapping of Wastewater System (Hornepayne)
$10.0KHornepayne · Wastewater
complete·approved 2017
Installation of Sentinel Monitoring Well to ensure the usefull life of the asset identified as Production Well #1 is realized.
$10.0KPenetanguishene · Drinking Water
complete·approved 2018
| Project | Location | Category | Status | Federal | Total | Approved |
|---|---|---|---|---|---|---|
| Re-roofing of fifth Street Pumping Station Building Corporation of the Town of Hearst | Hearst | Wastewater | complete | $6.4K | $13.3K | 2018 |
| Williamsburg Lagoon Sludge Study Corporation of the Municipality of South Dundas | South Dundas | Wastewater | complete | $6.6K | $25.0K | 2018 |
| Badjeros Stormwater Management Study County of Grey | Grey | Wastewater | complete | $6.6K | $15.0K | 2018 |
| Upgrade existing pressure reducing valve chamber Township of Georgian Bluffs | Georgian Bluffs | Drinking Water | complete | $6.7K | $15.0K | 2017 |
| Water and Wastewater Master Plan Study Township of East Perth | Perth East | Drinking Water | complete | $6.9K | $60.0K | 2017 |
| Water System Sampling Stations Village of Riverside-Albert | Riverside-Albert | Drinking Water | complete | $7.0K | $22.2K | 2018 |
| Equipment Upgrades at Councillors' Houses and Meeting Grounds water treatment plant Anishinaabeg of Naongashiing | Anishinaabeg of Naongashiing≈ | Drinking Water | complete | $7.0K | $32.0K | 2017 |
| Replacing or adding to the Filter Media inside the filter media tanks that provides filtration of particles present in the inflowing water from the treatment cycle after flocculation. Seine River First Nation | Seine River First Nation | Drinking Water | complete | $7.0K | $14.0K | 2017 |
| Structural Replacement of a Stormwater Culvert on Dillabough Road Township of Admaston/Bromley | Admaston/Bromley | Wastewater | complete | $7.0K | $14.0K | 2017 |
| Repairs to low-lift water pumping station building Municipality of Mattice-Val Côté | Mattice-Val Côté | Drinking Water | complete | $7.3K | $17.0K | 2017 |
| Water treatment plant upgrade - Perform engineering study to design and install a contact time return line from contact chamber to analyzer. Township of Dubreuilville | Dubreuilville | Drinking Water | complete | $7.5K | $15.0K | 2017 |
| Dredging of Municipal Lagoon #2 in Powassan Municipality of Powassan | Powassan | Wastewater | complete | $7.5K | $15.0K | 2017 |
| Equipment Upgrades at Water Treatment Plant Mattagami First Nation | Mattagami First Nation≈ | Drinking Water | complete | $7.5K | $15.0K | 2017 |
| Drilled well/water system at 111 Main Street. Upgrading of water system from lake source water supply to drilled well for human consumption/use Corporation of the Town of Kearney | Kearney | Drinking Water | complete | $7.5K | $15.0K | 2017 |
| Upgrade to drilled well water system at 163 Main Street Corporation of the Town of Kearney | Kearney | Drinking Water | complete | $7.5K | $15.0K | 2017 |
| Relocation of shut off valve at Water Treatment Plant on Nipissing Street, Sturgeon Falls Municipality of West Nipissing | West Nipissing | Drinking Water | complete | $7.5K | $15.0K | 2017 |
| Equipment Upgrades at the Water Treatment Plant for Chlorine analyzer, Turbidity meter and singer valve. Village of Hilton Beach | Hilton Beach | Drinking Water | complete | $7.5K | $15.0K | 2017 |
| Rehabilitation of Water Storage Reservoir at the Water Treatment Plant Oneida Nation of the Thames | Oneida Nation of the Thames≈ | Drinking Water | complete | $7.6K | $35.0K | 2017 |
| Repair and replace five curb valves to improve the water distribution system Township of Opasatika | Opasatika | Drinking Water | complete | $7.7K | $16.0K | 2018 |
| Wastewater Lift Pump Replacement Poplar Hill First Nation | Poplar Hill First Nation | Wastewater | complete | $7.9K | $20.1K | 2017 |
| Infiltration Study of Stormwater Entering the Wastewater system Anishinabe of Wauzhushk Onigum | Wauzhushk Onigum First Nation≈ | Wastewater | complete | $7.9K | $25.0K | 2017 |
| Pump house Treatment Plant Flow meter Town of Cobalt | Cobalt | Drinking Water | complete | $8.0K | $16.0K | 2018 |
| Pumphouse Road Water Treatment Plant upgrades to Chart Recorder and Supervisory Control and Data Acquisition (SCADA) system Town of Cobalt | Cobalt | Drinking Water | complete | $8.0K | $16.0K | 2017 |
| Replacing infrastructure including flow meter and unit heaters at Pumping Station # 1 Township of North Stormont | North Stormont | Wastewater | complete | $8.0K | $16.0K | 2017 |
| Replace existing 8.5 HP raw water low lift pump Township of Fauquier-Strickland | Fauquier-Strickland | Drinking Water | complete | $8.1K | $16.2K | 2017 |
| New Water Plant Distribution Pump System Village of Landis | Landis | Drinking Water | complete | $8.1K | $16.3K | 2017 |
| Replacement of road crossing culvert on County Road 12, south of civic address 4775 United Counties of Prescott and Russell | Prescott and Russell | Wastewater | complete | $8.1K | $16.6K | 2017 |
| Replacement of road crossing culvert on County Road 8 north of Baseline Road in Clarence Creek United Counties of Prescott and Russell | Prescott and Russell | Wastewater | complete | $8.2K | $16.3K | 2017 |
| Replacement of road crossing culvert on County Road 8 south of Lalonde Road in Bourget United Counties of Prescott and Russell | Prescott and Russell | Wastewater | complete | $8.2K | $16.3K | 2017 |
| Replace Groundwater Source Well 9 in order to Relieve the Stress on Well 11 and Well 10/12 Moravian of the Thames | Delaware Nation - Moravian of the Thames≈ | Drinking Water | complete | $8.2K | $24.3K | 2017 |
| Union School Road Culvert Rehabilitation Municipality of Neebing | Neebing | Wastewater | complete | $8.6K | $17.1K | 2018 |
| Filter Effluent Turbidity Meter Mitaanjigamiing First Nation | Mitaanjigamiing First Nation≈ | Drinking Water | complete | $8.8K | $17.5K | 2017 |
| Seegmiller Avenue Sanitary Sewer Relining City of Kenora | Kenora | Wastewater | complete | $8.8K | $18.6K | 2017 |
| Repair main sewage pump house building Township of Opasatika | Opasatika | Wastewater | complete | $8.9K | $18.0K | 2018 |
| New Pump for Sewage Lift Station #1 at 288 Clark Street to Replace Old Worn Pump Municipality of Powassan | Powassan | Wastewater | complete | $9.0K | $18.0K | 2017 |
| Wastewater Pump Station Upgrade Village of Macnutt | Macnutt | Wastewater | complete | $9.0K | $18.0K | 2017 |
| Rehabilitation of Well # 3 located on 6th Street including New Casing and pump Township of Armstrong | Armstrong | Drinking Water | complete | $9.2K | $20.0K | 2018 |
| Ninth Avenue South #345 to #322 Sanitary Sewer Relining City of Kenora | Kenora | Wastewater | complete | $9.3K | $20.0K | 2017 |
| Upgrade of Flow Meter Installation and Construction of a Protective Insulated Building Village of Thornloe | Thornloe | Wastewater | complete | $9.3K | $20.0K | 2017 |
| Upgrade very large culvert Devil's Door Rd. Township of Front of Yonge | Front of Yonge | Wastewater | complete | $9.5K | $19.0K | 2017 |
| Larson Road Culvert Rehabilitation Municipality of Neebing | Neebing | Wastewater | complete | $9.5K | $19.0K | 2018 |
| Stormwater management: Erosion Away-Elimination of soil erosion and bank stabilization around the Cain Bridge Township of La Vallee | La Vallee | Wastewater | complete | $9.5K | $19.1K | 2018 |
| Upgrades to components of the Supervisory Control and Data Acquisition (SCADA) at the Wastewater Plant Village of Hilton Beach | Hilton Beach | Wastewater | complete | $9.6K | $19.1K | 2017 |
| Water System Upgrade/Rehabilitation consisting of: Upgrading of SCADA, Installation of Main Valves & Distribution Hydrants Chippewas of Nawash Unceded First Nation | Chippewas of Nawash Unceded First Nation≈ | Drinking Water | complete | $9.6K | $22.5K | 2018 |
| Water distribution repairs - Replace seals and valves for 2 hydrants Township of Dubreuilville | Dubreuilville | Drinking Water | complete | $9.7K | $20.0K | 2017 |
| Central, Main, Burtt, Buchanan, and Mill Street - Storm Drain and Manhole Restructuring Village of Centreville | Centreville | Wastewater | complete | $9.9K | $19.7K | 2016 |
| Planning and design for the replacement of the existing water main and appurtenances from connection point at Elk Street to end of water main Township of Malahide | Malahide | Drinking Water | complete | $10.0K | $30.0K | 2017 |
| Update to Mapping of Water Distribution System (Hornepayne) Township of Hornepayne | Hornepayne | Drinking Water | complete | $10.0K | $20.0K | 2017 |
| Update to Mapping of Wastewater System (Hornepayne) Township of Hornepayne | Hornepayne | Wastewater | complete | $10.0K | $20.0K | 2017 |
| Installation of Sentinel Monitoring Well to ensure the usefull life of the asset identified as Production Well #1 is realized. Town of Penetanguishene | Penetanguishene | Drinking Water | complete | $10.0K | $20.0K | 2018 |