7,621projects·$25.3Bfederal of $68.9B eligible
Rehabilitation of approximately 330m of Storm Sewer at 2409 County Road 4, Camden East Ontario to the Napanee River
$50.0KLennox and Addington · Wastewater
complete·approved 2017
Plummer Road Drainage and Erosion Improvements; install 750mm x 18m stormwater culvert along 300 metres of Plummer Road
$50.0KPlummer Additional · Wastewater
complete·approved 2017
Major Cleaning and Repainting including Operational Improvements of Mildmay Water Tower to ensure long term functionality
$50.0KSouth Bruce · Drinking Water
complete·approved 2017
New Construction of Dundalk Drinking Water Production Well and Pumphouse D5 250 Hahen Street East
$50.0KSouthgate · Drinking Water
complete·approved 2017
Rehabilitation and Realignment of Stormwater Drains for Paget and Rolling Meadows
$50.0KTillsonburg · Wastewater
complete·approved 2017
Allen Road installation of new 150 mm watermain to complete looping
$50.0KStrathroy-Caradoc · Drinking Water
complete·approved 2017
Blackwater Bridge Replacement with Outflow Stormdrain Culvert
$50.0KMcKellar · Wastewater
complete·approved 2017
Replacement of 350 Water System Meters
$50.0KDawn-Euphemia · Drinking Water
complete·approved 2017
Rehabilitation of Multiple Stormwater Assets within the Township including Ditch Excavation and the Upsizing of Culverts
$50.0KGillies · Wastewater
complete·approved 2017
Replace existing water standpipe with a larger volume standpipe to meet water pressures, fire flows, and foster economic growth
$50.0KChatsworth · Drinking Water
complete·approved 2017
Cured-in-Place Storm Sewer Rehabilitation on County Road 12 (Cockburn St.), Berwick Ontario
$50.0KStormont, Dundas and Glengarry≈ · Wastewater
complete·approved 2017
Installation of an Oil/ Grit Separator to improve stormwater at sewer outfall from Callander Court
$50.0KAjax · Wastewater
complete·approved 2017
Installation of an Oil/ Grit Separator to improve stormwater quality at sewer outfall from Caldicott Court
$50.0KAjax · Wastewater
complete·approved 2017
Hilldale Road and Trendiak Road Culvert Replacement Program
$50.0KThunder Bay · Wastewater
complete·approved 2017
Lyon Ditch Drainage Improvements including Increased Capacity
$50.0KThunder Bay · Wastewater
complete·approved 2017
Replacement of Sanitary Sewer connections on First Avenue: Memorial Avenue to Fort William Road
$50.0KThunder Bay · Wastewater
complete·approved 2017
Eight Street Storm Drainage Improvements
$50.0KBracebridge · Wastewater
complete·approved 2017
Replacement of Approximately 62 Stormwater Culverts Township Wide
$50.0KO'Connor · Wastewater
complete·approved 2017
Replace culverts and raise the grade of Leighton Road at various locations
$50.0KMachar · Wastewater
complete·approved 2017
High Lift Pump upgrades recirculation piping in the Dorchester Water Treatment Plant
$50.0KThames Centre · Drinking Water
complete·approved 2017
Upgrade Programmable Logic Controller (PLC)
$50.0KBlack River-Matheson · Drinking Water
complete·approved 2017
Investigate and implement a rehabilitation or treatment strategy for arsenic in the Dungannon Wells
$50.0KAshfield-Colborne-Wawanosh · Drinking Water
complete·approved 2017
Leeper Street replacement watermain from Shickluna Street to Hamilton Street
$50.0KSt. Catharines · Drinking Water
complete·approved 2017
Rehabilitation Project involving the Relining of Water Storage Tower that supports the Water Treatment System serving 500 Customers
$50.0KSables-Spanish Rivers · Drinking Water
complete·approved 2017
Upgrade/rehabilitation of storm sewers on Mill Street, village of St-Eugene that serves 12 residential houses and one (1) business.
$50.0KEast Hawkesbury · Wastewater
complete·approved 2017
Replacement and relocation of manhole to house the flow meter and replace the flow meter due to flooding
$50.0KCasey · Wastewater
complete·approved 2017
Sewage well upgrades at London Road Complex
$50.0KHuron · Wastewater
complete·approved 2017
Slope Excavation, Application of Geosynthetic Clay Liner, Regrading of the Failing Berm as well as required Engineering at the Baldwin Township Exfiltrating Lagoon
$50.0KBaldwin · Wastewater
complete·approved 2017
Stormwater Management Pond Refurbishment - Infrastructure Repairs and Pond Dredging - Multiple Locations
$50.0KBurlington · Wastewater
complete·approved 2017
Structural replacement/extension of the 600mm stormsewer at Arthur Street and regrading of surface drainage parallel to Lansdowne Ave
$50.0KCarleton Place · Wastewater
complete·approved 2017
Upgrade to main outlet pipe from Chapple Lagoon
$50.0KChapple · Wastewater
complete·approved 2017
Relocation and Replacement of Membrane Programmable Logic Controller (PLC) at the Little Current Water Treatment Plant
$50.0KNortheastern Manitoulin and The Islands · Drinking Water
complete·approved 2017
Upgrades to the Matachewan Stormwater Control System Located in an Area Covering 10 Municipal Streets between Calbeck Avenue and Helen Avenue
$50.0KMatachewan · Wastewater
complete·approved 2017
Accessible Transit Stop Upgrades of Up to 10-12 New Accessible Transit Stops
$50.0KPeterborough · Public Transit
complete·approved 2017
Public Access Extension for Designated Bus Stops
$50.0KPenetanguishene · Active Transportation
complete·approved 2017
Bicycle Detection Improvements at 4 intersections
$50.0KLondon · Active Transportation
complete·approved 2017
Implementation of a bulk fluid asset control system
$50.0KWindsor · Public Transit
complete·approved 2017
Installation of a new fuel storage tank to refuel buses
$50.0KSarnia · Public Transit
complete·approved 2016
Replace of manual fare boxes with electronic fare boxes on specialized transit vehicles (phase II)
$50.0KWelland · Public Transit
complete·approved 2016
Reconstruction of the Main Entrance at the Vernon Library
$50.0KOttawa · Culture
complete·approved 2010
North Englehart Management Unit (EMU) Road rehabilitation
$50.0KKirkland Lake · Highways and Roads
complete·approved 2010
Killbear Picnic Shelter
$50.0KNobel · Recreation
complete·approved 2010
Highway 7 and Edgeley Boulevard
$50.0KVaughan · Highways and Roads
complete·approved 2009
Multi-Purpose trail
$50.0KNiagara-on-the-Lake · Active Transportation
complete·approved 2009
Landfill Site Improvements
$50.0KArmour · Solid Waste Management
complete·approved 2009
Parks Rehabilitation
$50.0KSt. Joseph · Recreation
complete·approved 2009
Warsaw Community Centre
$50.0KDouro-Dummer · Recreation
complete·approved 2009
Replacement of Shewfelt Creek Bridge
$50.0KDesbarats · Highways and Roads
complete·approved 2005
Port Robinson South Main Street Bridge and Eco Park
$50.0KThorold · Capacity Building
complete·approved 2022
Wastewater Planning Study and Detailed Design, and Flow meter purchase
$50.0KKiashke Zaaging Anishinaabek (Gull Bay First Nation) · Wastewater
complete·approved 2018