2,320projects·$1.8Bfederal of $3.8B eligible
Extension of municipal services - Highway 216 (rue des Érables)
$135.0KSaint-Elzéar (Chaudière-Appalaches) · Drinking Water
complete·approved 2016
Sewer Main upgrade, with replacement of asbestos pipe to new 200 mm Polyvinyl chloride (PVC) main and storm sewer main
$134.7KIgnace · Wastewater
complete·approved 2017
Rehabilitation/Replacement of a 975mm Corrugated Steel Pipe Culvert at 6550 King-Vaughan Road, just east of Huntington Road
$134.0KVaughan · Wastewater
complete·approved 2018
Larchwood Sewer Replacement-2017
$133.9KSlemon Park · Wastewater
complete·approved 2017
Valley Drive Sanitary Sewer Relining
$133.7KKenora · Wastewater
complete·approved 2017
Main Street - Storm Sewer Renewal
$132.9KBlackville · Wastewater
complete·approved 2016
New hydro feed to the Dundas Street Pumping Station
$132.8KQuinte West · Wastewater
complete·approved 2017
Anthony Road Water Sewer
$132.5KClarke's Beach · Drinking Water
complete·approved 2016
Replacement and Upgrade of Debris Removal System in the Inlet Works at the Water Pollution Control Plant
$132.5KOrangeville · Wastewater
complete·approved 2017
Sustainable Watershed Systems through Asset Management
$132.5KDuncan · Wastewater
complete·approved 2017
Water Reservoir Rehabilitation and technical / operational rebuild (Michipicoten River Village)
$132.1KWawa · Drinking Water
complete·approved 2018
Dark Tickle Sewer System
$131.3KSt. Lunaire-Griquet · Wastewater
complete·approved 2016
Trunk Storm Sewer Replacement (Moir Street to the Irvine River) to Reduce Risk of Flooding the Downtown Elora and Nearby Neighbourhood
$131.1KCentre Wellington · Wastewater
complete·approved 2017
Repairs and Upgrades at Sewage Lift Stations
$131.0KSandy Lake First Nation · Wastewater
underway·approved 2017
Water Treatment Plant System Upgrades
$131.0KWelwyn · Drinking Water
complete·approved 2017
East London - Sanitary Servicing Study
$130.9KLondon · Wastewater
complete·approved 2018
MacHenry Street Watermain Replacement - 250M of Watermain Replacement Through unopened Road Allowance under the Alexander Municipal Drain in Forest Ontario.
$130.4KLambton Shores · Drinking Water
complete·approved 2018
Robert Adams Pond Rehabilitation and Sediment Cleanout including Removal of approximately 1,200m3 of sediment
$129.8KClarington · Wastewater
complete·approved 2018
Installation of Wallacetown Elevated Tank ReChlorination System
$129.5KDutton/Dunwich · Drinking Water
complete·approved 2017
Lindsay Water Treatment Plant Filter Media Replacement
$129.1KKawartha Lakes · Drinking Water
complete·approved 2017
Moose Factory Sewage Lagoon Upgrade
$128.0KMoose Cree First Nation≈ · Wastewater
complete·approved 2017
Wastewater Pump Station Upgrade
$128.0KManitou Beach · Wastewater
complete·approved 2017
Storm sewer installation and remediation in the Thorold South catchment area
$128.0KThorold · Wastewater
complete·approved 2017
Water treatment plant roof replacement
$127.4KChannel-Port aux Basques · Drinking Water
complete·approved 2016
Lift Station Upgrade
$127.3KRocanville · Wastewater
complete·approved 2017
Sewer System Upgrades
$126.6KSpringdale · Wastewater
complete·approved 2016
Structural upgrade of Sand Hill area water services
$125.0KWest Nipissing · Drinking Water
complete·approved 2017
Construction of 1500mm Stormwater Outfall at James Street - Neebing River to Riverview Drive
$125.0KThunder Bay · Wastewater
complete·approved 2017
Construction of a 450-525 mm Relief Storm Sewer from McGill Crescent to the Dalhousie / McMaster St. Area
$125.0KThunder Bay · Wastewater
complete·approved 2017
Pontiac Pumping Station Drainage Assessment
$125.0KWindsor · Wastewater
complete·approved 2017
St Paul Pumping Station Drainage Assessment
$125.0KWindsor · Wastewater
complete·approved 2017
System Evaluation and Implementation of Green Infrastructure for Stormwater Management
$125.0KPeel · Wastewater
complete·approved 2017
Strathmere Court - Robinson Drive East to Robinson Drive West - Water Main Lining
$125.0KGreater Sudbury · Drinking Water
complete·approved 2016
Water Line Bypass Caribou Road
$124.3KChannel-Port aux Basques · Drinking Water
complete·approved 2016
Replacement of wastewater, water, storm sewer and road infrastrucutre on Winnipeg Road and Toronto Boulevard in the village of Vanastra with the Municipality of Huron East
$124.1KHuron East · Wastewater
complete·approved 2017
Sewer Main upgrade, with replacement of one sewer main approximately 170 meters long and replacement of one sewer main approximately 50 meters long
$123.5KIgnace · Wastewater
complete·approved 2017
Bayfield Wastewater System Inflow and Infilitration Study
$123.1KBluewater · Wastewater
complete·approved 2017
Steele Valley Stormwater Management Pond Rehabilitation and Repair
$123.0KAjax · Wastewater
complete·approved 2017
Upgrade of brick manholes in numerous locations throughout Sturgeon Falls
$121.9KWest Nipissing · Wastewater
complete·approved 2018
Chlorine Booster Station
$121.4KHowley · Drinking Water
complete·approved 2016
Renewal of water pipes
$121.1KBarraute · Drinking Water
complete·approved 2017
New Wastewater Pump Station
$121.1KWaverley No. 44 · Wastewater
complete·approved 2017
Wastewater System Condition Assessment and Optimization
$120.1KTahsis · Wastewater
complete·approved 2017
Yorkshire Drive - Culvert Replacement near Sewer Plant
$120.0KGreater Sudbury · Wastewater
complete·approved 2018
Lakeshore West Pollution Control Plant Effleunt Ultraviolet (UV) System Replacement
$120.0KKingsville · Wastewater
complete·approved 2017
Engineering Design & Approvals for the Dorchester Wastewater Treatment Plant expansion to 1200 cubic meters capacity
$120.0KThames Centre · Wastewater
complete·approved 2017
Long-Term Wastewater Treatment Plant Upgrades
$119.6KLumby · Wastewater
complete·approved 2017
Water and Wastewater Infrastructure Network Study
$118.8KSparwood · Wastewater
complete·approved 2017
Treated Water Distribution Upgrades
$118.1KWarner · Drinking Water
complete·approved 2017
Replacement of two 125 horsepower conventional aeration blowers with one 150 horsepower magnetic bearing blower at Regional Wastewater Treatment Plant (WWTP)
$117.9KNew Tecumseth · Wastewater
complete·approved 2017
| Project | Location | Category | Status | Federal | Total | Approved |
|---|---|---|---|---|---|---|
| Extension of municipal services - Highway 216 (rue des Érables) Municipality of Saint-Elzéar | Saint-Elzéar (Chaudière-Appalaches) | Drinking Water | complete | $135.0K | $270.0K | 2016 |
| Sewer Main upgrade, with replacement of asbestos pipe to new 200 mm Polyvinyl chloride (PVC) main and storm sewer main Township of Ignace | Ignace | Wastewater | complete | $134.7K | $278.4K | 2017 |
| Rehabilitation/Replacement of a 975mm Corrugated Steel Pipe Culvert at 6550 King-Vaughan Road, just east of Huntington Road City of Vaughan | Vaughan | Wastewater | complete | $134.0K | $268.0K | 2018 |
| Larchwood Sewer Replacement-2017 Slemon Park | Slemon Park | Wastewater | complete | $133.9K | $267.7K | 2017 |
| Valley Drive Sanitary Sewer Relining City of Kenora | Kenora | Wastewater | complete | $133.7K | $296.7K | 2017 |
| Main Street - Storm Sewer Renewal Village of Blackville | Blackville | Wastewater | complete | $132.9K | $275.0K | 2016 |
| New hydro feed to the Dundas Street Pumping Station City of Quinte West | Quinte West | Wastewater | complete | $132.8K | $300.0K | 2017 |
| Anthony Road Water Sewer Town of Clarkes Beach | Clarke's Beach | Drinking Water | complete | $132.5K | $279.0K | 2016 |
| Replacement and Upgrade of Debris Removal System in the Inlet Works at the Water Pollution Control Plant Town of Orangeville | Orangeville | Wastewater | complete | $132.5K | $265.0K | 2017 |
| Sustainable Watershed Systems through Asset Management Regional District of Cowichan Valley | Duncan | Wastewater | complete | $132.5K | $265.0K | 2017 |
| Water Reservoir Rehabilitation and technical / operational rebuild (Michipicoten River Village) Municipality of Wawa | Wawa | Drinking Water | complete | $132.1K | $265.0K | 2018 |
| Dark Tickle Sewer System Town of St. Lunaire-Griquet | St. Lunaire-Griquet | Wastewater | complete | $131.3K | $262.6K | 2016 |
| Trunk Storm Sewer Replacement (Moir Street to the Irvine River) to Reduce Risk of Flooding the Downtown Elora and Nearby Neighbourhood Corporation of the Township of Centre Wellington | Centre Wellington | Wastewater | complete | $131.1K | $360.0K | 2017 |
| Repairs and Upgrades at Sewage Lift Stations Sandy Lake First Nation | Sandy Lake First Nation | Wastewater | underway | $131.0K | $262.0K | 2017 |
| Water Treatment Plant System Upgrades Village of Welwyn | Welwyn | Drinking Water | complete | $131.0K | $262.0K | 2017 |
| East London - Sanitary Servicing Study Corporation of the City of London | London | Wastewater | complete | $130.9K | $300.0K | 2018 |
| MacHenry Street Watermain Replacement - 250M of Watermain Replacement Through unopened Road Allowance under the Alexander Municipal Drain in Forest Ontario. Municipality of Lambton Shores | Lambton Shores | Drinking Water | complete | $130.4K | $314.2K | 2018 |
| Robert Adams Pond Rehabilitation and Sediment Cleanout including Removal of approximately 1,200m3 of sediment Corporation of the Municipality of Clarington | Clarington | Wastewater | complete | $129.8K | $270.0K | 2018 |
| Installation of Wallacetown Elevated Tank ReChlorination System Municipality of Dutton Dunwich | Dutton/Dunwich | Drinking Water | complete | $129.5K | $490.0K | 2017 |
| Lindsay Water Treatment Plant Filter Media Replacement City of Kawartha Lakes | Kawartha Lakes | Drinking Water | complete | $129.1K | $465.0K | 2017 |
| Moose Factory Sewage Lagoon Upgrade Moose Cree First Nation | Moose Cree First Nation≈ | Wastewater | complete | $128.0K | $256.0K | 2017 |
| Wastewater Pump Station Upgrade Resort Village of Manitou Beach | Manitou Beach | Wastewater | complete | $128.0K | $256.0K | 2017 |
| Storm sewer installation and remediation in the Thorold South catchment area City of Thorold | Thorold | Wastewater | complete | $128.0K | $256.0K | 2017 |
| Water treatment plant roof replacement Town of Channel-Port aux Basques | Channel-Port aux Basques | Drinking Water | complete | $127.4K | $254.8K | 2016 |
| Lift Station Upgrade Town of Rocanville | Rocanville | Wastewater | complete | $127.3K | $254.5K | 2017 |
| Sewer System Upgrades Town of Springdale | Springdale | Wastewater | complete | $126.6K | $253.2K | 2016 |
| Structural upgrade of Sand Hill area water services Municipality of West Nipissing | West Nipissing | Drinking Water | complete | $125.0K | $250.0K | 2017 |
| Construction of 1500mm Stormwater Outfall at James Street - Neebing River to Riverview Drive Corporation of the City of Thunder Bay | Thunder Bay | Wastewater | complete | $125.0K | $250.0K | 2017 |
| Construction of a 450-525 mm Relief Storm Sewer from McGill Crescent to the Dalhousie / McMaster St. Area Corporation of the City of Thunder Bay | Thunder Bay | Wastewater | complete | $125.0K | $250.0K | 2017 |
| Pontiac Pumping Station Drainage Assessment City of Windsor | Windsor | Wastewater | complete | $125.0K | $250.0K | 2017 |
| St Paul Pumping Station Drainage Assessment City of Windsor | Windsor | Wastewater | complete | $125.0K | $250.0K | 2017 |
| System Evaluation and Implementation of Green Infrastructure for Stormwater Management Regional Municipality of Peel | Peel | Wastewater | complete | $125.0K | $250.0K | 2017 |
| Strathmere Court - Robinson Drive East to Robinson Drive West - Water Main Lining City of Greater Sudbury | Greater Sudbury | Drinking Water | complete | $125.0K | $250.0K | 2016 |
| Water Line Bypass Caribou Road Town of Channel-Port aux Basques | Channel-Port aux Basques | Drinking Water | complete | $124.3K | $296.6K | 2016 |
| Replacement of wastewater, water, storm sewer and road infrastrucutre on Winnipeg Road and Toronto Boulevard in the village of Vanastra with the Municipality of Huron East Municipality of Huron East | Huron East | Wastewater | complete | $124.1K | $825.6K | 2017 |
| Sewer Main upgrade, with replacement of one sewer main approximately 170 meters long and replacement of one sewer main approximately 50 meters long Township of Ignace | Ignace | Wastewater | complete | $123.5K | $255.3K | 2017 |
| Bayfield Wastewater System Inflow and Infilitration Study Municipality of Bluewater | Bluewater | Wastewater | complete | $123.1K | $246.2K | 2017 |
| Steele Valley Stormwater Management Pond Rehabilitation and Repair Town of Ajax | Ajax | Wastewater | complete | $123.0K | $246.0K | 2017 |
| Upgrade of brick manholes in numerous locations throughout Sturgeon Falls Municipality of West Nipissing | West Nipissing | Wastewater | complete | $121.9K | $250.0K | 2018 |
| Chlorine Booster Station Town of Howley | Howley | Drinking Water | complete | $121.4K | $245.1K | 2016 |
| Renewal of water pipes Municipality of Barraute | Barraute | Drinking Water | complete | $121.1K | $242.3K | 2017 |
| New Wastewater Pump Station Rural Municipality of Waverley No. 44 | Waverley No. 44 | Wastewater | complete | $121.1K | $242.1K | 2017 |
| Wastewater System Condition Assessment and Optimization Village of Tahsis | Tahsis | Wastewater | complete | $120.1K | $240.3K | 2017 |
| Yorkshire Drive - Culvert Replacement near Sewer Plant City of Greater Sudbury | Greater Sudbury | Wastewater | complete | $120.0K | $243.8K | 2018 |
| Lakeshore West Pollution Control Plant Effleunt Ultraviolet (UV) System Replacement Town of Kingsville | Kingsville | Wastewater | complete | $120.0K | $240.0K | 2017 |
| Engineering Design & Approvals for the Dorchester Wastewater Treatment Plant expansion to 1200 cubic meters capacity Municipality of Thames Centre | Thames Centre | Wastewater | complete | $120.0K | $240.0K | 2017 |
| Long-Term Wastewater Treatment Plant Upgrades Village of Lumby | Lumby | Wastewater | complete | $119.6K | $239.1K | 2017 |
| Water and Wastewater Infrastructure Network Study District of Sparwood | Sparwood | Wastewater | complete | $118.8K | $237.6K | 2017 |
| Treated Water Distribution Upgrades Warner No. 5 County | Warner | Drinking Water | complete | $118.1K | $315.0K | 2017 |
| Replacement of two 125 horsepower conventional aeration blowers with one 150 horsepower magnetic bearing blower at Regional Wastewater Treatment Plant (WWTP) Town of New Tecumseth | New Tecumseth | Wastewater | complete | $117.9K | $241.5K | 2017 |