2,320projects·$1.8Bfederal of $3.8B eligible
West Don River Sanitary Infrastructure Protection and Bank Protection along the West Don River near Highway 7 and Centre Street: Geomorphic Study
$37.5KYork · Wastewater
complete·approved 2017
Installation of Water Meters on existing water services in Hamlet of Newington
$37.5KSouth Stormont · Drinking Water
complete·approved 2017
Flood Study for Tannery Creek
$37.5KAurora · Wastewater
complete·approved 2017
Conduct Condition Assessment on Six Stormwater Management Ponds
$37.5KAjax · Wastewater
complete·approved 2017
Pender Harbour, Canoe Road Community Septic Field System Replacement
$37.5KSunshine Coast · Wastewater
complete·approved 2017
Mayo Valve Replacements
$37.2KMayo · Drinking Water
complete·approved 2016
Slip-line existing stormwater culverts located along Springerhill Road and Calton Line
$37.0KMalahide · Wastewater
complete·approved 2018
Belgrave Water System Capital Upgrades & Rehabilitation
$37.0KMorris-Turnberry · Drinking Water
complete·approved 2017
Upgrade water treatment plant for improved water treatability
$36.9KWhitefish River First Nation≈ · Drinking Water
complete·approved 2017
Filter and Pump System Repairs at Water Treatment Plant
$36.7KSheguiandah First Nation · Drinking Water
complete·approved 2017
Mitigation Analysis - Le Goulet Lake
$36.5KLe Goulet · Capacity Building
complete·approved 2016
Feasibility study and assessment of water distribution and sewage collection system at the Ginoogaming First Nation
$36.0KGinoogaming First Nation≈ · Wastewater
complete·approved 2017
Upgrades to the Pickerel River Water Treatment Plant and Tower of supervisory control and data acquisition (SCADA) System
$36.0KHenvey Inlet First Nation≈ · Drinking Water
complete·approved 2017
Replace Ultraviolet (UV) unit at the wastewater treatment plant
$35.8KEdwardsburgh/Cardinal · Wastewater
complete·approved 2017
Replacement of Existing 30 year old Stationary Generator and Associated Electrical Works at the River Street Sewage Pumping Station
$35.7KTweed · Wastewater
complete·approved 2017
Design and Planning for upgrades of Greavette Storm Sewer/Drainage System at 325 Greavette Street that serves 11 hectares of the urban core
$35.6KGravenhurst · Wastewater
complete·approved 2017
Appleby Creek Environmental Assessment and Detailed Design for Stormwater Management- Fairview Street to Pinedale Avenue
$35.3KBurlington · Wastewater
complete·approved 2017
Town of Huntsville Drainage Study
$35.0KHuntsville · Wastewater
complete·approved 2017
Replace and reprogram computer sofware that runs Water Treatment Plant
$35.0KLatchford · Drinking Water
complete·approved 2017
Sewage Treatment Plant Upgrade: Feasibility Study
$35.0KEast St. Paul · Wastewater
complete·approved 2017
Develop a Water Feasibility Study
$34.9KThessalon First Nation · Drinking Water
complete·approved 2017
Sediment Removal from Pond 55 to Restore Design Permanent Pool Volume of 180 m3
$34.8KWaterloo · Wastewater
complete·approved 2017
Stormwater Collection Network Assessment and Study
$34.8KBrantford · Wastewater
complete·approved 2017
Minor upgrades to the raw water intake & pumping and piping systems low lift pumping station
$34.7KDeep River · Drinking Water
complete·approved 2017
Replacement of Existing Pumps at Wastewater Collection Pump Station #2 with Chopper Pumps
$34.6KMeaford · Wastewater
complete·approved 2017
Village of McAdam Water Control System Infrastructure Improvement
$34.1KMcAdam · Drinking Water
complete·approved 2016
Raw sewage pump preplacement and soft start installlation for the waste water treatment plant
$33.9KLarder Lake · Wastewater
complete·approved 2017
Environmental Assessment, Engineering and Design of a Gravity Sewer Extension
$33.9KCramahe · Wastewater
complete·approved 2017
Sewer Collection System Rehabilitation Addressing High Infiltration Rates
$33.6KMarmora and Lake · Wastewater
complete·approved 2017
Wastewater Treatment Plant refurbishment of clarifier overflow baffles, restoration of concrete, and installation of new clarifier drive mechanism
$33.6KMarmora and Lake · Wastewater
complete·approved 2017
Water Storage Mixer installations in 3 water storage reservoirs in Dorchester
$33.2KThames Centre · Drinking Water
underway·approved 2017
Rehabilitation of Existing Storm Sewers (Mississippi Mills)
$33.0KLanark · Wastewater
complete·approved 2017
Repair/Replace 20 Curb Stops Within the Water Distribution System
$32.9KHornepayne · Drinking Water
complete·approved 2017
Stormwater Management Pond # PD65-02 Sediment Management
$32.8KWhitby · Wastewater
complete·approved 2017
Aroland First Nation Sewage Lagoons Remediation
$32.8KAroland First Nation · Wastewater
complete·approved 2017
Upgrade the Johnson Township Water Treatment Plant
$32.7KJohnson · Drinking Water
complete·approved 2017
Replace three (3) low-lift pumps at the Hearst Water Treatment Plant with new energy efficient pumps equipped with Variable Frequency Drives
$32.5KHearst · Drinking Water
complete·approved 2018
Merrill Crescent Community Septic Field System Replacement
$32.5KSunshine Coast · Wastewater
complete·approved 2017
Longlac Ward Albany Place Watermain and Sewer Replacement
$31.9KGreenstone · Drinking Water
complete·approved 2018
Engineering Design for the Installation of a Dechlorinating System
$31.8KPenetanguishene · Wastewater
complete·approved 2018
Develop Engineered Tender Ready Drawings for Water / Wastewater Infrastructure Replacement in Balmertown and Cochenour
$31.5KRed Lake · Drinking Water
complete·approved 2018
Water Treatment Plant supervisory control and data acquisition System Upgrade of existing system at 37 Concession Street
$31.2KWestport · Drinking Water
complete·approved 2017
Final Engineering Design and Construction of watermain underground at King Street (Webster to George), in conjunction with road reconstruction works at the same location
$30.9KWilmot · Drinking Water
complete·approved 2017
Structural Integrity evaluation of Tower Street Elevated Storage Tank.
$30.9KKingston · Drinking Water
complete·approved 2017
Station Street Lateral Assessments and Pipe Rehabilitation
$30.3KWest Lincoln · Wastewater
complete·approved 2017
Upgrading, Improvement and Rehabilitation of pumps #1 and #2, pump camera and mag meter at the Finch Water Treatment Facility
$30.1KNorth Stormont · Drinking Water
complete·approved 2017
Replace submersible wastewater pumps at the St. Regis Wastewater Treatment Plant
$30.1KMohawks of Akwesasne First Nation≈ · Wastewater
complete·approved 2017
Detailed design and survey - Remedial stormwater drainage in Odessa West neighbourhood
$30.0KLoyalist · Wastewater
complete·approved 2017
Environmental Assessment for Replacement of the Hensall Water Tower
$30.0KBluewater · Drinking Water
complete·approved 2017
Water System Efficiency Plan
$30.0KCastlegar · Drinking Water
complete·approved 2017