7,621projects·$25.3Bfederal of $68.9B eligible
Lyon Ditch Drainage Improvements including Increased Capacity
$50.0KThunder Bay · Wastewater
complete·approved 2017
Replacement of Sanitary Sewer connections on First Avenue: Memorial Avenue to Fort William Road
$50.0KThunder Bay · Wastewater
complete·approved 2017
Eight Street Storm Drainage Improvements
$50.0KBracebridge · Wastewater
complete·approved 2017
Replacement of Approximately 62 Stormwater Culverts Township Wide
$50.0KO'Connor · Wastewater
complete·approved 2017
Replace culverts and raise the grade of Leighton Road at various locations
$50.0KMachar · Wastewater
complete·approved 2017
High Lift Pump upgrades recirculation piping in the Dorchester Water Treatment Plant
$50.0KThames Centre · Drinking Water
complete·approved 2017
Upgrade Programmable Logic Controller (PLC)
$50.0KBlack River-Matheson · Drinking Water
complete·approved 2017
Investigate and implement a rehabilitation or treatment strategy for arsenic in the Dungannon Wells
$50.0KAshfield-Colborne-Wawanosh · Drinking Water
complete·approved 2017
Leeper Street replacement watermain from Shickluna Street to Hamilton Street
$50.0KSt. Catharines · Drinking Water
complete·approved 2017
Rehabilitation Project involving the Relining of Water Storage Tower that supports the Water Treatment System serving 500 Customers
$50.0KSables-Spanish Rivers · Drinking Water
complete·approved 2017
Upgrade/rehabilitation of storm sewers on Mill Street, village of St-Eugene that serves 12 residential houses and one (1) business.
$50.0KEast Hawkesbury · Wastewater
complete·approved 2017
Replacement and relocation of manhole to house the flow meter and replace the flow meter due to flooding
$50.0KCasey · Wastewater
complete·approved 2017
Sewage well upgrades at London Road Complex
$50.0KHuron · Wastewater
complete·approved 2017
Slope Excavation, Application of Geosynthetic Clay Liner, Regrading of the Failing Berm as well as required Engineering at the Baldwin Township Exfiltrating Lagoon
$50.0KBaldwin · Wastewater
complete·approved 2017
Stormwater Management Pond Refurbishment - Infrastructure Repairs and Pond Dredging - Multiple Locations
$50.0KBurlington · Wastewater
complete·approved 2017
Structural replacement/extension of the 600mm stormsewer at Arthur Street and regrading of surface drainage parallel to Lansdowne Ave
$50.0KCarleton Place · Wastewater
complete·approved 2017
Upgrade to main outlet pipe from Chapple Lagoon
$50.0KChapple · Wastewater
complete·approved 2017
Relocation and Replacement of Membrane Programmable Logic Controller (PLC) at the Little Current Water Treatment Plant
$50.0KNortheastern Manitoulin and The Islands · Drinking Water
complete·approved 2017
Upgrades to the Matachewan Stormwater Control System Located in an Area Covering 10 Municipal Streets between Calbeck Avenue and Helen Avenue
$50.0KMatachewan · Wastewater
complete·approved 2017
Accessible Transit Stop Upgrades of Up to 10-12 New Accessible Transit Stops
$50.0KPeterborough · Public Transit
complete·approved 2017
Public Access Extension for Designated Bus Stops
$50.0KPenetanguishene · Active Transportation
complete·approved 2017
Bicycle Detection Improvements at 4 intersections
$50.0KLondon · Active Transportation
complete·approved 2017
Implementation of a bulk fluid asset control system
$50.0KWindsor · Public Transit
complete·approved 2017
Installation of a new fuel storage tank to refuel buses
$50.0KSarnia · Public Transit
complete·approved 2016
Replace of manual fare boxes with electronic fare boxes on specialized transit vehicles (phase II)
$50.0KWelland · Public Transit
complete·approved 2016
Reconstruction of the Main Entrance at the Vernon Library
$50.0KOttawa · Culture
complete·approved 2010
North Englehart Management Unit (EMU) Road rehabilitation
$50.0KKirkland Lake · Highways and Roads
complete·approved 2010
Killbear Picnic Shelter
$50.0KNobel · Recreation
complete·approved 2010
Highway 7 and Edgeley Boulevard
$50.0KVaughan · Highways and Roads
complete·approved 2009
Multi-Purpose trail
$50.0KNiagara-on-the-Lake · Active Transportation
complete·approved 2009
Landfill Site Improvements
$50.0KArmour · Solid Waste Management
complete·approved 2009
Parks Rehabilitation
$50.0KSt. Joseph · Recreation
complete·approved 2009
Warsaw Community Centre
$50.0KDouro-Dummer · Recreation
complete·approved 2009
Replacement of Shewfelt Creek Bridge
$50.0KDesbarats · Highways and Roads
complete·approved 2005
Replacement of the Primary Disinfection Storage and Dosing System at the Nanticoke Water Treatment Plant
$50.0KHaldimand · Drinking Water
complete·approved 2017
Replacement of the Lagoon Lift Station Pump
$50.3KEnglehart · Wastewater
complete·approved 2009
York Street - Regent Street to Paris Street - Sewer Main Lining
$50.4KGreater Sudbury · Wastewater
complete·approved 2018
Upgrades to the Westport Waterworks
$50.5KWestport · Drinking Water
complete·approved 2009
Replacement of One Transit Bus
$50.5KWasaga Beach · Public Transit
complete·approved 2017
Noise Attenuation Barrier Replacement - Confederation Parkway
$50.5KMississauga · Highways and Roads
complete·approved 2009
Rehabilitation of a Culvert and Bridge on East West Line
$50.6KVirgil · Highways and Roads
complete·approved 2005
Supervisory Control and Data Acquisition (SCADA) System Purchase and Installation
$50.6KTehkummah · Drinking Water
complete·approved 2017
Local Road Resurfacing
$50.6KToronto · Highways and Roads
complete·approved 2009
Construction of Recycling Drop-Off Facility
$50.7KWhite River · Solid Waste Management
complete·approved 2006
Strategic Review of Specialized Transit Service to meet accessibility needs
$50.9KOakville · Public Transit
complete·approved 2018
Marwood Place
$50.9KVaughan · Highways and Roads
complete·approved 2009
Sidewalk Improvements
$51.0KHuntsville · Public Transit
complete·approved 2017
Ganaraska Forest Trail Improvement
$51.0KKingston · Recreation
complete·approved 2009
Replace Existing Bus
$51.0KBrockville · Public Transit
complete·approved 2016
Rehabilitation of Adam's Road in Eton
$51.1KOxdrift · Highways and Roads
complete·approved 2009
| Project | Location | Category | Status | Federal | Total | Approved |
|---|---|---|---|---|---|---|
| Lyon Ditch Drainage Improvements including Increased Capacity Corporation of the City of Thunder Bay | Thunder Bay | Wastewater | complete | $50.0K | $100.0K | 2017 |
| Replacement of Sanitary Sewer connections on First Avenue: Memorial Avenue to Fort William Road Corporation of the City of Thunder Bay | Thunder Bay | Wastewater | complete | $50.0K | $100.0K | 2017 |
| Eight Street Storm Drainage Improvements Corporation of the Town of Bracebridge | Bracebridge | Wastewater | complete | $50.0K | $150.0K | 2017 |
| Replacement of Approximately 62 Stormwater Culverts Township Wide Township of O'Connor | O'Connor | Wastewater | complete | $50.0K | $151.1K | 2017 |
| Replace culverts and raise the grade of Leighton Road at various locations Township of Machar | Machar | Wastewater | complete | $50.0K | $100.0K | 2017 |
| High Lift Pump upgrades recirculation piping in the Dorchester Water Treatment Plant Municipality of Thames Centre | Thames Centre | Drinking Water | complete | $50.0K | $100.0K | 2017 |
| Upgrade Programmable Logic Controller (PLC) Township of Black River-Matheson | Black River-Matheson | Drinking Water | complete | $50.0K | $110.0K | 2017 |
| Investigate and implement a rehabilitation or treatment strategy for arsenic in the Dungannon Wells Township of Ashfield-Colborne-Wawanosh | Ashfield-Colborne-Wawanosh | Drinking Water | complete | $50.0K | $842.3K | 2017 |
| Leeper Street replacement watermain from Shickluna Street to Hamilton Street Corporation of the City of St. Catharines | St. Catharines | Drinking Water | complete | $50.0K | $100.0K | 2017 |
| Rehabilitation Project involving the Relining of Water Storage Tower that supports the Water Treatment System serving 500 Customers Township of Sables-Spanish Rivers | Sables-Spanish Rivers | Drinking Water | complete | $50.0K | $143.0K | 2017 |
| Upgrade/rehabilitation of storm sewers on Mill Street, village of St-Eugene that serves 12 residential houses and one (1) business. Corporation of the Township of East Hawkesbury | East Hawkesbury | Wastewater | complete | $50.0K | $113.8K | 2017 |
| Replacement and relocation of manhole to house the flow meter and replace the flow meter due to flooding Township of Casey | Casey | Wastewater | complete | $50.0K | $100.0K | 2017 |
| Sewage well upgrades at London Road Complex County of Huron | Huron | Wastewater | complete | $50.0K | $100.0K | 2017 |
| Slope Excavation, Application of Geosynthetic Clay Liner, Regrading of the Failing Berm as well as required Engineering at the Baldwin Township Exfiltrating Lagoon Township of Baldwin | Baldwin | Wastewater | complete | $50.0K | $104.6K | 2017 |
| Stormwater Management Pond Refurbishment - Infrastructure Repairs and Pond Dredging - Multiple Locations City of Burlington | Burlington | Wastewater | complete | $50.0K | $100.0K | 2017 |
| Structural replacement/extension of the 600mm stormsewer at Arthur Street and regrading of surface drainage parallel to Lansdowne Ave The Corporation of the Town of Carleton Place. | Carleton Place | Wastewater | complete | $50.0K | $100.0K | 2017 |
| Upgrade to main outlet pipe from Chapple Lagoon Township of Chapple | Chapple | Wastewater | complete | $50.0K | $101.1K | 2017 |
| Relocation and Replacement of Membrane Programmable Logic Controller (PLC) at the Little Current Water Treatment Plant Town of Northeastern Manitoulin and the Islands | Northeastern Manitoulin and The Islands | Drinking Water | complete | $50.0K | $150.0K | 2017 |
| Upgrades to the Matachewan Stormwater Control System Located in an Area Covering 10 Municipal Streets between Calbeck Avenue and Helen Avenue Township of Matachewan | Matachewan | Wastewater | complete | $50.0K | $100.0K | 2017 |
| Accessible Transit Stop Upgrades of Up to 10-12 New Accessible Transit Stops City of Peterborough | Peterborough | Public Transit | complete | $50.0K | $106.2K | 2017 |
| Public Access Extension for Designated Bus Stops Town of Penetanguishene | Penetanguishene | Active Transportation | complete | $50.0K | $100.0K | 2017 |
| Bicycle Detection Improvements at 4 intersections Corporation of the City of London | London | Active Transportation | complete | $50.0K | $100.0K | 2017 |
| Implementation of a bulk fluid asset control system City of Windsor | Windsor | Public Transit | complete | $50.0K | $100.0K | 2017 |
| Installation of a new fuel storage tank to refuel buses Corporation of the City of Sarnia. | Sarnia | Public Transit | complete | $50.0K | $100.0K | 2016 |
| Replace of manual fare boxes with electronic fare boxes on specialized transit vehicles (phase II) City of Welland | Welland | Public Transit | complete | $50.0K | $100.0K | 2016 |
| Reconstruction of the Main Entrance at the Vernon Library City of Ottawa | Ottawa | Culture | complete | $50.0K | $150.0K | 2010 |
| North Englehart Management Unit (EMU) Road rehabilitation Government of Ontario | Kirkland Lake | Highways and Roads | complete | $50.0K | $100.0K | 2010 |
| Killbear Picnic Shelter Government of Ontario | Nobel | Recreation | complete | $50.0K | $100.0K | 2010 |
| Highway 7 and Edgeley Boulevard City of Vaughan | Vaughan | Highways and Roads | complete | $50.0K | $150.0K | 2009 |
| Multi-Purpose trail Town of Niagara-on-the-Lake | Niagara-on-the-Lake | Active Transportation | complete | $50.0K | $150.0K | 2009 |
| Landfill Site Improvements Township of Armour | Armour | Solid Waste Management | complete | $50.0K | $150.0K | 2009 |
| Parks Rehabilitation Township of St. Joseph | St. Joseph | Recreation | complete | $50.0K | $150.0K | 2009 |
| Warsaw Community Centre Township of Douro-Dummer | Douro-Dummer | Recreation | complete | $50.0K | $150.0K | 2009 |
| Replacement of Shewfelt Creek Bridge Township of Johnson | Desbarats | Highways and Roads | complete | $50.0K | $150.0K | 2005 |
| Replacement of the Primary Disinfection Storage and Dosing System at the Nanticoke Water Treatment Plant County of Haldimand | Haldimand | Drinking Water | complete | $50.0K | $141.0K | 2017 |
| Replacement of the Lagoon Lift Station Pump Town of Englehart | Englehart | Wastewater | complete | $50.3K | $151.0K | 2009 |
| York Street - Regent Street to Paris Street - Sewer Main Lining City of Greater Sudbury | Greater Sudbury | Wastewater | complete | $50.4K | $106.3K | 2018 |
| Upgrades to the Westport Waterworks Village of Westport | Westport | Drinking Water | complete | $50.5K | $151.5K | 2009 |
| Replacement of One Transit Bus Town of Wasaga Beach | Wasaga Beach | Public Transit | complete | $50.5K | $105.0K | 2017 |
| Noise Attenuation Barrier Replacement - Confederation Parkway City of Mississauga | Mississauga | Highways and Roads | complete | $50.5K | $176.0K | 2009 |
| Rehabilitation of a Culvert and Bridge on East West Line Town of Niagara-On-The-Lake | Virgil | Highways and Roads | complete | $50.6K | $151.8K | 2005 |
| Supervisory Control and Data Acquisition (SCADA) System Purchase and Installation Township of Tehkummah | Tehkummah | Drinking Water | complete | $50.6K | $101.2K | 2017 |
| Local Road Resurfacing City of Toronto | Toronto | Highways and Roads | complete | $50.6K | $189.6K | 2009 |
| Construction of Recycling Drop-Off Facility Township of White River | White River | Solid Waste Management | complete | $50.7K | $152.2K | 2006 |
| Strategic Review of Specialized Transit Service to meet accessibility needs Town of Oakville | Oakville | Public Transit | complete | $50.9K | $115.0K | 2018 |
| Marwood Place City of Vaughan | Vaughan | Highways and Roads | complete | $50.9K | $152.8K | 2009 |
| Sidewalk Improvements Corporation of the Town of Huntsville | Huntsville | Public Transit | complete | $51.0K | $102.0K | 2017 |
| Ganaraska Forest Trail Improvement Ontario Federation of Trail Riders: OFTR | Kingston | Recreation | complete | $51.0K | $103.3K | 2009 |
| Replace Existing Bus City of Brockville | Brockville | Public Transit | complete | $51.0K | $115.8K | 2016 |
| Rehabilitation of Adam's Road in Eton Local Roads Board of Eton | Oxdrift | Highways and Roads | complete | $51.1K | $113.5K | 2009 |