2,320projects·$1.8Bfederal of $3.8B eligible
Plummer Road Drainage and Erosion Improvements; install 750mm x 18m stormwater culvert along 300 metres of Plummer Road
$50.0KPlummer Additional · Wastewater
complete·approved 2017
Major Cleaning and Repainting including Operational Improvements of Mildmay Water Tower to ensure long term functionality
$50.0KSouth Bruce · Drinking Water
complete·approved 2017
New Construction of Dundalk Drinking Water Production Well and Pumphouse D5 250 Hahen Street East
$50.0KSouthgate · Drinking Water
complete·approved 2017
Rehabilitation and Realignment of Stormwater Drains for Paget and Rolling Meadows
$50.0KTillsonburg · Wastewater
complete·approved 2017
Allen Road installation of new 150 mm watermain to complete looping
$50.0KStrathroy-Caradoc · Drinking Water
complete·approved 2017
Blackwater Bridge Replacement with Outflow Stormdrain Culvert
$50.0KMcKellar · Wastewater
complete·approved 2017
Replacement of 350 Water System Meters
$50.0KDawn-Euphemia · Drinking Water
complete·approved 2017
Rehabilitation of Multiple Stormwater Assets within the Township including Ditch Excavation and the Upsizing of Culverts
$50.0KGillies · Wastewater
complete·approved 2017
Replace existing water standpipe with a larger volume standpipe to meet water pressures, fire flows, and foster economic growth
$50.0KChatsworth · Drinking Water
complete·approved 2017
Cured-in-Place Storm Sewer Rehabilitation on County Road 12 (Cockburn St.), Berwick Ontario
$50.0KStormont, Dundas and Glengarry≈ · Wastewater
complete·approved 2017
Installation of an Oil/ Grit Separator to improve stormwater at sewer outfall from Callander Court
$50.0KAjax · Wastewater
complete·approved 2017
Installation of an Oil/ Grit Separator to improve stormwater quality at sewer outfall from Caldicott Court
$50.0KAjax · Wastewater
complete·approved 2017
Hilldale Road and Trendiak Road Culvert Replacement Program
$50.0KThunder Bay · Wastewater
complete·approved 2017
Lyon Ditch Drainage Improvements including Increased Capacity
$50.0KThunder Bay · Wastewater
complete·approved 2017
Replacement of Sanitary Sewer connections on First Avenue: Memorial Avenue to Fort William Road
$50.0KThunder Bay · Wastewater
complete·approved 2017
Eight Street Storm Drainage Improvements
$50.0KBracebridge · Wastewater
complete·approved 2017
Replacement of Approximately 62 Stormwater Culverts Township Wide
$50.0KO'Connor · Wastewater
complete·approved 2017
Replace culverts and raise the grade of Leighton Road at various locations
$50.0KMachar · Wastewater
complete·approved 2017
High Lift Pump upgrades recirculation piping in the Dorchester Water Treatment Plant
$50.0KThames Centre · Drinking Water
complete·approved 2017
Upgrade Programmable Logic Controller (PLC)
$50.0KBlack River-Matheson · Drinking Water
complete·approved 2017
Investigate and implement a rehabilitation or treatment strategy for arsenic in the Dungannon Wells
$50.0KAshfield-Colborne-Wawanosh · Drinking Water
complete·approved 2017
Leeper Street replacement watermain from Shickluna Street to Hamilton Street
$50.0KSt. Catharines · Drinking Water
complete·approved 2017
Rehabilitation Project involving the Relining of Water Storage Tower that supports the Water Treatment System serving 500 Customers
$50.0KSables-Spanish Rivers · Drinking Water
complete·approved 2017
Upgrade/rehabilitation of storm sewers on Mill Street, village of St-Eugene that serves 12 residential houses and one (1) business.
$50.0KEast Hawkesbury · Wastewater
complete·approved 2017
Replacement and relocation of manhole to house the flow meter and replace the flow meter due to flooding
$50.0KCasey · Wastewater
complete·approved 2017
Sewage well upgrades at London Road Complex
$50.0KHuron · Wastewater
complete·approved 2017
Slope Excavation, Application of Geosynthetic Clay Liner, Regrading of the Failing Berm as well as required Engineering at the Baldwin Township Exfiltrating Lagoon
$50.0KBaldwin · Wastewater
complete·approved 2017
Stormwater Management Pond Refurbishment - Infrastructure Repairs and Pond Dredging - Multiple Locations
$50.0KBurlington · Wastewater
complete·approved 2017
Structural replacement/extension of the 600mm stormsewer at Arthur Street and regrading of surface drainage parallel to Lansdowne Ave
$50.0KCarleton Place · Wastewater
complete·approved 2017
Upgrade to main outlet pipe from Chapple Lagoon
$50.0KChapple · Wastewater
complete·approved 2017
Relocation and Replacement of Membrane Programmable Logic Controller (PLC) at the Little Current Water Treatment Plant
$50.0KNortheastern Manitoulin and The Islands · Drinking Water
complete·approved 2017
Upgrades to the Matachewan Stormwater Control System Located in an Area Covering 10 Municipal Streets between Calbeck Avenue and Helen Avenue
$50.0KMatachewan · Wastewater
complete·approved 2017
City of Grand Forks 2017 Sewer Phasing Plan
$50.0KGrand Forks · Wastewater
complete·approved 2017
Crapaud Sewer Utility 2017 - Route 13 Upgrades
$50.0KCrapaud · Wastewater
complete·approved 2016
Replacement of the Primary Disinfection Storage and Dosing System at the Nanticoke Water Treatment Plant
$50.0KHaldimand · Drinking Water
complete·approved 2017
Water Well Upgrade
$50.1KCentral Butte · Drinking Water
complete·approved 2016
York Street - Regent Street to Paris Street - Sewer Main Lining
$50.4KGreater Sudbury · Wastewater
complete·approved 2018
Supervisory Control and Data Acquisition (SCADA) System Purchase and Installation
$50.6KTehkummah · Drinking Water
complete·approved 2017
Coldstream Sewer Line Extension
$50.9KColdstream · Wastewater
complete·approved 2017
Fraser Valley Regional District (FVRD) Electoral Area A: Boston Bar Water Systems Upgrade
$50.9KBoston Bar · Drinking Water
complete·approved 2017
Rebuild primary clarifier drive system
$51.3KDeer Lake First Nation · Wastewater
complete·approved 2017
Seacliff Trunk Sanitary Sewer Study to expand existing sanitary service area and eliminate weeping beds.
$51.3KLeamington · Wastewater
complete·approved 2017
Drilling of Well #4 the village of Norwood to increase capacity and reliability for our residents
$51.3KAsphodel-Norwood · Drinking Water
complete·approved 2017
2017 Sanitary Sewer Study
$51.5KBotwood · Wastewater
complete·approved 2017
New Septage Disposal System
$51.5KIndian Head No. 156 · Wastewater
complete·approved 2017
Supervisory control and data acquisition System For Water Treatment Plant
$51.6KMichipicoten First Nation · Drinking Water
complete·approved 2017
Water Distribution System Upgrade
$51.7KHanley · Drinking Water
complete·approved 2017
Replacement of Woodward Avenue Storm Sewers (Woodward Avenue and Castleguard Crescent)
$51.7KBurlington · Wastewater
complete·approved 2018
Manhole Replacement
$52.0KCow Head · Wastewater
complete·approved 2016
Water Distribution System Upgrade
$52.0KGravelbourg · Drinking Water
complete·approved 2017